TopProjects 2022 – Daily Journal of Commerce /news/category/topprojects-2022/ Building and Construction News in Portland, Oregon and the Pacific Northwest Fri, 02 Sep 2022 19:54:00 +0000 en-US hourly 1 https://wordpress.org/?v=6.6.6 /files/2023/08/favicon.webp TopProjects 2022 – Daily Journal of Commerce /news/category/topprojects-2022/ 32 32 91视频 TopProjects 2022 – 3rd Place – Office – Tenant Improvement & Major Renovation /news/2022/09/02/djc-topprojects-2022-3rd-place-office-tenant-improvement-major-renovation/ Fri, 02 Sep 2022 19:54:00 +0000 /?p=269608 3rd Place – Office – Tenant Improvement & Major Renovation 220 NW 2nd Avenue Lobby Repositioning Location: Portland Cost: $8,839,984 Start: February 2020 Completion: February 2021 Owner/Developer: Specht Properties Architect: […]

The post 91视频 TopProjects 2022 – 3rd Place – Office – Tenant Improvement & Major Renovation appeared first on Daily Journal of Commerce.

]]>

3rd Place – Office – Tenant Improvement & Major Renovation
220 NW 2nd Avenue Lobby Repositioning

Location: Portland
Cost: $8,839,984
Start: February 2020
Completion: February 2021
Owner/Developer: Specht Properties
Architect: SERA Architects
Engineer: SERA Architects
General Contractor: Howard S. Wright, a Balfour Beatty Company
Submitting Company: Howard S. Wright, a Balfour Beatty Company
Subcontractors: A2 Fabrication, A2 Metals, Alliant Systems, Anderson Sandblasting, Arctic Sheet Metal, Brian Berg, Chambers Brothers Door & Frame Specialties, Clean World Maintenance, Columbia Cascade, Culver Glass, DLM, Don Herbst Painting, Faustrollean Fixture, Fulcrum Exteriors, Green Art Landscaping, Hal Flake, Hal鈥檚 Construction, Harlen鈥檚 Drywall, Interior-Exterior Specialist, LDC, Michael鈥檚 Precast Concrete, Mt. Hood Window Coverings, Northwest Scaffold Service, Otis Elevator, PFL Spaces US, Quick Crete Products, Red Hawk Fire Protection, Renwil, Roedel Tile Contracting, Shaw Contract Flooring Services PDX, SI Contracting, Stoner Electric, WH Cress

In 1984, 220 NW 2nd was envisioned as the beginning of a redevelopment renaissance for Old Town, but the redevelopment never happened. With the departure of the building鈥檚 anchor tenant, a major repositioning effort was possible. The project consisted of a complex ground floor and lobby renovation and included extensive improvements to the ground floor fa莽ade, interior lobby, common areas, tenant spaces, and conferencing center.

The lobby ceiling was raised up to 12 feet to provide more openness and allow additional light to enter the building. Additional space was added behind the main reception to allow for a seating area, pre-function space, and large conference room.

The building shell had uninsulated glass that was replaced with high efficiency SolarBan-70 insulated units. The main floor HVAC system was replaced with a VRF system. New LED lighting was provided throughout with a one-of-a-kind stretch fabric 3D light measuring 25 feet in diameter as the focal point of the lobby. Contractors repaired leaking from the building plaza into the underground parking garage.

The project removed site pavements down to the structural slab garage lid, replaced the waterproofing and provided new architectural concrete pavements. The building fa莽ade was mostly brick, which was waterproofed and covered with metal panels.

The post 91视频 TopProjects 2022 – 3rd Place – Office – Tenant Improvement & Major Renovation appeared first on Daily Journal of Commerce.

]]>
91视频 TopProjects 2022 – 1st Place – Primary Education – Large /news/2022/09/02/djc-topprojects-2022-1st-place-primary-education-large/ Fri, 02 Sep 2022 19:19:19 +0000 /?p=269599 1st Place – Primary Education – Large Lakeridge Middle School Location: Portland Cost: Not disclosed Start: October 2017 Completion: August 2021 Owner/Developer: Portland Public Schools Architect: Opsis Architecture Engineers: ABHT […]

The post 91视频 TopProjects 2022 – 1st Place – Primary Education – Large appeared first on Daily Journal of Commerce.

