Kaiser Group – Daily Journal of Commerce /news/tag/kaiser-group/ Building and Construction News in Portland, Oregon and the Pacific Northwest Tue, 15 Sep 2020 22:36:25 +0000 en-US hourly 1 https://wordpress.org/?v=6.6.6 /files/2023/08/favicon.webp Kaiser Group – Daily Journal of Commerce /news/tag/kaiser-group/ 32 32 And now for something quite a bit different /news/2020/09/08/now-something-quite-bit-different/ Tue, 08 Sep 2020 22:41:07 +0000 /?p=249554 Kaiser Group and Path Architecture have created new senior housing to serve the middle of the market in North Portland.

The post And now for something quite a bit different appeared first on Daily Journal of Commerce.

]]>
0909_the_canyons_update_01_web
Ben Kaiser pauses along a corridor that provides access to some of the 70 apartments in . Units are staggered so that doors do not face each other. (Chuck Slothower/91Ƶ)

For Ben Kaiser’s latest project in North Portland, the developer and architect drew upon influences as far away as Japan and as close to home as family.

The Canyons will open later this month at 3450 N. Williams Ave., near the intersection with Northeast Fremont Street. The 70-unit apartment building is intended to serve seniors seeking independent living units with convenient services.

Behind the six-story, 65-foot-tall building is a long, low-slung retail structure that creates an alleyway with the taller residential building. Kaiser expects a sushi restaurant, hair salon and salt retailer to open there after completion.

The project was designed before the COVID-19 pandemic began, but landed on a series of fortuitous choices with the help of partner Emily Dawson. For example, each unit has its own heating and cooling system, and does not share air with other spaces. Also, the corridors are open to outdoor air, and units are staggered in a sawtooth pattern so doors do not face each other.

“We weren’t planning on COVID, but we’re very happy with the outcome,” Kaiser said during a recent tour of the property. “It’ll be a post-COVID environment that’s safe.”

The property will also have 24-hour concierge and occasional visits from Metro West Ambulance medics for residents who want blood pressure checks or other minor medical screenings.

In a brief video on The Canyons website, Kaiser talks about the past search for ideal housing for his aging father. That influenced development of the building.

“The products here in the United States need a lot of work,” Kaiser said. “It’s either super expensive or practically uninhabitable. We’re trying to find the middle ground.”

The units do not have bathtubs, but do have unique features such as countertops that can be raised and lowered.

also has cross-laminated timber – a material heralded by and . The Canyons shares a parcel with the team’s , which opened in 2018 and remains, for now, the tallest building in the United States. For The Canyons, the team brought on R&H , a local firm that had not previously built a CLT structure.

The innovative method of joining the CLT drew some initial skepticism from inspectors, said Iain Macdonald, executive director of the – a collaborative effort of Oregon State University, the University of Oregon and industry partners based in Corvallis. The CLT panels are connected to each other instead of to a beam or a wall.

“We did actually some testing for them because the building code guys had never seen CLT connected in that way before,” Macdonald said.

CLT panels were loaded up with concrete barriers to test the material’s hardiness. The wood panels passed with ease, Macdonald said.

“We used every piece of concrete we had in the lab,” he said. “It was a really pretty dramatic illustration of the strength of it.”

CLT for The Canyons came from , a major manufacturer based in British Columbia.

Portland has been a leading U.S. market for CLT, with Kaiser among its earliest adopters. Developers and architects who have used CLT praise its warm aesthetics, lower carbon footprint compared to concrete, ability to meet fire and seismic codes, and connection to rural Oregon’s timber economy.

0909_the_canyons_update_02_web
The Canyons was designed before the COVID-19 pandemic took hold, but will be “safe” in such an environment, developer and architect Ben Kaiser says. (Chuck Slothower/91Ƶ)

The Canyons is on track to hit its $36 million budget, Kaiser said. The project team was forced to pause twice during the pandemic because of COVID-19 cases, he noted.

As a development proposition, The Canyons – a rental product aimed at the middle of the market – complements Carbon 12, which has for-sale luxury condos. The retail buildings create a narrow alleyway with both The Canyons and Carbon 12, something Kaiser said was inspired by Japan’s dense, lively alleyways.

“Our hope is people fill in all through here,” he said.

Hoosiers, a Japanese company, is a partner in the project.

The building has substantial bike parking, but approximately 30 parking spaces are tucked underneath. Seniors still want motor vehicle parking, Kaiser said.

“It’s still definitely a market that requires parking citywide,” he said.

Interest from potential commercial tenants has picked up as Oregon gets a better grasp on the coronavirus pandemic, Kaiser said.

“We’re all learning how to live with this problem, and business is slowly coming out of its shell,” he said.

