patient care – Daily Journal of Commerce /news/tag/patient-care/ Building and Construction News in Portland, Oregon and the Pacific Northwest Mon, 30 Jun 2025 15:38:05 +0000 en-US hourly 1 https://wordpress.org/?v=6.6.6 /files/2023/08/favicon.webp patient care – Daily Journal of Commerce /news/tag/patient-care/ 32 32 Legacy Silverton Emergency Department /news/2025/06/30/legacy-silverton-emergency-department-expansion/ Mon, 30 Jun 2025 15:38:05 +0000 /?p=510454 Legacy Silverton Medical Center completes phase one of its expansion, unveiling a larger ER, new lobby, helicopter pad, and enhanced patient services.

The post Legacy Silverton Emergency Department appeared first on Daily Journal of Commerce.

]]>
The 20,000-square-foot addition to the hospital’s southwest corner includes a new entrance with a covered drop-off and pick-up area. Photos courtesy of

Project name: Legacy Silverton

Location: Silverton

Completion: March 2024

Size: 21,000 square feet

Owner: System

Architect: Clark/Kjos Architects

Interior Designer: Bainbridge

Engineers: KPFF, PCS Structural Solutions, PAE

General Contractor: Andersen Construction

Submitting Company: Andersen Construction

Subcontractors: Bell Hardware, Cash’s Drapery, Dallas Glass, DeaMor Associates, Empire Painting, Flynn, Green Mountain Excavation, McKinstry, Northside Electric, Paulson’s Flooring, Rexius, Salem Wood, Southland, SteelFab, WPI

has completed the first phase of a major expansion project, fulfilling promises made when Legacy Health and Silverton Hospital joined forces in 2016.

The 20,000-square-foot addition to the hospital’s southwest corner includes a new entrance with a covered drop-off and pick-up area, expanded lobby and a modernized emergency department that increases capacity from 12 to 20 patient rooms.

The emergency department now features larger treatment bays and specialized rooms for trauma patients, cardiac care and women’s services. A new helicopter landing pad across the street enables faster transfers of critically ill patients to Portland facilities like Legacy Emanuel Medical Center and Randall Children’s Hospital.

Other improvements include a redesigned coffee shop, gift shop and volunteer greeter station in the lobby. The Family Birth Center received a new waiting room, and an All Faiths Chapel offers space for reflection and prayer. The project was made possible, in part, due to support from corporate and individual donors and the Silverton Health Foundation Board.

Andersen Construction led the project, which was completed in three phases to minimize disruption. Phase 1 involved site prep and demolition, and building a new parking lot so the existing lot could be used for construction staging. The new lot included the permanent . Phase 2 involved building the 20,000-square-foot addition. Phase 3 involved connecting the addition and making upgrades to the existing building.

The project employed innovative techniques including Pro-Press water pipe fittings instead of traditional copper soldering, enhancing safety by eliminating fire hazards. Building Information Modeling coordination optimized the integration of mechanical, electrical and plumbing systems.

What sets this expansion apart is the hospital’s independent board structure, separate from Legacy Health, ensuring local voices remained central in decision-making.

The expansion has increased patient capacity by 10-15 percent, improving while creating jobs and economic growth. Project leaders prioritized hiring , including Northside Electric, Dallas Glass and Bob Fencing.

As always, safety was a top priority on the site. Life safety consultants were used to engineer temporary partitions so that proper building separation could be maintained during construction of the new addition. The consultant verified that life safety was appropriate to keep construction noise, dust and hazards separate from the active side of the hospital. This required properly rated temporary walls and proper exiting to meet fire regulations.

The post Legacy Silverton Emergency Department appeared first on Daily Journal of Commerce.

]]>
Andersen Construction wins Clackamas hospital job /news/2025/05/21/andersen-kaiser-sunnyside-hospital-tower/ Wed, 21 May 2025 16:37:20 +0000 /?p=508790 Andersen Construction has won the contract to build a new hospital tower at Kaiser Permanente’s Sunnyside Medical Center in Clackamas.

The post Andersen Construction wins Clackamas hospital job appeared first on Daily Journal of Commerce.

]]>

At a glance
  • Seven-story, 615,000-square-foot tower to begin construction in 2026.
  • Over 600 local tradespeople expected during peak construction.
  • New tower to feature all-private rooms and expanded ER services.

has won the contract to build a new at ‘s in Clackamas.

Construction of the seven-story, 615,000-square-foot facility will begin in early 2026. Site clearance is expected to begin late this year.

“During peak construction, more than 600 local tradespeople will be working on the project,” Kaiser Permanente spokeswoman Debbie Karman said in an email. “We prioritize partnering with local companies whenever possible, and are proud that the general contractor for our hospital tower project is a local company founded here in Portland.”

The tower is expected to open in 2029. Once the new tower is open, the existing tower will be replaced with parking, walkways and outdoor spaces, according to Kaiser Permanente.

Details of the contract were not available. Andersen referred questions to Kaiser Permanente.

The medical group announced the expansion in late March. The new tower will have all private patient rooms, in-room telemedicine capabilities and greater emergency room capacity.

The post Andersen Construction wins Clackamas hospital job appeared first on Daily Journal of Commerce.

]]>