]]>

1st Place – Primary Education – Large
Lakeridge Middle School
Photos by Johnny Boyce/General Sheet Metal

Location: Portland
Cost: Not disclosed
Start: October 2017
Completion: August 2021
Owner/Developer: Portland Public Schools
Architect: Opsis Architecture
Engineers: ABHT Structural Engineers, Harper Houf Peterson Righellis, KPFF
Other Associates/Consultants: CBRE | Heery, DAO Architecture (partner architect)
General Contractor: Fortis Construction
Submitting Company: General Sheet Metal and Opsis Architecture
Subcontractors: ACL Construction, Apollo Sheet Metal dba Apollo Mechanical Contractors, Brandsen Hardwood Floors, Brix Paving Northwest, Building Material Specialties, Cash鈥檚 Drapery, Center Pointe Signs, CGC Industries dba Culver Glass, Cordon Johnson & Associates, Consurco, Contech Services, D&R Masonry Restoration, DeaMor Associates, Don Frank Floors, Don Herbst Painting, Drake鈥檚 Striping and Painting, EC, Elmer鈥檚 Flag and Banner, Everlast Climbing Industries, Faison Construction, Field Turf USA, Finish Line Concrete Cutting, General Sheet Metal, G.R. Morgan Construction, Gibson Door & Millwork, Gill Group, Hiap Tong Crane & Transport Pte, Huntco Supply, Interior Technology, J&S Masonry, J.S. Perrott & Co., Jamison Door, Kone, Konell Construction & Demolition, Laboratory Design & Construction, McDonald & Wetle, Nationwide Lifts Oregon, Nor-Pac Seating, Northstar CG, Northwest Precast, Northwest School Equipment, Nystrom, Performance Contracting, Portland Coatings, Professional Minority Group, Ramsay Signs, Rubenstein鈥檚 Contract Carpet, Spectra Contract Flooring, SportaFence Marketing Enterprises, Sportsfield Specialties, Stagecraft Industries, SteelFab Oregon dba L&M Industrial Fabrication, Teufel Landscape, Town & Country Fence of Oregon, Urban Bicycle Parking Systems, Western States Fire Prot ection, WFJ Janitorial Services, Whitaker/Ellis Builders, Won-Door

The new 300,000-square-foot Leodis V. McDaniel High School High School (formerly Madison High School) transforms an outdated 1958 facility into a 21st-century learning environment.

Approximately 60 percent of the original school was demolished and upgraded with more than 170,000 square feet of new construction. Fortis modernized other buildings throughout the campus while increasing capacity from 1,150 to 1,700 students.

A new wing for science, technology, engineering and math (STEM), and a separate new wing for performing arts and career technical education create state-of-the-art environments for music, theater, robotics, engineering and digital-media labs. A new athletics area features a 1,700-seat gym, auxiliary gym and weight room.

The campus had 70 鈥渄rywells鈥 鈥 a deep version of a manhole with precast concrete rings where storm water is dumped to reinfiltrate into the subgrade 鈥 that were decommissioned and replaced. One hazmat consultant called the old building a 鈥渕onument to asbestos鈥 and $10 million was spent on abatement.

Fortis helped Portland Public Schools select an HVAC system that set new standards for the district, prioritizing maintenance, high efficiency, and flexibility.
General Sheet Metal used a robotic total station that allowed its team to lay out the architectural panels in a 3-D model for easier visualization and precise fabrication.

When the original GMP of $169 million was approved, it became the largest-ever executed in the history of Portland Public Schools.

Fortis partnered with Professional Minority Group, an MBE/DBE/WBE/ESB firm, in several aspects of the build. A LEED Gold certification was achieved within the budget. 鈥淕reen鈥 features include a series of new and efficient HVAC systems and a 300kw rooftop solar array that will contribute 21 percent of the annual electricity use. The project is a fitting tribute to its namesake, Leodis V. McDaniel, a highly respected leader who led Madison High School as principal in the 1970s and 1980s.

The post 91视频 TopProjects 2022 – 1st Place – Primary Education – Large appeared first on Daily Journal of Commerce.

]]>
91视频 TopProjects 2022 – 2nd Place – Primary Education – Large /news/2022/09/02/djc-topprojects-2022-2nd-place-primary-education-large/ Fri, 02 Sep 2022 18:16:12 +0000 /?p=269596 2nd Place – Primary Education – Large Lakeridge Middle School Location: Lake Oswego Cost: $73 million Start: December 2018 Completion: August 2021 Owner/Developer: Lake Oswego School District Owner鈥檚 Representative/Project Manager: […]

The post 91视频 TopProjects 2022 – 2nd Place – Primary Education – Large appeared first on Daily Journal of Commerce.

