Comments on: Glory days again for Eugene’s Center Court? /news/2009/12/16/beam-development-needs-tenants-for-project-loan/ Building and Construction News in Portland, Oregon and the Pacific Northwest Wed, 21 Apr 2010 18:28:51 +0000 hourly 1 https://wordpress.org/?v=6.6.6 By: Eugene’s Center Court starts construction « Daily Journal of Commerce – Building and Construction News in Portland, Oregon and the Pacific Northwest /news/2009/12/16/beam-development-needs-tenants-for-project-loan/#comment-20159 Wed, 21 Apr 2010 18:28:51 +0000 /?p=44400#comment-20159 […] in December told the Daily Journal of Commerce he needed to have 50 percent of the building pre-leased to get $5.2 million in U..S Housing and […]

]]>
By: Center Court starts construction « Daily Journal of Commerce – Building and Construction News in Portland, Oregon and the Pacific Northwest /news/2009/12/16/beam-development-needs-tenants-for-project-loan/#comment-20158 Wed, 21 Apr 2010 18:27:50 +0000 /?p=44400#comment-20158 […] in December told the Daily Journal of Commerce he needed to have 50 percent of the building pre-leased to get $5.2 million in U..S Housing and […]

]]>
By: anon /news/2009/12/16/beam-development-needs-tenants-for-project-loan/#comment-19919 Mon, 19 Apr 2010 23:39:41 +0000 /?p=44400#comment-19919 The suburban malls with subsidized freeways from downtown killed downtown. Later, closing the streets to create an outdoor mall was a failed effort to compete with the subsidized suburban malls. Ripping out the pedestrian mall downtown and opening the streets downtown has done nothing to improve downtown in the last decade.

]]>
By: Brett /news/2009/12/16/beam-development-needs-tenants-for-project-loan/#comment-7685 Wed, 23 Dec 2009 02:05:48 +0000 /?p=44400#comment-7685 Its unfortunate that Eugene still hasn’t learned from its mistakes. The City of Santa Monica had a similar experience vacating 3rd street and killing most of the existing business. However, in the late ’80’s, Private / public investment and a substantially updated street scape created a resurgence in the former mall. (The weather doesn’t hurt either.)

I grew up in Eugene in the 70’s and enjoyed my saturday matinee’s at the McDonald and Fox theaters (anybody remember Capt. Shipwreck?) and sunday family dinners at Seymours. Woolworths and JC Penneys were stops on my walk from Lincoln Elementary to home after school. Construction of the downtown mall coinciding with the new Valley River Mall, however, left many downtown businesses near failure.

I wish the best for Beam. I hope their investment coincides with others. It will require the synergy of a number of projects, tenants and uses to draw suburban eugene back to downtown.

]]>
By: Frank /news/2009/12/16/beam-development-needs-tenants-for-project-loan/#comment-7662 Tue, 22 Dec 2009 17:49:00 +0000 /?p=44400#comment-7662 Restoration of the wood windows in this building would be an exciting and vital part of the historical integrity of the structure. Let’s hope this will come to fruition!

]]>
By: jwpdx /news/2009/12/16/beam-development-needs-tenants-for-project-loan/#comment-7627 Mon, 21 Dec 2009 22:57:57 +0000 /?p=44400#comment-7627 Good luck on this project. Downtown Eugene is a vacant wasteland. It is an embarrassment that Oregon’s second city has such a basket case for the central city. It serves as a poor example of the mismanagement by City leaders.

]]>