Argyle Street Apartments – Daily Journal of Commerce /news/tag/argyle-street-apartments/ Building and Construction News in Portland, Oregon and the Pacific Northwest Fri, 17 Sep 2021 22:12:54 +0000 en-US hourly 1 https://wordpress.org/?v=6.6.6 /files/2023/08/favicon.webp Argyle Street Apartments – Daily Journal of Commerce /news/tag/argyle-street-apartments/ 32 32 Affordable housing construction keeping crews busy /news/2019/08/05/affordable-housing-construction-keeping-crews-busy/ Mon, 05 Aug 2019 15:50:30 +0000 /?p=192623 Several months after installation of a massive dry well, construction of the Argyle Street Apartments is in one of its busiest stages.

The post Affordable housing construction keeping crews busy appeared first on Daily Journal of Commerce.

]]>
Robert Betschart, a carpenter with Wood Mechanix, trims the edge of a prefabricated wall panel at the Argyle Street Apartments in North Portland. (Josh Kulla/91视频)
Robert Betschart, a carpenter with Wood Mechanix, trims the edge of a prefabricated wall panel at the in North Portland. (Josh Kulla/91视频)

Several months after installation of a massive dry well, construction of the Argyle Street Apartments, in Portland’s Kenton neighborhood, is in one of its busiest stages.

Crews are framing walls, installing mechanical and electrical and plumbing systems, placing windows, and wrapping the building with a weather barrier expected to help the project gain Earth Advantage gold certification.

Construction is the general contractor for the affordable housing project at 2133 N. Argyle St. REACH Community Development Corp. is developing the project, which was designed by .

Plans call for a single four-story building; however, the complex will more closely resemble a pair of buildings connected via a three-story sky-bridge spanning a ground-floor breezeway. The 189 apartments will be studios, or have one, two or three bedrooms.

Crews are working their way through the building from the ground floor up, Walsh Construction project engineer Scott Rascoe said. MEP subcontractors are not waiting for framing crews to get more than one floor ahead of them, either.

Currently, Wood Mechanix carpenters are framing the second story. Tapani Plumbing and O’Neill Electric employees are working on the ground floor while KO Contracting workers are installing double-glazed vinyl windows.

Use of prefabricated wall panels by Pacific Wall Systems of Olympia, Washington, has significantly reduced the number of carpenters needed, according to Rascoe. Instead of a crew of 30 to 40 carpenters framing walls by hand from scratch, barely half that number are not only framing walls, but also installing joists and sheeting walls, he said.

Wood Mechanix carpenter Jose Saucedo sets an I-joist in place. (Josh Kulla/91视频)
Wood Mechanix carpenter Jose Saucedo sets an I-joist in place. (Josh Kulla/91视频)
Wood Mechanix carpenters lift a wall panel into place. (Josh Kulla/91视频)
Wood Mechanix carpenters lift a wall panel into place. (Josh Kulla/91视频)
Rudy Perez, a journeyman plumber with Tapani Plumbing, secures a bracket that will hold a wastewater line. (Josh Kulla/91视频)
Rudy Perez, a journeyman plumber with Tapani Plumbing, secures a bracket that will hold a wastewater line. (Josh Kulla/91视频)
Building A will contain most of the property's 170 apartments. (Josh Kulla/91视频)
Building A will contain most of the property’s 170 apartments. (Josh Kulla/91视频)
Apprentice plumber Sean Caires of Tapani Plumbing solders a hot water recirculation line. (Josh Kulla/91视频)
Apprentice plumber Sean Caires of Tapani Plumbing solders a hot water recirculation line. (Josh Kulla/91视频)
Vanessa Diener, an apprentice electrician with IBEW Local 48 and an employee of O'Neill Electric, installs a wall socket on the second floor of Building B. (Josh Kulla/91视频)
Vanessa Diener, an apprentice electrician with IBEW Local 48 and an employee of O’Neill Electric, installs a wall socket on the second floor of Building B. (Josh Kulla/91视频)
A second-floor skybridge connects Buildings A and B. (Josh Kulla/91视频)
A second-floor skybridge connects Buildings A and B. (Josh Kulla/91视频)
Window installer Augustin Rocha of KO Contracting secures a vinyl window on the ground floor of Building B. (Josh Kulla/91视频)
Window installer Augustin Rocha of KO Contracting secures a vinyl window on the ground floor of Building B. (Josh Kulla/91视频)
Wood Mechanix carpenters Robert Betschart, left, and Lupe Arriaga move a prefabridated wall panel. (Josh Kulla/91视频)
Wood Mechanix carpenters Robert Betschart, left, and Lupe Arriaga move a prefabridated wall panel. (Josh Kulla/91视频)
KO Contracting employees Roberto Pi帽on, foreground, and Alejandro Rocha install a vinyl window on the ground floor of Building B. (Josh Kulla/91视频)
KO Contracting employees Roberto Pi帽on, foreground, and Alejandro Rocha install a vinyl window on the ground floor of Building B. (Josh Kulla/91视频)
Wood Mechanix carpenter Lupe Arriago drills an anchor bolt hole in a wall panel. (Josh Kulla/91视频)
Wood Mechanix carpenter Lupe Arriago drills an anchor bolt hole in a wall panel. (Josh Kulla/91视频)
A crew of Wood Mechanix carpenters lift a wall panel into place. (Josh Kulla/91视频)
A crew of Wood Mechanix carpenters lift a wall panel into place. (Josh Kulla/91视频)
Building B will be comprised entirely of residential units. (Josh Kulla/91视频)
Building B will be comprised entirely of residential units. (Josh Kulla/91视频)