]]>

2nd Place – Primary Education – Large
Lakeridge Middle School

Location: Lake Oswego
Cost: $73 million
Start: December 2018
Completion: August 2021
Owner/Developer: Lake Oswego School District
Owner鈥檚 Representative/Project Manager: CBRE | Heery
Architect: Mahlum Architects
Engineers: KPFF Consulting Engineers, PAE Consulting Engineers
General Contractor: Skanska USA Building
Submitting Company: Skanska USA Building
Subcontractors: All Source Construction Supply, Arrakis Professional Services, Bar M Steel Commercial, Bell Hardware, Brandsen Floors, Brix Paving, Building Materials Specialties, Clima-Tech, Consurco, Crossfire Sprinkler, Cut Above, Davidsons Masonry, Dennis鈥 Seven Dees Landscaping, DSL Builders, Elmer鈥檚 Flag and Banner, Flynn BEC, Gibson Door & Millwork, GR Morgan, Highwire, Huntco Supply, Hydrotemp Mechanical, Interior Technology, Interstate Sheet Metal, LaRusso Concrete, Merit Contractors of Oregon, Moore Excavation, Newjee dba Hyphn, Nor-Pac Seating, Northwest School Equipment, Performance Abatement Service, Portland Coatings dba Williamsen & Bleid, Portland Electrical Construction, Sawtooth Caulking, Smith and Greene, Stagecraft Industries, Straight Up Carpentry, Superior Interiors, ThyssenKrupp Elevator, Town and Country Fence, South Town Glass, Tube Art Group, Willamette Valley Security, Western Partitions

The Lakeridge Middle School project involved the phased replacement of Bryant Elementary School and Waluga Junior High School with a single, new middle school for 1,100 students.

The team built modular classrooms in the location of the future parking lot for school operations to continue during construction. Phase one of the project involved demolition of Bryant Elementary, construction of the 138,000-square-foot new school, site work and providing access to the school. Phase two included demolition of Waluga Junior High, construction of the parking lot, landscaping, right-of-way improvements and restoring the ballfields.

One of the project鈥檚 goals was to create a highly sustainable building. This was accomplished by utilizing mass timber in the school, re-using materials from the site and installing a passive ventilation system and smart technology. The passive ventilation system signals to teachers and students when they should open or close windows to maximize natural heating and cooling. The school also was designed and built to accommodate a future green energy solar panel array as part of the Energy Trust of Oregon Path to Net Zero Energy program.

The new school uses seven specialty timber products, including WholeTrees, parallel strand lumber, dowel laminated timbers, laminated veneer lumber, tongue and groove decking, glue laminated beams and tapered GLBs.

The post 91视频 TopProjects 2022 – 2nd Place – Primary Education – Large appeared first on Daily Journal of Commerce.

]]>
91视频 TopProjects 2022 – 3rd Place – Primary Education – Large /news/2022/09/02/djc-topprojects-2022-3rd-place-primary-education-large/ Fri, 02 Sep 2022 18:10:11 +0000 /?p=269592 3rd Place – Primary Education – Large Adrienne C. Nelson High School Location: Happy Valley Cost: $79.2 million Start: June 2019 Completion: August 2021 Owner/Developer: North Clackamas School District Owner鈥檚 […]

The post 91视频 TopProjects 2022 – 3rd Place – Primary Education – Large appeared first on Daily Journal of Commerce.

]]>

3rd Place – Primary Education – Large
Adrienne C. Nelson High School

Location: Happy Valley
Cost: $79.2 million
Start: June 2019
Completion: August 2021
Owner/Developer: North Clackamas School District
Owner鈥檚 Representative/Project Manager: OTAK CPM
Architect: Bora Architecture & Interiors
Engineer: PAE
General Contractor: Lease Crutcher Lewis
Submitting Company: Lease Crutcher Lewis
Subcontractors: A36 Structures, Advanced Welding & Steel, American National Services, Apollo Mechanical Contractors, Bar M Steel, Benchmark, Beynon Sports Surfaces, Black Diamond Homes, Brandsen Hardwood Floors, Building Material Specialties, Cadman Materials, Cascade Acoustics, Clima-Tech, Curtis Restaurant Equipment, Dallas Glass, DeaMor Associates, Ducharme, EC, Empire Painting, Farwest Steel Reinforcing, Fire Systems West, Floor Solutions, Frontier Door and Cabinet, General Tree, Glenco Creations, Goodfellow Bros., H2I Group, InsulPro Projects, Interior Technology, Interior/Exterior Specialist, JH Kelly, Klinger Masonry, McDonald & Wetle, Merit Contractors, MHW Savage Enterprises/Greenman Construction, Mobility Concepts, Nor-Pac Seating, Northwest School Equipment, Northwest Waterproofing, Nystrom, Olympian Precast, Pathway Design, Performance Contracting, Prestige Tile & Stone, Ramsay Signs, Skyline Sheet Metal, Southern Bleacher, Stagecraft Industries, Superior Interiors, Van Lom Concrete, Zochert Fence

The new Adrienne C. Nelson High School provides increased classroom space for students and creates equity with other district high schools.