Any new development in the Eliot neighborhood – historically one of Portland’s Black community centers – brings uncomfortable questions of gentrification and displacement. Kaiser has been having those conversations with residents and business owners for many years. Some still don’t like him or his developments, he admitted, but it’s a conversation he knows is necessary.

“Our country is going through a long-overdue awakening to the injustices of Black families in this country,” he said. “The diversity of this quadrant is what I love the most.”

Kaiser first purchased the property and began developing ideas for it before the Great Recession. The economic collapse halted those plans. The recovery led to Carbon 12. The property was vacant at the time of purchase.

“We haven’t displaced anything,” he said. “We haven’t torn down homes; we haven’t torn down businesses. That’s not to say Williams (Avenue)-Vancouver (Avenue) doesn’t have a horrible history of gentrification.”

Kaiser said he supports debt forgiveness for Black Americans.

“What our country needs now more than ever is open discourse to alleviate this massive disparity,” he said.

Kaiser Group is not done with the area, either. The developer owns an adjacent parcel east of The Canyons. The property is approximately 6,000 square feet and zoned for residential use.

The post And now for something quite a bit different appeared first on Daily Journal of Commerce.

]]>
Under wraps: inside The Canyons /news/2020/01/30/wraps-inside-canyons/ Thu, 30 Jan 2020 23:23:43 +0000 /?p=199356 Cross-laminated timber is continuing to gain popularity in Portland, and one of the most visible hot spots is the intersection of North Williams Avenue and Fremont Street.

The post Under wraps: inside The Canyons appeared first on Daily Journal of Commerce.

]]>
is currently wrapped in plastic weather barrier as dry-in work continues underneath. (Josh Kulla/91Ƶ)

Cross-laminated timber is continuing to gain popularity in Portland, and one of the most visible hot spots is the intersection of North Williams Avenue and Fremont Street.

There, the eight-story was completed in 2017. A stone’s throw away, the five-story Radiator building was finished in 2014. Now, work is under way on The Canyons – a six-story mixed-use building – next to Carbon 12. All three mass-timber projects were developed by and designed by Path Architecture.

For The Canyons, R&H is serving as the general contractor.

“Everybody’s excited about this project and what we’re doing,” Senior Project Manager Adam Petersen said.

Crews broke ground on The Canyons in February 2019 and expect to finish sometime this summer. The 65-foot-tall, 110,000-square-foot building will hold 70 residential units. Crafted with seniors in mind, the building will offer physically accessible amenities and light-filled apartments with open floor plans. As a bonus, a resident paramedic will be available 24 hours a day.

At present, teams of craft workers representing a host of trades are spread out across the site. All of them are working underneath a temporary weather barrier covering the entire building. The structure was topped out several months ago, when the final 5-ply and 7-ply panels were flown in for installation.

“Right now the roof is going on as weather allows, the weather barrier is being applied and the first windows are on site and are starting to be installed,” Petersen said. “MEP teams are also roughing in units as fast as we can go, and we are a couple of weeks away from starting (insulation and drywall installation).”

The top four stories of The Canyons building use cross-laminated timber panels, including the skybridge that provides access to units on each floor. (Josh Kulla/91Ƶ)
The top four stories of The Canyons will feature cross-laminated timber panels. (Josh Kulla/91Ƶ)

As senior project manager, Petersen fields many of the inquiries about the use of CLT for The Canyons. The project will be featured at the 2020 International Conference in Portland in March.

“People are excited about it and we get asked about it, it seems like on every project,” Petersen said. “Everyone wants to know: ‘Is my project a good candidate for CLT?’ It can be tough trying to tell people that while it is a solution, and in some cases it is the best solution, it may not be the best solution for every project. It’s about trying to figure out the appropriate times and places to use it.”

For The Canyons, crews are building two post-tensioned concrete decks and four stories of stick-framed walls. But instead of common Trus Joist I Joists (TJIs) fabricated by Weyerhaeuser, the team is using CLT panels for floors and ceilings. Much of the wood and many of the mechanical systems are being left exposed.

“This is sort of a hybrid that not a lot of people have thought of,” Petersen said. “With steel and concrete buildings, everybody’s done it. But with CLT buildings, people are still being really creative about ‘Can we do it this way?’ and ‘What ways can we use to support this really great assembly?’”

The evolution of CLT in the building industry is ongoing, and the many variables involved are still being examined by project teams.

“You have to look at the whole development cost, I think,” Petersen said. “Breaking down materials, TJIs are less expensive than CLT. But when you start to factor in the (drywall) ceilings and some of the other things you’re putting in, the equation changes.”

Acoustics continue to be an issue, especially in multifamily projects, he added. The harder surface requires thicker acoustic matting and gypsum concrete assemblies, increasing the cost slightly.

“The science of it isn’t impossible to figure out,” he said. “Depending on the layout and configuration, it’s maybe cost neutral. Maybe it’s a value saver, but maybe it makes sense to do it in some other way.”

