LaRusso Concrete – Daily Journal of Commerce /news/tag/larusso-concrete/ Building and Construction News in Portland, Oregon and the Pacific Northwest Wed, 13 May 2026 22:49:37 +0000 en-US hourly 1 https://wordpress.org/?v=6.6.6 /files/2023/08/favicon.webp LaRusso Concrete – Daily Journal of Commerce /news/tag/larusso-concrete/ 32 32 Oregon organizations recognize excellence in concrete work /news/2026/05/13/oregon-concrete-awards-top-projects-lifetime-achievement/ Wed, 13 May 2026 22:49:36 +0000 /?p=520930 Several exceptional projects recently were honored during the 46th annual Excellence in Concrete Awards banquet at the Sheraton Portland Airport Hotel.

The post Oregon organizations recognize excellence in concrete work appeared first on Daily Journal of Commerce.

]]>

ճOregon Concrete & Aggregate Producers Association (OCAPA) and the Oregon chapter of the (OACI) celebrated the top projects in their industry during the 46th annual Excellence in banquet on May 1 at the Sheraton Airport Hotel.

In addition, the organizations recognized Jim Lang of with the Lifetime Achievement Award. Lang has worked in the concrete industry for more than 40 years. Originally based in Denver, he moved to Seattle and then Portland, serving in various capacities with LaRusso from apprentice, cement mason and foreman, to superintendent, branch manager, president, owner and board chair.

In 1996, Lang opened LaRusso’s Portland branch, and in 2007 he purchased the company; he later sold it to his employees in 2018. He stayed on as president until retiring in 2023, and he remains the acting board chair.

Lang was a member of the Local 555 union his entire career. He was involved with OACI for several years in various roles, including as a board member, committee member and examiner. He is known for advocating for training and education of the next generation of leaders.

In addition, owners, architects, engineers, concrete suppliers, contractors and concrete finishers were recognized for their projects in Oregon and Southwest Washington. Projects were recognized for sustainability, innovation and design.

Eight category winners were selected:

US 97 & US 20 North Corridor (submitted photo)

Bridges

Project: US 97 & US 20 Bend North Corridor – Flyover Bridge, Bend

Owner/developer: state of Oregon

Engineer: Kiewit

General contractor: Kiewit

Concrete contractor: Marcum & Sons

Ready-mix supplier: Knife River

Inlow Hall Grand Staircase at in La Grande (submitted photo)

Decorative

Project: Inlow Hall Grand Staircase at Eastern Oregon University, LaGrande

Owner/developer: Eastern Oregon University

Engineer: AHBL

Architect: Peter Meijer Architect

General contractor: Garco Construction

Ready-mix supplier: RD Mac LaGrande Ready-Mix

Sports Center in Portland (Pence/Kelly Concrete)

Education

Project: Reed College Sports Center, Portland

Owner/developer: Reed College

Engineer: KPFF

Architect: ZGF Architects

General contractor: Fortis Construction

Concrete contractor: Pence/Kelly Concrete

Ready-mix supplier: Glacier Northwest/CalPortland

Concrete finishing: LaRusso Concrete

Additional contributor: R2M2 Rebar & Stressing

Palensky Highway 30 Wildlife Underpass in Portland (Whitaker/Ellis Builders)

Infrastructure

Project: Palensky Highway 30 Wildlife Underpass, Portland

Owner/developer: Columbia River Estuary Study Taskforce

Engineer: Murraysmith

Architect: Murraysmith

General contractor: Moore Excavation Inc.