The first step toward realizing the new school was executing the construction of Rock Creek Middle School, completed in 2010 with the intent to one day convert and expand into a high school. In 2016 this dream became a reality with a successful bond measure funding the 140,000-square-foot addition to the middle school that would create the new high school, named to honor the first Black woman appointed to the Oregon Supreme Court.

Along with increasing building energy efficiency and student safety, the design upgraded the middle school facility with all the requisite elements of a high school, including improved classroom technology infrastructure for STEM and vocational education programs.

A performing arts wing includes a black box theater and a 600-seat auditorium. The athletic wing provides a weight room, wrestling room, and new varsity gym alongside the renovated existing main gym. A two-story classroom wing adds 16 new classrooms, including two chemistry labs, and a career center and counseling center.

The 66-acre site features new exterior athletic facilities, including a football stadium and track with covered bleachers, a press box, and a varsity baseball field.

The post 91视频 TopProjects 2022 – 3rd Place – Primary Education – Large appeared first on Daily Journal of Commerce.

]]>
91视频 TopProjects 2022 – 1st Place – Primary Education – Small /news/2022/09/01/djc-topprojects-2022-1st-place-primary-education-small/ Thu, 01 Sep 2022 21:51:42 +0000 /?p=269536 1st Place – Primary Education – Small Nestucca Valley K-8 School Expansion Location: Cloverdale Cost: $25,861,960 Start: June 2019 Completion: August 2021 Owner/Developer: Nestucca Valley School District #101 Owner鈥檚 Representative: […]

The post 91视频 TopProjects 2022 – 1st Place – Primary Education – Small appeared first on Daily Journal of Commerce.

]]>

1st Place – Primary Education – Small
Nestucca Valley K-8 School Expansion
Photos by Diego Diaz

Location: Cloverdale
Cost: $25,861,960
Start: June 2019
Completion: August 2021
Owner/Developer: Nestucca Valley School District #101
Owner鈥檚 Representative: Day CPM
Architect: DLR Group Architecture & Engineering
Engineers: DLR Group Architecture & Engineering (MEP), ZCS Engineering and Architecture (civil, structural)
Other Associates/Consultants: 2.ink Studio (landscape architect), B.E.E. Consulting (building envelope consultant), Cascade Earth Sciences, Halliday Associates (food service)
General Contractor: O鈥橞rien & Company
Submitting Company: Otak
Subcontractors: A-Max Hardwood Floors, Architectural Metalcrafters, Arizona Courtlines, Baker Rock, BMS, Cascade Casework, Cascade Earth Sciences, Cole Surveying, Curtis Restaurant Equipment, Dr. Roof, DSL Builders, Encore Glass, Functional Surfacing, Inland Electric, Interior Technology, Lawson Excavation, LDC, Mckillip Drywall, Milne Masonry, NB Hardwood, Newberg Steel and Fabrication, Nor-Pac Seating, North Star Industries, Northwest Mechanical, O鈥橞rien & Co., Olson Asphalt Maintenance, Proside Construction, RCI Architectural Sheet Metal, RK Concrete, Rubenstein鈥檚 Contract Carpet, Sandy鈥檚 Nursery & Landscaping, Shields Painting, Sierra Pacific Windows, Solid Form Fabrication, Sprinkit Fire Protection, Steve Cron Masonry, Steven W Broders, Stonhard, Terry鈥檚 Plumbing, Vaughn鈥檚 Services, Zochert Fencing

The Nestucca Valley project added 45,500 square feet to the existing 1950s-era campus, creating room to expand from K-5 to K-8 to serve 380 students. The new school features a double gymnasium, library and media center, music room, alternative education classroom, CTE 鈥渕aker space,鈥 administration and district offices, six new classrooms, a commercial kitchen and commons/cafeteria, secure-entry vestibules, individual-room VRF HVAC heating and cooling units, and a potable water filtration system. In addition, a 60,000-gallon underground water storage meets firefighting needs.