The post Affordable housing construction keeping crews busy appeared first on Daily Journal of Commerce.

]]>
Affordable housing complex on the rise /news/2019/04/17/affordable-housing-complex-rise/ Wed, 17 Apr 2019 15:39:57 +0000 /?p=187723 Builders are working their way through a complicated drilling process at the Argyle Street Apartments project site in Portland's Kenton neighborhood.

The post Affordable housing complex on the rise appeared first on Daily Journal of Commerce.

]]>
Journeyman ironworker Juan Modera, a member of Local 29 and an employee of R2M2 Rebar and Stressing, cuts sections of rebar. (Josh Kulla/91视频)
Journeyman ironworker Juan Modera, a member of Local 29 and an employee of R2M2 Rebar and Stressing, cuts sections of rebar. (Josh Kulla/91视频)

A long vacant lot in North Portland is gaining .

Construction is serving as the general contractor for the Argyle Street Apartments, a 189-unit complex that is rising at the corner of Argyle Street and Interstate Avenue 鈥 in the Kenton neighborhood.

designed the complex, which technically is a single building. However, it’s more akin to a pair of neighboring structures connected by walkways. The two four-story structures will provide a total of 151,555 square feet of floor area.

The project is intended to serve low-income families and working adults. Longtime and displaced residents of North or Northeast Portland will have priority through the ‘s N/NE Neighborhood Housing Strategy.

After changes in the federal tax code reduced the value of low-income housing tax credits, developer REACH Community Development Corporation was forced to abandon plans for mixed-use programming.

Construction is under way, with crews tackling structural concrete work and sewer lines.

A 55-foot-deep dry well is being excavated this week, with a crew of pile drivers from Vancouver, Washington-based utilizing a massive Bauer BG 55 foundation drill rig to carry out the work.

A crew with Pacific Foundation uses foundation drill rig to place a caisson inside the shaft of a 55-foot deep dry well at the Argyle Street Apartments. (Josh Kulla/91视频)
A crew with Pacific Foundation uses foundation drill rig to place a caisson inside the shaft of a 55-foot deep dry well at the . (Josh Kulla/91视频)

鈥淲e’re working hard at getting some footings and columns and shear walls and stem walls built, and today we’re doing the rebar for the slab-on-grade that we’re going to pour, I believe, next week,鈥 said Laura Voss, a project engineer with Walsh Construction. 鈥淭hen we’ve been doing a lot of plumbing work over here, but it all kind of had to be paused until this rig gets out of the way.鈥

Originally there were supposed to be three separate dry wells, Walsh Construction project engineer Scott Rascoe said. But geotechnical analysis suggested one location would be superior.

To complete the job, a convoy of trucks delivered the drill rig, including a 6-foot-wide steel caisson that was used to shore up the walls of the dry well as the permanent concrete pieces were set into place. Setting the drill rig up for a single day’s work required three days of prep, Rascoe said, and then three more days were needed to break it down.

鈥淚t’s another load just to get the caisson out here,鈥 he said. 鈥淎nd then we’ll fabricate what’s left on site. It takes about one day to drill it. Then we’ll start testing it tomorrow 鈥 It’s a big process.鈥

On Monday, crews from Pacific Foundation and set the caisson and installed the concrete manholes inside before backfilling. Then the caisson was removed.

鈥淲e ended up going a lot deeper with the one location instead of having three separate dry wells on the site,鈥 Rascoe said. 鈥淭his is one of the largest drill rigs they actually have, which becomes an issue, because there are not many of them. There are only a couple of companies that even do this in the state, so to get someone who has the capability and the knowledge to do this is hard.鈥

The project team expects construction to finish next year.