Concrete contractor: Whitaker/Ellis Builders

Ready-mix supplier: CalPortland

Concrete finishing: Whitaker/Ellis Builders

QTS project in Hillsboro (Whitaker/Ellis Builders)

Low-rise

Project: QTS HIL2 – DC2, DC3, DC5, Hillsboro

Owner/developer: QTS

Engineer: Peoples Associates Structural Engineers (PASE)

Architect: Sheehan Nagle Hartray Architects

General contractor: HITT Contracting

Concrete contractor: Whitaker/Ellis Builders

Ready-mix supplier: CalPortland

Concrete finishing: Whitaker/Ellis Builders

Waterfront Block 7 Parking in Vancouver, Washington (Andrew Michaud/Marion Construction)

Mid-rise

Project: Waterfront Block 7 Parking, Vancouver, Washington

Owner/developer: Gramor Development

Engineer: JWSE Structural Engineers

Architect: International Parking Design

General contractor: Robertson & Olson Construction

Concrete contractor: Marion Construction

Ready-mix supplier: CalPortland

Concrete finishing: Industrial Concrete

Cottage Grove Main Street Revitalization (Dennis Montgomery, Wildish Construction)

Paving & Flatwork

Project: Cottage Grove Main Street Revitalization, Cottage Grove

Owner/developer: city of Cottage Grove

Engineer: Branch Engineering

Architect: Dougherty Landscape Architects

General contractor: Wildish Construction

Concrete contractor: Wildish Construction

Ready-mix supplier: RiverBend Materials, a CRH Company

Concrete finishing: Wildish Construction

DAS Executive Building in Salem (Brandon Daily, Pence/Kelly Concrete)

Repair & Restoration

Project: DAS Executive Building Renovation, Salem

Owner/developer: state of Oregon

Engineer: KPFF

Architect:

General contractor: Pence Contractors

Concrete contractor: Pence/Kelly Concrete

Ready-mix supplier: WCP

Concrete finishing: LaRusso Concrete

The post Oregon organizations recognize excellence in concrete work appeared first on Daily Journal of Commerce.

]]>
Concrete crews pour it on for mixed-use project /news/2019/11/27/concrete-crews-pour-mixed-use-project/ Wed, 27 Nov 2019 21:47:05 +0000 /?p=196838 The build-out of Northwest Portland is continuing apace, and general contractor Bremik Construction is doing its part for the six-story Saltwood North project.

The post Concrete crews pour it on for mixed-use project appeared first on Daily Journal of Commerce.

]]>
A crew of cement masons with Local 555 and LaRusso Concrete pour the foundation slab at Saltwood North. (Josh Kulla/91Ƶ)
A crew of cement masons with Local 555 and pour the foundation slab for the mixed-use building. (Josh Kulla/91Ƶ)

The build-out of Northwest is continuing apace, and general contractor is doing its part for the six-story Saltwood North project.

The mixed-use development was designed by for half of a superblock in Portland’s neighborhood. The six-story building will have 177 market-rate apartments above ground-floor retail space. There will be two levels of underground parking.

Bremik Construction is self-performing all structural concrete work, as well as installations of windows and wood siding.

Recently, LaRusso Concrete crews were at the site to assist with the largest single-day concrete pour Bremik Construction has carried out as a general contractor since it was founded in 2004. The pour of 1,700 cubic yards covered the first half of the building’s foundation slab; the second followed shortly thereafter.

“Kicking it off with the foundation obviously kicks off all of our vertical concrete and lets us go up instead of down,” Bremik Construction superintendent Josh Ring said.

Saltwood North is one half of the entire Saltwood project being developed by for owner on a master-planned block bordered by Northwest 20th and 21st avenues, and Savier and Quimby streets. Saltwood South (with only one level of underground parking) is being constructed by general contractor R&H Construction and will rise on a nearly identical parcel.

In total, Saltwood will provide 354 new apartments and 17,000 square feet of commercial space. Saltwood North alone will feature a spa, a swimming pool, a steam room, a sauna and other amenities like a rooftop deck and a lounge.

Ian Malsbury, foreground, and Rogelio Estrada, both journeyman cement masons with Local 555 and LaRusso Concrete employees, pour concrete at the Saltwood North mixed-use project in Northwest Portland. (Josh Kulla/91Ƶ)
Ian Malsbury, foreground, and Rogelio Estrada, both journeyman cement masons with Local 555 and LaRusso Concrete employees, pour concrete for Saltwood North in Northwest Portland. (Josh Kulla/91Ƶ)

Excavation and site work for Saltwood North began in August. Substantial completion is expected by winter 2021.

