Aura Burnside – Daily Journal of Commerce /news/tag/aura-burnside/ Building and Construction News in Portland, Oregon and the Pacific Northwest Wed, 22 Nov 2017 22:19:43 +0000 en-US hourly 1 https://wordpress.org/?v=6.6.6 /files/2023/08/favicon.webp Aura Burnside – Daily Journal of Commerce /news/tag/aura-burnside/ 32 32 Photos: Latest bridgehead project nears completion /news/2017/11/16/photos-latest-burnside-bridgehead-project-nears-completion/ Fri, 17 Nov 2017 00:25:19 +0000 /?p=169922 Aura Burnside, a six-story mixed-use housing project, is slated for substantial completion by the end of the year.

The post Photos: Latest bridgehead project nears completion appeared first on Daily Journal of Commerce.

]]>

The newest addition to the ever-growing Burnside bridgehead area is nearing completion. is winding down work on , a five-over-one mixed-use building with below-grade parking encompassing three-quarters of the block bounded by East Burnside Street and Northeast Couch Street, and Northeast Martin Luther King Jr. Boulevard and Grand Avenue.

The building contains 157 studio, one- and two-bedroom apartment units over flex retail space along both the Burnside Street and Grand Avenue frontages. Common residential areas include a rooftop patio with a fire pit and grill, a second-floor club room with a kitchen and dining area, and a ground-floor lobby with a fireplace and seating area. A bicycle storage facility will also contain a repair stand and a wash area able to also be used for pets.

The building’s top three floors are nearly complete, the third floor is in the punch-list phase, and levels one and two are in finish stages. Crews are also finishing site work, including pouring sidewalks, patching asphalt, and installing planters and first-floor siding. A temporary certificate of occupancy is expected for the project next week, and substantial completion is expected by the end of the year.

The project was developed by the Seattle office of Dallas, Texas-based , and designed by . is handling structural engineering, and Inc. is performing civil and landscape engineering.

1117_aura_burnside_sa_01_web

Many of the building's residential units feature floor-to-ceiling windows.
Many of the building’s residential units feature floor-to-ceiling windows.

1117_aura_burnside_sa_07_web

A sixth-floor balcony offers views of the Central Eastside and the downtown skyline.
A sixth-floor balcony offers views of the Central Eastside and the downtown skyline.

1117_aura_burnside_sa_05_web

1117_aura_burnside_sa_06_web

An arcade over the sidewalk running the length of Burnside Street was inspired by a 1932 photograph of a building with a prominent arcade that once stood on the project site. (Sam Tenney/91ÊÓÆµ)
An arcade over the sidewalk running the length of Burnside Street was inspired by a 1932 photograph of a building with a prominent arcade that once stood on the project site. (Sam Tenney/91ÊÓÆµ)
The building's commercial spaces feature 17-foot ceilings and roll-up doors.
The building’s commercial spaces feature 17-foot ceilings and roll-up doors.

The post Photos: Latest bridgehead project nears completion appeared first on Daily Journal of Commerce.

]]>