Highside Development – Daily Journal of Commerce /news/tag/highside-development/ Building and Construction News in Portland, Oregon and the Pacific Northwest Tue, 17 Aug 2021 14:42:39 +0000 en-US hourly 1 https://wordpress.org/?v=6.6.6 /files/2023/08/favicon.webp Highside Development – Daily Journal of Commerce /news/tag/highside-development/ 32 32 What’s coming before the Design Commission? /news/2021/08/13/whats-coming-design-commission/ Fri, 13 Aug 2021 21:35:08 +0000 /?p=259350 The Modera Main Street project, in Goose Hollow, is scheduled to reappear before the Portland Design Commission on Thursday. Plus, advice will be given for a new hotel and a mass-timber office building.

The post What’s coming before the Design Commission? appeared first on Daily Journal of Commerce.

]]>

The Portland meets throughout the year on the first and third Thursdays of each month. Here is a glimpse of projects the commission is scheduled to examine on Aug. 19:

Main-DR1 v9.6-21_0715_CMPLT2.indd
, as presented to the Design Commission earlier this month, would be 17 stories and hold 336 apartments. The project site is near the Multnomah Athletic Club. ()

Modera Main Street

Address: full block bounded by Southwest Salmon and Main streets and 19th and 20th avenues

Developer:

Architect: Ankrom Moisan Architects

This is continuation of a design review hearing that began Aug. 5. Previously, the project team proposing a 17-story, 434,720-square-foot building faced significant questions from the Design Commission.

The commission’s chairwoman, Julie Livingston, said she would vote against the project as designed currently because it would fail to activate its Main Street frontage.

“We are allowing a building to go up that acknowledges the nothingness of this block of Main,” she said. “All four of these frontages need to be active to be a strong response to public realm guidelines. I feel strongly enough about this that it will cause me to vote no.”

One hour is allotted for Thursday’s meeting. A final vote may or may not take place.

cambria-hotel
Portland, as proposed, would be a six-story, 174 building in Portland’s Pearl District. ()

Cambria Hotel Portland

Address: 105 and 135 N.W. Park Ave.

Developer:

Architect: SERA Architects

Engineers: Vega Civil Engineering and (structural)

HighSide Development of Denver, new to the Portland market, is seeking design advice for its proposed Cambria Hotel. It’s one of the Choice-branded hotels the developer is working on across the U.S., including downtown L.A.

The six-story Cambria Hotel Portland, designed by SERA Architects, is planned for the Pearl District. It would have 174 guest rooms and  look out onto Portland’s North Park Blocks.

The first floor would contain the hotel lobby, a restaurant and bar, meeting rooms, a fitness space, and a 1,900-square-foot tenant space.

lever-mass-timber_1
A 40,000-square-foot mass-timber office building is proposed for a Northwest Portland property. ()

Two office buildings

Address: 1706 N.W. 24th Ave.

Architect: LEVER Architecture

LEVER Architecture aims to make another notch in its mass-timber belt – this time with a 40,000-square-foot office building to serve as the new headquarters for a Portland-based creative agency. A design advice hearing is planned for Thursday. Patrick Kessi of 1706 LLC is the owner’s representative.

The proposed plan places the four-story mass-timber structure at the corner of Northwest 24th Avenue and Savier Street. A one-story accessory office building would be oriented along Northwest Thurman Street.

The project team is seeking adjustments to the minimum FAR (floor-area ratio) and building height.

The post What’s coming before the Design Commission? appeared first on Daily Journal of Commerce.

]]>