Comments on: Edith Green-Wendell Wyatt building in time crunch /news/2011/09/28/edith-green-wendell-wyatt-building-in-time-crunch/ Building and Construction News in Portland, Oregon and the Pacific Northwest Thu, 20 Oct 2011 06:15:18 +0000 hourly 1 https://wordpress.org/?v=6.6.6 By: Tim /news/2011/09/28/edith-green-wendell-wyatt-building-in-time-crunch/#comment-68186 Thu, 20 Oct 2011 06:15:18 +0000 /?p=76892#comment-68186 Dave, you’re a **! Shut up unless you have facts to back up that black hole of a mouth. And who is that Barney Volk stud? He looks like a real man piece of candy!!!

]]>
By: Angela Webber /news/2011/09/28/edith-green-wendell-wyatt-building-in-time-crunch/#comment-68126 Thu, 29 Sep 2011 20:58:20 +0000 /?p=76892#comment-68126 Aaron: the building is getting a full seismic upgrade–that is required by the federal building guidelines, which Brunner says are stricter than your standard state-by-state building codes.

We’ve written about the seismic portion of the project before:

The contractor and architect told me that the upgrade has been – relatively, at least – easy, because so much weight is being removed from the structure by getting rid of the concrete exterior and replacing it with glass. When I toured the building, they showed be the bracing they’ve installed to add seismic stability.

If you’d like to read about all the aspects that are included in the modernization, read the GSA’s FAQ on their website for the project:

Thanks for the comment! Seismic upgrades are a serious concern in this city. You may know that the city code requires a seismic upgrade for building renovations over a certain amount, to address that concern.

]]>
By: Aaron Douglas /news/2011/09/28/edith-green-wendell-wyatt-building-in-time-crunch/#comment-68124 Thu, 29 Sep 2011 17:08:57 +0000 /?p=76892#comment-68124 I haven’t heard anything about whether this building is being made earthquake safe… I am not seeing anything that would lead me to believe that that is happening. With the 9.0 earthquake predicted to hit our region sometime in the not so distant future, is this building being upgraded to handle that? It still looks like the same skinny metal legs holding the entire thing up at this point without any cross-bracing.

]]>
By: dave /news/2011/09/28/edith-green-wendell-wyatt-building-in-time-crunch/#comment-68123 Thu, 29 Sep 2011 03:36:21 +0000 /?p=76892#comment-68123 What a waste of money. All this building needed was remodel, not a rebuilt. But when you are spending someone else’s money (in this case the feds), it’s ok to spend more money to remodel than any private developer ever would do so.

]]>