Casey Foley, a journeyman plumber with Tapani Plumbing Inc., tamps down freshly excavated soil as he and his crew install sewer lines. (Josh Kulla/91视频)
Casey Foley, a journeyman plumber with Tapani Plumbing Inc., tamps down freshly excavated soil as he and his crew install sewer lines. (Josh Kulla/91视频)
Tapani Plumbing Inc. crews install sewer lines at the Argyle Street Apartments. (Josh Kulla/91视频)
Tapani Plumbing Inc. crews install sewer lines at the Argyle Street Apartments. (Josh Kulla/91视频)
Journeyman piledriver Eddie Cepurno, a member of Local 196 and an employee of Pacific Foundation, works on the bit of a drilling rig being used to excavate a dry well. (Josh Kulla/91视频)
Journeyman piledriver Eddie Cepurno, a member of Local 196 and an employee of Pacific Foundation, works on the bit of a drilling rig being used to excavate a dry well. (Josh Kulla/91视频)
Apprentice plumber Julian Martinez of Tapani Plumbing Inc. installs a section of sewer line. (Josh Kulla/91视频)
Apprentice plumber Julian Martinez of Tapani Plumbing Inc. installs a section of sewer line. (Josh Kulla/91视频)
Piledrivers with Pacific Foundation adjusts the position of the 6-foot wide caisson being used to drill a drywell 55 feet deep on the site of the Argyle Apartments. (Josh Kulla/91视频)
Piledrivers with Pacific Foundation adjusts the position of the 6-foot wide caisson being used to drill a drywell 55 feet deep on the site of the Argyle Apartments. (Josh Kulla/91视频)
Journeyman piledriver Eddie Cepurno, a member of Local 196 and an employee of Pacific Foundation, works on drilling equipment. (Josh Kulla/91视频)
Journeyman piledriver Eddie Cepurno, a member of Local 196 and an employee of Pacific Foundation, works on drilling equipment. (Josh Kulla/91视频)
(Josh Kulla/91视频)
(Josh Kulla/91视频)
Journeyman piledriver Eddie Cepurno, a member of Local 196 and an employee of Pacific Foundation of Vancouver, checks the level of the caisson being used to excavate a dry well. (Josh Kulla/91视频)
Journeyman piledriver Eddie Cepurno, a member of Local 196 and an employee of Pacific Foundation of Vancouver, checks the level of the caisson being used to excavate a dry well. (Josh Kulla/91视频)
Carpenters with RDF Builders construct formwork. (Josh Kulla/91视频)
Carpenters with RDF Builders construct formwork. (Josh Kulla/91视频)
Journeyman piledriver Eddie Cepurno, a member of Local 196 and an employee of Pacific Foundation of Vancouver, directs the operator of a Bauer BG 55 foundation drill rig. (Josh Kulla/91视频)
Journeyman piledriver Eddie Cepurno, a member of Local 196 and an employee of Pacific Foundation of Vancouver, directs the operator of a Bauer BG 55 foundation drill rig. (Josh Kulla/91视频)
Piledrivers with Pacific Foundation prepare a drilling rig being used to excavate a dry well. (Josh Kulla/91视频)
Piledrivers with Pacific Foundation prepare a drilling rig being used to excavate a dry well. (Josh Kulla/91视频)
Journeyman plumber Casey Foley, an employee of Tapani Plumbing Inc., tamps down freshly excavated soil over a sewer line. (Josh Kulla/91视频)
Journeyman plumber Casey Foley, an employee of Tapani Plumbing Inc., tamps down freshly excavated soil over a sewer line. (Josh Kulla/91视频)
Apprentice carpenter Daniel Perez, a member of Local 1503 and an employee of RDF Builders, affixes vapor barrier to a concrete support column. (Josh Kulla/91视频)
Apprentice carpenter Daniel Perez, a member of Local 1503 and an employee of RDF Builders, affixes vapor barrier to a concrete support column. (Josh Kulla/91视频)
Apprentice plumbers Josh DeHerrera (right) and Julian Martinez, both employees of Tapani Plumbing Inc., cut pieces of sewer pipe. (Josh Kulla/91视频)
Apprentice plumbers Josh DeHerrera (right) and Julian Martinez, both employees of Tapani Plumbing Inc., cut pieces of sewer pipe. (Josh Kulla/91视频)
An employee of Pacific Foundation secures a caisson being used to drill a dry well. (Josh Kulla/91视频)
An employee of Pacific Foundation secures a caisson being used to drill a dry well. (Josh Kulla/91视频)
One of the two buildings comprising the Argyle Apartments will feature post-tensioned concrete construction over a slab-on-grade foundation. (Josh Kulla/91视频)
One of the two buildings comprising the Argyle Apartments will feature post-tensioned concrete construction over a slab-on-grade foundation. (Josh Kulla/91视频)
Eddie Cepurno checks the level of the caisson being used to excavate a dry well. (Josh Kulla/91视频)
Eddie Cepurno checks the level of the caisson being used to excavate a dry well. (Josh Kulla/91视频)

The post Affordable housing complex on the rise appeared first on Daily Journal of Commerce.

]]>