corridor improvements – Daily Journal of Commerce /news/tag/corridor-improvements/ Building and Construction News in Portland, Oregon and the Pacific Northwest Mon, 30 Jun 2025 15:51:25 +0000 en-US hourly 1 https://wordpress.org/?v=6.6.6 /files/2023/08/favicon.webp corridor improvements – Daily Journal of Commerce /news/tag/corridor-improvements/ 32 32 Linwood Corridor Improvements /news/2025/06/30/linwood-avenue-corridor-improvements/ Mon, 30 Jun 2025 15:51:25 +0000 /?p=510467 Linwood Avenue’s two-mile upgrade enhances traffic flow, safety, and active transit, with new signals, shared-use paths, and a pedestrian bridge.

The post Linwood Corridor Improvements appeared first on Daily Journal of Commerce.

]]>

The project revitalized a critical two-mile stretch of Southeast . Photo courtesy of HHPR
Project name: Linwood

Location: Milwaukie

Completion: April 2024

Cost: $10.8 million

Owners: , City of Milwaukie

Engineer: Harper Houf Peterson Righellis

General Contractors: D&D Concrete and Utilities, MEI Group

Submitting Company: Harper Houf Peterson Righellis

Other Associates/Key Consultants: Archaeological Investigations NW, DKS Associates, Epic Land Solutions, GeoDesign (NV5)

Subcontractors: D&D Concrete and Utilities: NAL Landscaping, Prairie Electric, S2 Contractors. Subcontractors: MEI Group: A+ Flagging, Aaken, American Concrete, Andres Landscape, Arck Construction, Auden Construction, Brothers Concrete Cutting, C&C Flagging, Carlson Testing, Coral Construction, Curtis Heintz Excavating, Cutter Construction, D&D Concrete and Utilities, Drain-Pro, Hicks Striping & Curving, Iron Horse, Mountain View Tree Services, KeyWest Retaining Systems, Knifer River, Vancouver Paving, West Coast Soil Solutions, Willamette Fence Co.

The Linwood Avenue Corridor Improvements project, completed through collaboration between the City of Milwaukie and Clackamas County Development Agency, has revitalized a critical two-mile stretch of Southeast Linwood Avenue from Southeast Harmony Road to Southeast Boulevard. Harper Houf Peterson Righellis led engineering efforts, with D&D Concrete & Utilities and MEI Group leading construction.

Prior to construction, Linwood Avenue was a typical minor arterial roadway that was built more than 50 years ago. The roadway was elevated higher than adjacent properties, with years of overlays and numerous utilities strewn throughout the corridor. Four separate water districts had facilities within the roadway – some abandoned and some cross connected as the area transitioned boundaries throughout the years. Because of this, lowering the roadway was not an option.

Within this two-mile stretch of roadway, 17 intersections and 146 driveways access Linwood Avenue. Extensive right-of-way coordination and acquisition was required with each and every property owner impacted by the widening.

A key feature of the project includes a new dedicated spanning Johnson Creek, installed as a cost-efficient alternative to modifying the existing vehicular bridge. The project also upgraded at key intersections and added rectangular rapid-flashing beacon crossings near Linwood Elementary School.

The improvements serve multiple elementary schools in the area, including Linwood, Seth Lewelling, Wichita, and Lot Whitcomb, while connecting residential neighborhoods to the popular Springwater Corridor Trail.

Engineers developed an innovative street design that combined bicycle lanes with sidewalks into shared-use facilities, reducing the overall width by 4 feet and saving approximately $500,000 in right-of-way and construction costs.

The project incorporated significant environmental benefits, decreasing impervious surface area by about 0.66 acres through pervious cycle tracks, sidewalks and landscaping. Stormwater planters with specialized media now remove sediment and treat roadway runoff, improving water quality in the Johnson Creek Basin.

Construction proceeded in three carefully planned stages to keep the arterial open throughout the project, with only a single day’s closure required to set the pedestrian bridge in place.

In early 2025, Clackamas County will construct the Monroe Street Greenway east of Southeast Linwood Avenue, while Milwaukie designs improvements west of Linwood, further expanding the region’s network.

The completed corridor represents a Tier 1 High Priority Project identified in the Clackamas County Transportation System Plan and was delivered on schedule and within budget despite challenges from the COVID-19 pandemic.

The post Linwood Corridor Improvements appeared first on Daily Journal of Commerce.

]]>