“It’s pretty exciting to be able to be involved with a good-sized pour like this,” Ring said. “We looked at trying to do this all in one whack, but it’s really tough to get all the variables to line up to work – weather being one of the most important. It’s got to time out.”

Work on the first concrete pour started at 2 a.m., Ring said, so that trucks would have easier access to the site. Crews poured about 290 yards per hour on average, which he called a really good rate.

“The challenge is if you try to pull this off on a weekday, the rush hour just kills you,” he said. “Having this dry November has been awesome. And from a concrete perspective we’ll probably be wrapping up about August with all the structural concrete. We’re just pumped right now to be able to start going vertical.”

Saltwood North is a half-block, six-story project developed by Prometheus Real Estate Group. (Josh Kulla/91Ƶ)
Saltwood North is a half-block, six-story project developed for Prometheus Real Estate Group. (Josh Kulla/91Ƶ)
Jason Cleveland, a journeyman cement mason with Local 555 and employee of LaRusso Concrete, uses a bull float to finish the floor of an elevator shaft. (Josh Kulla/91Ƶ)
Jason Cleveland, a journeyman cement mason with Local 555 and employee of LaRusso Concrete, uses a bull float to finish the floor of an elevator shaft. (Josh Kulla/91Ƶ)
Journeyman Mario Ornelas, left, operates a concrete screed as he leads a crew of cement masons in finishing a section of foundation slab. (Josh Kulla/91Ƶ)
Journeyman Mario Ornelas, left, operates a concrete screed as he leads a crew of cement masons in finishing a section of foundation slab. (Josh Kulla/91Ƶ)
Kelly Campbell, a journeyman cement mason with Local 555 and an employee of LaRusso Concrete, runs the nozzle. (Josh Kulla/91Ƶ)
Kelly Campbell, a journeyman cement mason with Local 555 and an employee of LaRusso Concrete, runs the nozzle. (Josh Kulla/91Ƶ)
Crews with Bremik Construction and LaRusso Concrete carry out the first of two 1,700-cubic-yard foundation slab pours at Saltwood North. (Josh Kulla/91Ƶ)
Crews with Bremik Construction and LaRusso Concrete carry out the first of two 1,700-cubic-yard foundation slab pours at Saltwood North. (Josh Kulla/91Ƶ)
Crews with LaRusso Concrete carried out two 1,700-cubic-yard slab pours over two weekends at the Saltwood North mixed-use project in Northwest Portland. (Josh Kulla/91Ƶ)
Crews with LaRusso Concrete carried out two 1,700-cubic-yard slab pours over two weekends for Saltwood North. (Josh Kulla/91Ƶ)
Mario Ornelas, second from left, operates a gas-powered concrete screed as a crew of cement masons finish a section of foundation slab. (Josh Kulla/91Ƶ)
Mario Ornelas, second from left, operates a gas-powered concrete screed as cement masons finish a section of foundation slab. (Josh Kulla/91Ƶ)
Journeyman cement mason Ray Pierce, a member of Local 555 and an employee of LaRusso Concrete, performs finish work. (Josh Kulla/91Ƶ)
Journeyman cement mason Ray Pierce, a member of Local 555 and an employee of LaRusso Concrete, performs finish work. (Josh Kulla/91Ƶ)
Ian Malsbury oeprates the nozzle as his crew pours a 1,700-yard foundation slab at Saltwood North. (Josh Kulla/91Ƶ)
Ian Malsbury oeprates the nozzle as his crew pours a 1,700-yard foundation slab at Saltwood North. (Josh Kulla/91Ƶ)
A crew of cement masons with Local 555 and LaRusso Concrete perform finish work. (Josh Kulla/91Ƶ)
A crew of cement masons with Local 555 and LaRusso Concrete perform finish work. (Josh Kulla/91Ƶ)

The post Concrete crews pour it on for mixed-use project appeared first on Daily Journal of Commerce.