Located above the tsunami impact zone and meeting seismic codes, the new building also can serve as a community emergency center 鈥 as it already has during the Otis wildfires of summer 2021, and again when people of Neskowin were rescued from winter floods. The grass playfield provides a landing area for Coast Guard and Air National Guard helicopters.

Any school project carries considerable community expectations 鈥 and the Covid-19 pandemic produced even more challenges. But when distance learning began in March 2020, Otak started earlier and completed its work three months early and $3 million under budget. The savings enabled the district to replace a CTE program building at the high school.

In a rural setting, the only public utilities were electricity and cable internet. Septic tanks and leach fields had to be replaced and expanded. With no natural gas service, the heating system, hot water plumbing, kitchen, and emergency generator are powered by propane.

Many homes in south Tillamook County had no broadband internet, and those that did were unable to support distance-learning platforms. The district partnered with local business to install a network of radio wave towers, repeaters, and in-home hotspot units linked to the K-8 network, along with coastal towers and other points of connection. Now, internet access is available to more than 99 percent of district students at lower rates.

The Tillamook County community will benefit from this facility not only as an educational venue but as a community rallying point. And because 64 percent of the subcontractors were based within 50 miles, much of the project was reinvested in the community.

Misty Wharton, Nestucca Valley school district superintendent, wrote in her project recognition letter: 鈥淚 am very proud of how this project turned out and confident it will serve the community well for the next 70+ years!鈥

The post 91视频 TopProjects 2022 – 1st Place – Primary Education – Small appeared first on Daily Journal of Commerce.

]]>
91视频 TopProjects 2022 – 2nd Place – Primary Education – Small /news/2022/09/01/djc-topprojects-2022-2nd-place-primary-education-small/ Thu, 01 Sep 2022 20:28:11 +0000 /?p=269532 2nd Place – Primary Education – Small Marrion Elementary School Location: Vancouver, Washington Cost: Not disclosed Start: June 2020 Completion: July 2021 Owner/Developer: Evergreen School District No. 114 Owner鈥檚 Representative: […]

The post 91视频 TopProjects 2022 – 2nd Place – Primary Education – Small appeared first on Daily Journal of Commerce.

]]>

2nd Place – Primary Education – Small
Marrion Elementary School

Location: Vancouver, Washington
Cost: Not disclosed
Start: June 2020
Completion: July 2021
Owner/Developer: Evergreen School District No. 114
Owner鈥檚 Representative: R&C Management Group
Architect: LSW Architects
Engineer: Robertson Engineering (civil), WRK Engineers (structural)
General Contractor: Perlo Construction
Submitting Company: Perlo Construction
Subcontractors: 3 Kings Environmental, Acousti-Level Systems, A-Gas US, AirView Cinematogrpahy, A-Line Concrete Cutting, All Star Glass, American Direct Procurement, American National Insulation, American Welding Services, Apex Mechanical, Arbet dba NW Flooring Solutions, Arrow Roofing & Sheet Metal, Authority Dock & Door, Belshire Concrete Restoration, Brennock, Building Material Specialties, Cadman Materials, Columbia West Engineering, Cosco Fire Protection, Davidson鈥檚 Masonry, Drake鈥檚 Striping and Painting, Floor Solutions, Frontier Electric of WA, Huntco Supply, Interior Technology, Irwin Seating, Long Painting, Martin Sheet Metal, MK Fall Protection, Northwest Precast, Northwest School Equipment, Northwest Surveying, Nutter, NW Construction Services, Pacific Cabinets, Pacific Landscape Services, PBS Supply, Precision Rebar & Accessories, ProSteel, RIXIR Systems, Sawtooth Caulking, SDB, Silex Investments, Smith & Greene, Super Interiors, The Harver Co., Thyssenkrupp Elevator, Unlimited Fence, Vancouver Paving, WH Cress, Willamette Valley Steel, Wishart Welding & General Fabrication

The existing 50-year-old Marrion Elementary School was replaced by a new prototype school with a capacity for more than 500 students.

The new school is two stories, approximately 62,000 square feet and features an open-to-structure commons and media center, gymnasium, outdoor play area, freshly paved basketball court and access-controlled main entrance.

