Comments on: Bend surface water project moves forward despite controversy /news/2012/04/27/bend-surface-water-project-moves-forward-despite-controversy/ Building and Construction News in Portland, Oregon and the Pacific Northwest Mon, 30 Apr 2012 21:01:34 +0000 hourly 1 https://wordpress.org/?v=6.6.6 By: Dennis McGee /news/2012/04/27/bend-surface-water-project-moves-forward-despite-controversy/#comment-69807 Mon, 30 Apr 2012 21:01:34 +0000 /?p=82544#comment-69807 These projects grow in scope sometimes because the larger design firms are geared to Panama Canal-sized projects and budgets. Why not let a smaller local engineer with local expertise (that would not be us) examine the remaining project, carefully vet qualifications with city. Break out of the mold and hire engineering in an open (as opposed to fixed) market. All engineers generally carry insurance commensurate to project risk, they are all equivalently registered, and the small firms are suprisingly loaded with talent. There would be many reasons a smaller local ( Oregon-based) firm would want to do such a project well. They may have to bolster staff, but there is a lot of available local talent out there. That’s what the big boys do! This project is not rocket science.

]]>
By: Bill /news/2012/04/27/bend-surface-water-project-moves-forward-despite-controversy/#comment-69802 Mon, 30 Apr 2012 18:46:55 +0000 /?p=82544#comment-69802 The City’s independent Value Engineering Team never studied any water supply alternatives or point of diversion alternatives other than the expensive one the City chose. In fact, the City expressly instructed the VE Team not to scrutinize other supply alternatives or diversion points. (See VE Report at page 1-2.) Mayor Eager’s point–that there was independent review of these decisions–is either incorrect, or was taken out of context.

]]>