]]>
Lake Oswego mixed-use building takes shape /news/2019/03/11/lake-oswego-mixed-use-building-takes-shape/ Mon, 11 Mar 2019 17:14:28 +0000 /?p=186390 A deck pour was carried out for the first floor of a four-story mixed-use building under construction in downtown Lake Oswego.

The post Lake Oswego mixed-use building takes shape appeared first on Daily Journal of Commerce.

]]>
Finishers and laborers with LaRusso Concrete and Bremik Construction pour a first-floor slab at Beacon Lake Oswego. (Sam Tenney/91Ƶ)
Finishers and laborers with and pour a first-floor slab at Beacon . (Sam Tenney/91Ƶ)

The first deck pour was carried out earlier this month for , a four-story mixed-use building that will bring office, retail and event space to the city’s downtown. Crews with Bremik Construction, the project’s general contractor, and placement and finishing subcontractor LaRusso Concrete carried out a 580-cubic-yard pour March 1 to form the first floor of the post-tensioned concrete structure.

The -designed building is located in the heart of Lake Oswego, along Third Street between B and C avenues. It is being developed by 10 Branch, a family office consisting of members of the Haladay family – including managing director Miles Haladay, formerly of , and his father, retired Viewpoint CEO and board chairman Jay Haladay.

According to Miles Haladay, a Lake Oswego resident, the family saw opportunities for niche event and office space in the city’s downtown core.

“We are firm believers in the downtown Lake Oswego area,” he said. “I like to call it a ‘boutique urban’ environment, an urban environment without the problems of downtown .”

Ironlight, the top-floor event center created by Haladay family members, was borne of a lack of options outside Portland to hold events with 200-250 person capacity. The top floor will feature two decks with panoramic views, so large weddings and other events can be held either indoors or outdoors as weather permits.

Beacon Lake Oswego will feature a top-floor event space, 30,000 square feet of co-working office space and ground-floor retail space. (Courtesy of Mackenzie)
Beacon Lake Oswego will feature a top-floor event space, 30,000 square feet of co-working office space and ground-floor retail space. (Courtesy of Mackenzie)

The second and third floors, meanwhile, will be occupied by CENTRL Office, a Portland-based co-working startup. Downtown Lake Oswego, Haladay says, offers an attractive alternative to Portland.

“I think people are going to get tired of the traffic downtown and look for other options to be working in,” he said. “Downtown Lake Oswego … provides the best of both worlds. Everything you need you can walk to, but you don’t have the traffic that you have to deal with in downtown Portland.”

The building will hold about 10,000 square feet of ground-floor retail space, some of which Haladay envisions being leased by a boutique market with coffee and grab-and-go food items. Parking for about 116 vehicles will be provided in below- and at-grade garage space.

Haladay cites recent growth in Lake Oswego’s downtown area, including PHK Development‘s Windward and Sturgeon Development Partners‘ North Anchor, as well as older projects like Gramor Development‘s Lake View Village, as evidence of a strong boutique urban core.

“Who’d have thought you’d have a Bamboo Sushi here, or a Salt and Straw, ten years ago?” he said. “I think this is just the beginning of downtown Lake Oswego becoming stronger and stronger.”

The project is scheduled for completion in early 2020, ideally in time for the first event at Ironlight – Jay Haladay’s 70th birthday party – to take place on Feb. 21.

Tim Mathis, an apprentice finisher with Local 555 and employee of LaRusso Concrete, runs the nozzle during a concrete pour at Beacon Lake Oswego. (Sam Tenney/91Ƶ)
Tim Mathis, an apprentice finisher with Local 555 and employee of LaRusso Concrete, runs the nozzle during a concrete pour at Beacon Lake Oswego. (Sam Tenney/91Ƶ)
Finishers with LaRusso Concrete smooth freshly placed concrete.
Finishers with LaRusso Concrete smooth freshly placed concrete.