Emphasis was placed on having outdoor space that allowed for open-concept collaborative learning by creating a blend between landscaping and concrete. Teachers currently enjoy using these spaces for art and science classes, using the landscaping as an opportunity for future learning. The school also was intended to serve as a pillar to the community. With Vancouver City Park sitting adjacent to the campus, Marrion Elementary serves as a school for the neighborhood as well as the students.

Project teams had the unique chance to combine the building with learning opportunities for students. One of example of this includes the glass window that offers a glimpse into the manifold from the radiant floors, allowing students to learn about the different processes that went into making the building. The school鈥檚 鈥渢ree of life,鈥 a landmark located on the front of the campus, was preserved, with the team building a concrete bench around it.

The post 91视频 TopProjects 2022 – 2nd Place – Primary Education – Small appeared first on Daily Journal of Commerce.

]]>
91视频 TopProjects 2022 – 3rd Place – Primary Education – Small /news/2022/09/01/djc-topprojects-2022-3rd-place-primary-education-small/ Thu, 01 Sep 2022 20:20:49 +0000 /?p=269528 3rd Place – Primary Education – Small Sabin-Schellenberg Professional Technical Center Location: Clackamas Cost: $31,314,876 Start: March 2019 Completion: January 2021 Owner/Developer: North Clackamas School District Architect: DLR Group Engineer: […]

The post 91视频 TopProjects 2022 – 3rd Place – Primary Education – Small appeared first on Daily Journal of Commerce.

]]>

3rd Place – Primary Education – Small
Sabin-Schellenberg Professional Technical Center

Location: Clackamas
Cost: $31,314,876
Start: March 2019
Completion: January 2021
Owner/Developer: North Clackamas School District
Architect: DLR Group
Engineer: PBS Engineering & Environmental
General Contractor: P&C Construction
Submitting Company: P&C Construction
Subcontractors: 3 Kings Environmental, All Start Glass & Remodel, American Direct, Architectural Metalcrafters, Authority Dock & Door, Building Materials Specialties, Cascade Acoustics, Cedar Landscape Construction, D&R Masonry Restoration, Dennison Finn, Duke Construction & Excavation, Gibson Door & Millwork, Howser Steel, HVAC, IES Commercial, Insulation Contractors, Interior Technology, JM Painting, Lacey Glass, Lake Oswego Insulation, McCarthy Manufacturing, McDonald & Wetle, Northwest Engineering Service, Piper Plumbing, Portland Sheet Metal, Rubeinstein鈥檚, SEI Northwest, Staton Cos. ThyssenKrupp Elevator, WH Cress, Wallace Steel

This multi-phased project was secured under a single CM/GC contract and included concurrent work performed at five separate educational facilities over 21 weeks. Those sites included the Sabin and Schellenberg campuses, the Land Lab, District Technology Services and Camp Withycombe storage facility.

The Sabin-Schellenberg Professional Technical Center is focused on preparing students for both college and professional environments. The school consists of three campuses. The North Campus (Sabin) and the South Campus (Schellenberg) are located within a mile of each other in Milwaukie, while the Land Lab is located in Clackamas.

The Sabin Campus houses the District鈥檚 CTE program. Work included major renovations to the CTE facilities, allowing for program updates to manufacturing, engineering, automotive technology and construction trades. Extensive roof work, seismic improvements, a fire sprinkler system, technology upgrades, electrical upgrades, LED lighting, pavement improvements, interior/exterior painting, ceiling/flooring upgrades and greenhouse repairs were included.

Schellenberg Campus work involved a new, more secure fa莽ade/entryway, extensive roof work, seismic improvements, a fire sprinkler system, technology upgrades, door and window replacements, sewer line repairs, flooring, electrical upgrades, painting, new signage, restroom updates, HVAC upgrades and pavement improvements.

The post 91视频 TopProjects 2022 – 3rd Place – Primary Education – Small appeared first on Daily Journal of Commerce.

]]>
91视频 TopProjects 2022 – Honorable Mention – Primary Education – Small /news/2022/09/01/djc-topprojects-2022-honorable-mention-primary-education-small/ Thu, 01 Sep 2022 20:11:05 +0000 /?p=269522 Honorable Mention – Primary Education – Small Jim Tangeman Center Location: Vancouver, Washington Cost: $10,559,579 Start: December 2019 Completion: May 2021 Owner/Developer: Vancouver Public School District Architect: LSW Architects General […]

The post 91视频 TopProjects 2022 – Honorable Mention – Primary Education – Small appeared first on Daily Journal of Commerce.

