Open Concept Architecture – Daily Journal of Commerce /news/tag/open-concept-architecture/ Building and Construction News in Portland, Oregon and the Pacific Northwest Fri, 27 Dec 2024 14:33:49 +0000 en-US hourly 1 https://wordpress.org/?v=6.6.6 /files/2023/08/favicon.webp Open Concept Architecture – Daily Journal of Commerce /news/tag/open-concept-architecture/ 32 32 Building Blocks: The Spot /news/2024/12/27/building-blocks-the-spot/ Fri, 27 Dec 2024 14:33:11 +0000 /?p=504039 The Spot opened in November as a new community hub in downtown Madras.

The post Building Blocks: The Spot appeared first on Daily Journal of Commerce.

]]>

Project: The Spot

Location: 225 S. Fifth St., Madras

Size: 3,150 square feet

Start date: March 2024

Completion date: November 2024 (event center will be complete at a later date)

Cost: Not disclosed

Owner/developer: Andre Jackson

General Contractor: O’Brien & Company

Architect:

Engineers: ,

Project Description: The Spot opened in November as a new community hub in downtown Madras. It features a taphouse with a second-story balcony area, three food carts, outdoor heated seating with fire pots and an adjacent event center.

The building and site amenities are designed for seamless indoor/outdoor activities and year-round enjoyment regardless of weather conditions. Warm wood and clean modern details create a space for people to interact while enjoying food, drinks, music and other entertainment activities.

The John Brown Event Center, named after the first African-American to move to and homestead in Central and Eastern Oregon, is a tented area being raised alongside the taphouse. Entertainment bookings are now under way.

The city of Madras and the Madras Redevelopment Commission played a key role in bringing the project to life. Since 2022, MRC has provided $60,000 in grant funding and $450,000 in loan funding to help transform the site, formerly the location of the Wild Bleu, according to the MRC website.

The post Building Blocks: The Spot appeared first on Daily Journal of Commerce.

]]>
Preparing to offer a different kind of services /news/2021/04/15/preparing-offer-different-kind-services/ Fri, 16 Apr 2021 01:09:19 +0000 /?p=256363 A 112-year-old church is gaining a new life as the flagship brewhouse of a business set to open in Northeast Portland.

The post Preparing to offer a different kind of services appeared first on Daily Journal of Commerce.

]]>
Construction workers replace shingles on a former church that is being renovated to hold Steeplejack Brewing Company operations in Northeast Portland. (Alex Jensen/91Ƶ)

An unusual adaptive reuse project is under way in Northeast Portland: a 112-year-old former church is being transformed into a brewery.

Steeplejack Brewing Co. owners Brody Day and Dustin Harder had sought to start a brewery since college. Instead of taking the “easy route” of opening in a warehouse, Day said he sought space that could signify community. The former church at 2400 N.E. Broadway was a natural choice, he added.

The duo enlisted and to help turn their business dreams into reality. But renovating a building erected in 1909 (then-President William Howard Taft placed the building’s cornerstone during a visit to Portland, according to a snippet on the Steeplejack Brewing website) to be able to accommodate industrial equipment and modern-day mechanical systems has come with challenges.

“Every element was ever so slightly out of compliance,” architect Rebecca Morello said.

From the outset, Day and Harder were committed to salvaging as much of the building as possible. Other than a few patches of dry rot on the roof and water leaks from some cracked ceiling beams, the structure wasn’t in terrible condition. Any salvageable wood is being reused as tables for the brewery.

“Time-consuming and lots of work, but we wanted a flagship building to stand apart and be a part of the community,” Day said.

The brewery’s design mainly focuses on revealing the building’s abundant character. For example, the curved, wooden trusses that warp across the ceiling continually draw visitors’ eyes. Also, light pours in through a large stained glass window.

At the front of the space will be a tank farm sunken about four feet below the main floor with a white oak bar above. There, people will be able to watch brewing operations and even interact with staffers. Directly opposite the tank farm, in the back, will be the main, horseshoe-shaped bar with stools alongside. Stretched out in the middle will be long community tables.

All of those elements will form the heart of the taproom, Morello said.

Along the main room’s outskirts will be smaller rooms, each with unique character and ambience. One room will be a private dining area with a long table and a refurbished fireplace. Another will be a television room, and another will have leather sofas and chairs along with a refurbished fireplace.

In addition to being able to view brewing operations at the front, patrons will be able to see mash being made in the mill room via floor-to-ceiling windows on the side of the main room.

“We wanted to create an atmosphere of curiosity and discovery,” Morello said.

Day convinced stained glass artist David Schlicker, who created the large replacement window after the original was destroyed in a fire in the 1980s, to come out of retirement and make smaller, square stained glass panels for the rest of the main room’s windows.

“It’s a little bit overwhelming in how this is all going to come together in the end,” Morello said.

Swinerton was hired late last summer to execute this complicated project. Construction began in February and is slated to finish in mid-summer. Along the way, Day said, workers have discovered lots of little surprises.

“Construction practices back then to now is vastly different,” Swinerton superintendent Ben Hoover said. “They didn’t have structural concrete footing, so the building is just sitting on the dirt.”

Another surprise was that the sewage line was connected to the brick building next door lower downstream. The whole system had to be dug up and built anew.

Also, a chimney in the basement was found constructed horizontally underground so that smoke was released off the side. Crews had to remove the chimney, Hoover said.

All cracked ceiling beams are being replaced. The new ones weigh roughly 12,000 pounds each, so a number of people are teaming up to lift and install them.

Initially, the basement bathrooms were thought to be OK. However, the installation of completely new plumbing and electrical systems meant the bathrooms had to be gutted.

“Not easy transforming a church into a brewery,” Day said.

0416_steeplejack_brewing_02_web
A tank farm, at left, will sit on a sunken concrete pad within the renovated space. (Alex Jensen/91Ƶ)
0416_steeplejack_brewing_03_web
New lighting and electrical wiring are being added to the ceiling in the building’s main room. (Alex Jensen/91Ƶ)
0416_steeplejack_brewing_04_web
Williamsen & Bleid painter Marty Danieu scrapes old paint off of the former church’s exterior. (Alex Jensen/91Ƶ)
0416_steeplejack_brewing_05_web
Swinerton’s Jesse Wright replaces old shingles that had dry rot. (Alex Jensen/91Ƶ)
0416_steeplejack_brewing_08_web
The main room will hold community tables made out of salvaged wood from the building, a raised bar bench with a mirror wall, a private dining room with a sliding door, and a white oak bar wrapping around a sunken tank farm. (Open Concept Architecture)
0416_steeplejack_brewing_06_web
A horseshoe-shaped bar will be in the back of the main room, with smaller sitting rooms nearby. (Open Concept Architecture)
0416_steeplejack_brewing_07_web
A private dining room will have a refurbished fireplace. (Open Concept Architecture)
0416_steeplejack_brewing_09_web
One side room will have leather furniture. (Open Concept Architecture)
0416_steeplejack_brewing_10_web
Another side room will have a Venetian plaster refurbished fireplace. (Open Concept Architecture)

The post Preparing to offer a different kind of services appeared first on Daily Journal of Commerce.

]]>