0311_beacon_lake_o_02_web

Jose Chuc, a finisher with Local 555 and employee of LaRusso Concrete, smoothes recently poured concrete at Beacon Lake Oswego. (Sam Tenney/91Ƶ)
Jose Chuc, a finisher with Local 555 and employee of LaRusso Concrete, smoothes recently poured concrete at Beacon Lake Oswego. (Sam Tenney/91Ƶ)
Crews with LaRusso Concrete finish concrete during a deck pour at the Beacon Lake Oswego mixed-use project. (Sam Tenney/91Ƶ)
Crews with LaRusso Concrete finish concrete during a deck pour at the Beacon Lake Oswego mixed-use project. (Sam Tenney/91Ƶ)
Francisco Montez, a laborer with Local 737, guides the hose during a concrete pour at Beacon Lake Oswego. (Sam Tenney/91Ƶ)
Francisco Montez, a laborer with Local 737, guides the hose during a concrete pour at Beacon Lake Oswego. (Sam Tenney/91Ƶ)
Cruz Avalos, a finisher with Local 555 and employee of LaRusso Concrete, checks the depth of the pour. (Sam Tenney/91Ƶ)
Cruz Avalos, a finisher with Local 555 and employee of LaRusso Concrete, checks the depth of the pour. (Sam Tenney/91Ƶ)
Finishers and laborers with LaRusso Concrete and Bremik Construction pour a first-floor slab at Beacon Lake Oswego. (Sam Tenney/91Ƶ)
Finishers and laborers with LaRusso Concrete and Bremik Construction pour a first-floor slab at Beacon Lake Oswego. (Sam Tenney/91Ƶ)
Jason Boyd, a journeyman laborer with Local 737 and employee of Bremik Construction, vibrates freshly placed concrete. (Sam Tenney/91Ƶ)
Jason Boyd, a journeyman laborer with Local 737 and employee of Bremik Construction, vibrates freshly placed concrete. (Sam Tenney/91Ƶ)
LaRusso Concrete employees finish freshly poured concrete. (Sam Tenney/91Ƶ)
LaRusso Concrete employees finish freshly poured concrete. (Sam Tenney/91Ƶ)

0311_beacon_lake_o_12_web

Jason Boyd, left, a laborer with Bremik Construction, vibrates freshly poured material as Tim Mathis, an apprentice finisher with LaRusso Concrete, runs the hose. (Sam Tenney/91Ƶ)
Jason Boyd, left, a laborer with Bremik Construction, vibrates freshly poured material as Tim Mathis, an apprentice finisher with LaRusso Concrete, runs the hose. (Sam Tenney/91Ƶ)
Francisco Montez, a laborer with Local 737, runs the hose. (Sam Tenney/91Ƶ)
Francisco Montez, a laborer with Local 737, runs the hose. (Sam Tenney/91Ƶ)
Cruz Avalos, a finisher with Local 555 and employee of LaRusso Concrete, smoothes newly placed concrete. (Sam Tenney/91Ƶ)
Cruz Avalos, a finisher with Local 555 and employee of LaRusso Concrete, smoothes newly placed concrete. (Sam Tenney/91Ƶ)

0311_beacon_lake_o_16_web

Laborer Jason Boyd uses a backpack vibrator to consolidate concrete. (Sam Tenney/91Ƶ)
Laborer Jason Boyd uses a backpack vibrator to consolidate concrete. (Sam Tenney/91Ƶ)

0311_beacon_lake_o_18_web

The Ironlight events space on the building's top floor will feature about 3,500 square feet of deck space, enough to host large events outdoors when weather permits. (Courtesy of Mackenzie)
The Ironlight events space on the building’s top floor will feature about 3,500 square feet of deck space, enough to host large events outdoors when weather permits. (Courtesy of Mackenzie)

The post Lake Oswego mixed-use building takes shape appeared first on Daily Journal of Commerce.

]]>
Photos: Building an investment in education /news/2018/09/13/photos-building-an-investment-in-education-2/ Thu, 13 Sep 2018 21:17:56 +0000 /?p=179469 Concrete crews last week poured the first set of tilt-up panels for a new elementary school in Gresham.

The post Photos: Building an investment in education appeared first on Daily Journal of Commerce.