]]>

Honorable Mention – Primary Education – Small
Jim Tangeman Center
Photo by Tapani

Location: Vancouver, Washington
Cost: $10,559,579
Start: December 2019
Completion: May 2021
Owner/Developer: Vancouver Public School District
Architect: LSW Architects
General Contractor: Tapani
Submitting Company: Tapani
Subcontractors: A and A Drilling, All County Concrete Cutting, All Star Glass, American Direct, Ascent Electric, Authority Dock and Door, Bergen Construction, Bryker Enterprises, CalPortland, Columbia Precast Products, Crew R. Construction, Columbia Steel, Curtis Restaurant Equipment, DeaMor Associates, Farwest Steel Reinforcing, Frontier Door & Cabinet, Greater Seattle Floors, H.D. Fowler, Hildebrand Concrete Construction, Hydro-Tech Fire Protection, Integrity Tree Care, Karvonen Sand & Gravel, M&C Construction, North Fork Landscape, Pacific Int-R-Tek, Pioneer Sheet Metal, Piper Mechanical, Prosteel, Ralph鈥檚 Concrete Pumping, RCP Shelters, RIXIR System, Roof Toppers, Sawtooth Caulking, Tikka Masonry, Timberland, Unlimited Fence, Valley Shades

The post 91视频 TopProjects 2022 – Honorable Mention – Primary Education – Small appeared first on Daily Journal of Commerce.

]]>
91视频 TopProjects 2022 – 1st Place – Public Facilities /news/2022/09/01/djc-topprojects-2022-1st-place-public-facilities/ Thu, 01 Sep 2022 18:28:29 +0000 /?p=269519 1st Place – Public Facilities Lake Oswego City Hall and Police Station Location: Lake Oswego Cost: $43 million Start: June 2017 Completion: September 2021 Owner/Developer: City of Lake Oswego Architect: […]

The post 91视频 TopProjects 2022 – 1st Place – Public Facilities appeared first on Daily Journal of Commerce.

]]>

1st Place – Public Facilities
Lake Oswego City Hall and Police Station
Photos by Christian Columbres

Location: Lake Oswego
Cost: $43 million
Start: June 2017
Completion: September 2021
Owner/Developer: City of Lake Oswego
Architect: Mackenzie
Engineer: Interface Engineering
Other Associates/Consultants: Otak
General Contractor: Howard S. Wright, a Balfour Beatty Company
Submitting Company: Mackenzie
Subcontractors: Andy Paris & Associates, Architectural Metalcrafters, Arctic Sheet Metal, Artek, BASCO, Benson Industries, Bratton Masonry, Brundage Bone, Building Materials Specialists, Cash鈥檚 Drapery, Consurco, Diverse Works, Eagle Striping Services, Fred Shearer & Sons, Green Kleen Pros, Instafab, Interior Technology, IRS Environmental, J.S. Perrott & Co., JH Kelly, Malcolm Drilling, MC Consultants, Morgan Holen & Associates, NV5, Northwest Scaffold Services, Otis Elevator, Pac Green Landscape, Pacific Excavation, Paulson鈥檚 Floor Covering, Peake Sun Control, Pioneer Waterproofing, R2M2 Rebar and Stressing, RDH Building Sciences, Schonert & Associates, Seagraves Landscape, Snyder Roofing, Spacesaver Specialists, SSA Acoustics, Staton Cos., Sturm Elevator, SunSteel, Team Electric, Valmont, Viking Automatic Sprinkler, Weitman Excavation, Western Partitions, Westlake Consultants, Willamette Valley Steel, Won-Door

When the City of Lake Oswego needed a new building for its police department, 911 dispatch, and city hall, it turned to the Mackenzie team to design a facility that would meet its current and future needs.

The new building鈥檚 three-story lobby links public interfaces for the police department, building department, administration, and court. The north side of the third floor houses the council chamber, which can double as a courtroom or an emergency operations center. The north elevator provides a secure path to escort detainees from the sally port in the basement to the courtroom through a secure vestibule.

To build a new city hall while maintaining municipal services, including the 911 call center and municipal courts, construction was approached in two phases that allowed continuous operations.

When the water table was found to be much higher than anticipated, the foundation system was changed from a traditional footing with slab-on-grade to a mat slab. Project duration was unaffected and there were no delay costs.

The COVID-19 pandemic created personnel challenges, escalating materials costs, and supply chain delays. To address these issues, the team implemented protective measures for personnel, identified and tracked internationally sourced materials, and developed contingency plans in case of material delays. In the end, not a single day of production was lost to the pandemic.

