Oregon Conservation Center – Daily Journal of Commerce /news/tag/oregon-conservation-center/ Building and Construction News in Portland, Oregon and the Pacific Northwest Wed, 06 Nov 2019 17:38:21 +0000 en-US hourly 1 https://wordpress.org/?v=6.6.6 /files/2023/08/favicon.webp Oregon Conservation Center – Daily Journal of Commerce /news/tag/oregon-conservation-center/ 32 32 Oregon Conservation Center project completed /news/2019/06/28/oregon-conservation-center-project-completed/ Fri, 28 Jun 2019 20:23:49 +0000 /?p=190793 A recently completed renovation and expansion of The Nature Conservancy’s Oregon headquarters in Southeast Portland features material sourced from conservation areas.

The post Oregon Conservation Center project completed appeared first on Daily Journal of Commerce.

]]>
The Nature Conservancy's remodeled and expanded headquarters building, called the Oregon Conservation Center, was recently completed in Southeast Portland. (Jeremy Bittermann)
‘s remodeled and expanded headquarters building, called the , was recently completed in Southeast Portland. (Jeremy Bittermann)

When it came to reimagining and expanding The Nature Conservancy‘s Oregon headquarters in Southeast Portland, it was important for the project to reflect the environmental organization’s values.

So a pavilion expansion was built with Northern California cross-laminated timber and glulam beams certified by the Forest Stewardship Council and manufactured by of Riddle.

Juniper wood cladding and cedar decks came from conservation areas. “We worked closely with the folks that were harvesting it,” said Thomas Robinson, ‘s founding principal.

The Nature Conservancy considered ground-up construction before opting to expand the existing three-story, 12,462-square-foot building with a 2,000-square-foot pavilion. The original building at 821 S.E. 14th Ave. was constructed in 1979.

“At a really basic level, one of the most sustainable things you can do is re-use something,” Robinson said.

Now called the Oregon Conservation Center, the project was recently completed. The project team expects the building will achieve a LEED gold rating from the U.S. Green Building Council.

The pavilion will provide space for board meetings, as well as conferences and events with allied organizations.

“They’re looking to solve major, long-term issues that impact Oregon, and this space is designed around allowing those types of conversations to happen,” Robinson said.

A second-floor terrace provides visual connection to the Buckman neighborhood. A rooftop photovoltaic system was installed, which will supply about a quarter of the building’s energy needs.

was the development manager, and served as general contractor. The project team also included  Consulting Engineers,, and  Landscape Architecture.

The post Oregon Conservation Center project completed appeared first on Daily Journal of Commerce.

]]>
A bit more space and a lot more efficiency /news/2018/12/06/bit-space-lot-efficiency/ Thu, 06 Dec 2018 21:58:57 +0000 /?p=183019 A project to renovate and add to a Southeast Portland office building is under way to suit The Nature Conservancy in Oregon.

The post A bit more space and a lot more efficiency appeared first on Daily Journal of Commerce.

]]>
A renovation of The Nature Conservancy in Oregon's Southeast Portland office building will include a 2,000-square-foot pavilion featuring cross-laminated timber. (Courtesy of LEVER Architecture)
A renovation of in Oregon’s Southeast Portland office building will include a 2,000-square-foot pavilion featuring cross-laminated timber. (Courtesy of )

The Nature Conservancy in Oregon could have redeveloped its office property in Portland’s Buckman neighborhood. Going that route likely would have yielded a five-story, 75,000-square-foot office building. Or the conservation nonprofit could have sold the valuable real estate and moved elsewhere.

Instead, the organization opted to gut its existing 1970s office building and let developer and LEVER Architecture reimagine the space. The result is a thoroughgoing reinvention of the existing three-story, 12,462-square-foot building, and the addition of a single-story, 2,000-square-foot pavilion featuring cross-laminated timber.

is constructing the expansion and renovation at 821 S.E. 14th Ave. The building will be known as the .

“The building had become very outdated, and it was highly inefficient,” said Jim Desmond, state director of The Nature Conservancy in Oregon. “It was a 15,000-square-foot building that had five HVAC systems. We weren’t really walking our talk there.”

When Tom Cody, managing partner at Project^, first evaluated the property, he quickly came to the conclusion that it would not be a teardown.

“At first glance you wouldn’t think it had any merit … but it had some integrity,” he said. “It was a very simple timber-frame building that we saw a future for.”

Cody recommended The Nature Conservancy sell 10,000 square feet of the lot to finance the project rather than build a five-story project to the property lines.

“The most sustainable thing you can do is to reuse what you have versus demolish it,” Cody said.

Reusing the existing building also will maintain its scale with the surrounding neighborhood, Desmond said.

“We’re the last building before it becomes entirely residential,” he said. “I was uncomfortable saddling a neighborhood that’s been good to us with a 75,000-square-foot building.

The project team is targeting a LEED gold rating from the U.S. Green Building Council. The existing building will gain a rain-screen facade made from weathering steel and larger windows with high-performance glazing. The pavilion will be topped by a rooftop deck planted with native flora.

The project is using regionally harvested Oregon juniper and cedar along with locally sourced boulders and river rock, and weathering steel manufactured locally. Some of the timber comes from land managed by The Nature Conservancy. The mass timber was certified for sustainability by the Forest Stewardship Council. Also, a new rooftop photovoltaic system will provide 25 percent of the building’s energy needs.

In addition to housing The Nature Conservancy, the Oregon Conservation Center will serve as an event space, conference center and venue for partner organizations. The space is designed to be flexibly used for board meetings or reconfigured into theater-style seating for events.

A cross-laminated timber panel is installed on The Nature Conservancy in Oregon's Southeast Portland office building. (Courtesy of LEVER Architecture)
A cross-laminated timber panel is installed on The Nature Conservancy in Oregon’s Southeast Portland office building. (Courtesy of LEVER Architecture)

“Nobody’s doing anything alone anymore, and we wanted a space that was conducive to that,” Desmond said.

The project team had no hesitation in using from in Riddle, Desmond said. The southern Oregon manufacturer was linked to CLT panels that delaminated in March at Oregon State University‘s Peavy Hall project.

The team is confident the OSU incident was caused by a one-time error with a particular run of the material, Desmond said.

“I didn’t want to have this milled in British Columbia,” he said.

CLT uses about 60 percent less carbon than concrete and steel construction, Desmond said. The frame has already been constructed.

“It’s in now, and it’s just fantastic,” he said. “It really looks great. It functions great.”

Besides the Oregon Conservation Center, projects including Block 76 West at the Burnside bridgehead, District Office and the Flatiron building are all using CLT materials from D.R. Johnson.

The Oregon Conservation Center project team also includes Consulting Engineers, , and Landscape Architecture.

Construction is on track to finish around Feb. 1, Desmond said. The Nature Conservancy expects to spend several weeks getting systems up and running. For now, the nonprofit organization is using a temporary office at 1634 S.W. Alder St. The conservation group will move back in April, Desmond said.

The post A bit more space and a lot more efficiency appeared first on Daily Journal of Commerce.

]]>