]]>
A crew from LaRusso Concrete pours and smooths a new concrete tilt-panel wall for the new North Gresham Elementary School building in Gresham. Part of a $291 million Gresham-Barlow School District bond, the project is being carried out by general contractor Bremik Construction and is expected to be completed in time for the start of the 2019 school year. (Josh Kulla/91Ƶ)
and employees pour a concrete tilt-panel wall for the new building in Gresham. (Josh Kulla/91Ƶ)

The is building two new elementary schools this year with money from a $291 million bond measure approved by district voters in 2016. Ground has been broken on the first facility: North Gresham Elementary School on Southeast 217th Avenue.

This new school, which is being built to replace an existing one, will include: better classroom layouts to improve student flow, improved daylight and HVAC systems, a better learning environment stocked with modern technology, and safety and security upgrades. The latter will provide secured entry to playing fields and the playground, a secured entry vestibule and improved bus parking and parental pick-up areas.

Last week, crews with general contractor Bremik Construction and LaRusso Concrete, subcontracted for the place and finish of concrete, poured the first set of concrete panels for the tilt-up structure. A total of 56 panels will be poured before a lift day scheduled for next month. Construction will continue throughout the current school year and the new facility is expected to open in time for the 2019-20 school year.

In addition to general contractor Bremik Construction, the project team includes BBT Architects and Cornerstone Management, which is performing construction management for the school district.

A crew from LaRusso Concrete pours and smooths concrete tilt-panel walls at the North Gresham Elementary School job site in Gresham. (Josh Kulla/91Ƶ)

A crew from LaRusso Concrete smooths the concrete for a tilt panel wall as part of the North Gresham Elementary School project being carried out by Bremik Construction. (Josh Kulla/91Ƶ)

A crew from LaRusso Concrete builds formwork for a tilt panel wall as part of the North Gresham Elementary School project being carried out by Bremik Construction. (Josh Kulla/91Ƶ)
A Bremik Construction carpenter builds formwork for a tilt panel wall as part of the North Gresham Elementary School project. (Josh Kulla/91Ƶ)

 

Concrete masons from LaRusso Concrete pour and smooth a concrete tilt-panel wall Wednesday morning at North Gresham Elementary School in Gresham as part of a school replacement project being carried out by general contractor Bremik Construction. (Josh Kulla/91Ƶ)

Cement masons from LaRusso Concrete smooth a freshly poured concrete tilt-panel wall earlier this week at the North Gresham Elementary job site, where general contractor Bremik Construction is building a brand new school for the Gresham-Barlow School District. (Josh Kulla/91Ƶ)

A crew of cement masons from LaRusso Concrete pour one of 56 planned concrete tilt-panel walls for the new North Gresham Elementary School building. (Josh Kulla/91Ƶ)

A crew of cement masons from LaRusso Concrete pours a tilt panel wall as part of the North Gresham Elementary School project being carried out by Bremik Construction. (Josh Kulla/91Ƶ)

The new North Gresham Elementary School is being built next to the old school, which will remain operational until the new school is opened in 2019. The old school will then be demolished. (Josh Kulla/91Ƶ)
The new North Gresham Elementary School is being built next to the old campus, which will be demolished after the new school is completed in 2019.

 

A crew from LaRusso Concrete smooths a freshly poured concrete tilt panel wall as part of the North Gresham Elementary School project being carried out by Bremik Construction. (Josh Kulla/91Ƶ)
LaRusso Concrete employees finish a freshly-poured concrete tilt panel wall as part of the North Gresham Elementary School project being carried out by Bremik Construction.

LaRusso Concrete cement masons prepare to pour a concrete tilt-panel wall at the North Gresham Elementary School job site. (Josh Kulla/91Ƶ)

LaRusso Concrete cement masons smooth out one of the 56 concrete tilt-panel walls that will feature in the building of the new North Gresham Elementary School project. (Josh Kulla/91Ƶ)

Cement masons from LaRusso Concrete pour a concrete tilt-panel wall earlier this week at the North Gresham Elementary School job site in Gresham. The new school is part of a $291 million Gresham-Barlow School District capital bond measure approved by voters in 2016. (Josh Kulla/91Ƶ)

A crew from LaRusso Concrete builds formwork for a tilt panel wall as part of the North Gresham Elementary School project being carried out by Bremik Construction. (Josh Kulla/91Ƶ)

The new North Gresham Elementary School will open to students next fall. (Rendering by BBT Architects, via Gresham-Barlow School District)

 

The existing North Gresham Elementary School was built in 1961 and it is showing its age. The current building will be demolished once the new school is completed next summer.