Additionally, nearby forest fires created air quality problems, and ice storms played havoc with schedules. Nevertheless, the project was delivered on time.
Throughout the project, target-value design (TVD) cost modeling ensured the final design aligned with the project budget. The design also specified an exterior of fiber-cement facade panels that required special training and close coordination with the supplier.

Lake Oswego鈥檚 municipal building is a bold step into the future as the city hall becomes a multipurpose location that welcomes the public. The building meets LEED Gold standards with low-flush toilets, LED lighting, and solar panels projected to provide 5 percent to 7 percent of the facility鈥檚 power.

Lake Oswego鈥檚 new municipal building represents improvements that will better serve the public for decades.

The post 91视频 TopProjects 2022 – 1st Place – Public Facilities appeared first on Daily Journal of Commerce.

]]>
91视频 TopProjects 2022 – 2nd Place – Public Facilities /news/2022/09/01/djc-topprojects-2022-2nd-place-public-facilities/ Thu, 01 Sep 2022 18:16:50 +0000 /?p=269499 2nd Place – Public Facilities Oregon City Engineering and Operations Complex Location: Oregon City Cost: $20 million Start: April 2019 Completion: November 2021 Owner/Developer: City of Oregon City Architect: Scott […]

The post 91视频 TopProjects 2022 – 2nd Place – Public Facilities appeared first on Daily Journal of Commerce.

]]>

2nd Place – Public Facilities
Oregon City Engineering and Operations Complex

Location: Oregon City
Cost: $20 million
Start: April 2019
Completion: November 2021
Owner/Developer: City of Oregon City
Architect: Scott Edwards Architecture
Engineers: Harper Houf Peterson Righellis (civil), Interface Engineering (MEP), WDY (structural)
Other Associates/Consultants: Harper Houf Peterson Righellis (landscape architect), JLD Cost Consulting (cost estimating)
General Contractor: Emerick Construction
Submitting Company: Scott Edwards Architecture
Subcontractors: Akon Curtain and Divider, American Direct, Building Materials Specialists, Cache Valley Electric, CalPortland, Cedar Landscape Construction, Coast Pavement Services, Cosco Fire Protection, Culver Glass, Custom Designed Skylights, D&H Flagging, Dealers Supply, Eastside Paving, Elmer鈥檚 Flag and Banner, Empire Painting, Engineered Products a Pape Company, Farwest Steel Reinforcing, Frontier Roofing, Hydro-Temp Mechanical, Inpro, Kraft Masonry, L.P., Lazer Site Surveying, Legend Custom Woodworking, MJ Hughes Construction, Mt. Hood Corps., Mt. Hood Cleaners and Window Coverings, N8 Excavation, Northwest Construction Services, Northwest Waterproofing, Oregon City Garage Door, Pathway Design, Paulson鈥檚 Floor Covering, Precision Test & Balance, Pure Floors, QED Labs, Ralph鈥檚 Concrete Pumping, RC Building Specialties, Red Built, Red Dog Fabrication, Sawtooth Caulking, Schindler Elevator, SDB Contracting Services, Steelport, Team Electric, TerraFirma Foundation Systems, Town & Country Fence of Oregon, TT&L Sheet Metal, Ultra Quiet Floors, UWD PreBuild, Wallace Steel, ZCS Engineering & Architecture

This project unifies a Class A office with a fleet maintenance facility, storage warehouse, and operations yard. The adaptive reuse of this former beverage distribution warehouse brings the city鈥檚 engineering department, public works operations crew, and parks operations crew all under one roof.

The city鈥檚 operations crews are located on the ground floor adjacent to locker rooms, washrooms, staff kitchen and break areas, allowing for efficient deployment. The engineering and executive staff are located on the second floor adjacent to conference rooms.

The structural upgrade of the existing building to a seismic level 4 presented challenges. The existing building consisted of tilt-up concrete construction, pre-engineered metal, wood framing, and light gauge steel framing from several additions or modifications over the life of the building. The team鈥檚 strategy utilized natural breaks between the typical construction assemblies and pre-engineered metal building along with leaning on the concrete tilt-up components of the original warehouse building. The existing concrete walls contained sufficient reinforcing such that strategically placed steel columns and enlarged column footings and stem walls met the performance criteria of the structural upgrade.

Glass is incorporated generously in the design. The feature staircase, lobby, and conference rooms can be seen from the exterior of the building.

The post 91视频 TopProjects 2022 – 2nd Place – Public Facilities appeared first on Daily Journal of Commerce.

]]>