The post Photos: Building an investment in education appeared first on Daily Journal of Commerce.

]]>
Firms ramp up volunteer work to help woman /news/2017/06/09/companies-ramp-up-volunteer-work-to-help-local-woman/ Fri, 09 Jun 2017 22:19:44 +0000 /?p=164563 “Oh, look how lovely this is!” Nancy Ross said, as she ventured outside for the first time in months. The Lents resident has been wheelchair-bound at home since February, making […]

The post Firms ramp up volunteer work to help woman appeared first on Daily Journal of Commerce.

]]>
Nancy Ross admires a newly-poured sidewalk after coming outside of her Southeast Portland home for the first time since February. Accessibility improvements made to Ross' home were installed last week by a team of volunteers working in conjunction with REACH's Community Builders Program, which focuses on providing free home repairs for senior or disabled homeowners living on a low-income.
Nancy Ross admires a newly-poured sidewalk after coming outside of her Southeast home for the first time since February. Accessibility improvements made to Ross’ home were installed last week by a team of volunteers working in conjunction with REACH’s Community Builders Program, which focuses on providing free home repairs for senior or disabled homeowners living on a low-income.

“Oh, look how lovely this is!” Nancy Ross said, as she ventured outside for the first time in months.

The Lents resident has been wheelchair-bound at home since February, making it impossible for her to traverse the steps outside her front and back doors. A newly-installed ramp and sidewalk built last week as part of REACH‘s Community Builders Program have enabled Ross to leave the house, allowing her to age in place in her home of more than 20 years.

Several local building industry firms donated time and materials to the project. led the improvement effort, donating the labor of a team of carpenters and laborers over the course of the week. contributed material for the build, donated material and the services of a cement mason, and provided labor.

The accessibility upgrades to Ross’ home were made as part of national NeighborWorks Week, which aims to engage volunteers, businesses and neighbors in community improvement projects. A lack of money to make accessibility upgrades can lead to residents leaving their homes, and REACH is working to help low-income households in the Lents neighborhood retain their homes.

Eddie Scott, a Bremik Construction employee and second-term apprentice carpenter with Local 1503, builds formwork for the concrete sidewalk.
Eddie Scott, a Bremik Construction employee and second-term apprentice carpenter with Local 1503, builds formwork for the concrete sidewalk.
Jon Peters, a general foreman with Bremik Construction and carpenter with Local 1503, clears dirt in preparation for installing formwork.
Jon Peters, a general foreman with Bremik Construction and carpenter with Local 1503, clears dirt in preparation for installing formwork.
Mark Smidt, left, a laborer with Local 737, and fellow Bremik Construction employee Axel Bledsoe, a carpenter with Local 1503, fill one of approximately 120 wheelbarrow loads of concrete.
Mark Smidt, left, a laborer with Local 737, and fellow Bremik Construction employee Axel Bledsoe, a carpenter with Local 1503, fill one of approximately 120 wheelbarrow loads of concrete.
Dennis Brown, a cement mason with Local 555 and employee of LaRusso Concrete, finishes a sidewalk leading from the backyard to the driveway. Brown was the sole mason on the pour, which took ten cubic yards of concrete.
Dennis Brown, a cement mason with Local 555 and employee of LaRusso Concrete, finishes a sidewalk leading from the backyard to the driveway. Brown was the sole mason on the pour, which took ten cubic yards of concrete.
Eddie Scott, left, Jon Peters run concrete up a driveway while pouring a sidewalk.
Eddie Scott, left, Jon Peters run concrete up a driveway while pouring a sidewalk.

 

 

The post Firms ramp up volunteer work to help woman appeared first on Daily Journal of Commerce.

]]>