Then project teams must consider the fact that the few manufacturers of CLT panels all make products of different sizes. Clearly, there are still kinks to work out.

“It’s not simple,” Petersen said.

A variety of cross-laminated timber panels ranging from 5 to 7-ply was used in The Canyons. (Josh Kulla/91Ƶ)
Cross-laminated timber panels ranging from 5-ply to 7-ply are being used in The Canyons. (Josh Kulla/91Ƶ)
Journeyman plumber Mike Bright of Tapani Plumbing connects water lines for a clothes washer. (Josh Kulla/91Ƶ)
Journeyman plumber Mike Bright of Tapani Plumbing connects water lines for a washing machine. (Josh Kulla/91Ƶ)
Timberland Inc. carpenters adjust the final placement of an interior wall. (Josh Kulla/91Ƶ)
Timberland Inc. carpenters adjust the final placement of an interior wall. (Josh Kulla/91Ƶ)
Exposed cross-laminated timber panels will be found throughout the top four floors of The Canyons. (Josh Kulla/91Ƶ)
Cross-laminated timber panels will be exposed throughout the top four floors of The Canyons. (Josh Kulla/91Ƶ)
Andres Serrano, an installer with Primo Construction, checks the level on a window he and his crew are placing on the sixth floor. (Josh Kulla/91Ƶ)
Andres Serrano, an installer with Primo Construction, checks the placement of a window on the sixth floor. (Josh Kulla/91Ƶ)
Apprentice electrician Chase Mumm of Prairie Electric strings wire in an apartment unit. (Josh Kulla/91Ƶ)
Apprentice electrician Chase Mumm of Prairie Electric strings wire in an apartment unit. (Josh Kulla/91Ƶ)
Journeyman ironworker Adam Garcia of Timberland Inc. uses a magnetic drilling machine to bore a slot in a steel column that will help support the elevator shaft. (Josh Kulla/91Ƶ)
Journeyman ironworker Adam Garcia of Timberland Inc. uses a magnetic drilling machine to bore a slot in a steel column that will help support the elevator shaft. (Josh Kulla/91Ƶ)
Carpenters with MJS Contracting out of Battle Ground frame a soffit that will provide weather protection for ground floor commercial space. (Josh Kulla/91Ƶ)
Carpenters with MJS Contracting of Battle Ground, Washington, frame a soffit that will provide weather protection for ground-floor commercial space. (Josh Kulla/91Ƶ)
Apprentice sprinkler fitter Ryan Harbert, a member of Local 669 and an employee of Blackstone Fire Protection, installs a sprinkler line in an apartment. (Josh Kulla/91Ƶ)
Apprentice sprinkler fitter Ryan Harbert, a member of Local 669 and an employee of Blackstone Fire Protection, installs a sprinkler line in an apartment. (Josh Kulla/91Ƶ)
Valentin Garcia (front) and Chris Bobee, both journeyman carpenters with MJS Contracting, frame a storefront soffit. (Josh Kulla/91Ƶ)
Valentin Garcia, front, and Chris Bobee, both journeyman carpenters with MJS Contracting, frame a storefront soffit. (Josh Kulla/91Ƶ)
Apprentice electrician Chase Mumm of Prairie Electric strings wire across an apartment unit. (Josh Kulla/91Ƶ)
Apprentice electrician Chase Mumm of Prairie Electric strings wire across an apartment unit. (Josh Kulla/91Ƶ)
Journeyman carpenter Chris Bobee of MJS Contracting frames a storefront soffit on the ground floor. (Josh Kulla/91Ƶ)
Journeyman carpenter Chris Bobee of MJS Contracting frames a storefront soffit on the ground floor. (Josh Kulla/91Ƶ)
Smoke vent skylights on the top level of the building provide cover, daylighting and safety for residents. (Josh Kulla/91Ƶ)
Smoke vent skylights on the top level of the building will provide cover, daylighting and safety for residents. (Josh Kulla/91Ƶ)
Apprentice plumber Chris Whitworth of Tapani Plumbing installs water lines for a series of clothes washers. (Josh Kulla/91Ƶ)
Apprentice plumber Chris Whitworth of Tapani Plumbing installs water lines for a series of washing machines. (Josh Kulla/91Ƶ)
(From left) Otoniel Alvarado, Andres Serrano and Adrien Aravala, all installers with Primo Construction, install a sixth-floor window in an apartment unit. (Josh Kulla/91Ƶ)
Primo Construction workers, from left, Otoniel Alvarado, Andres Serrano and Adrien Aravala install a window in an apartment unit on the sixth floor. (Josh Kulla/91Ƶ)

The post Under wraps: inside The Canyons appeared first on Daily Journal of Commerce.

]]>
Builders digging into The Canyons /news/2019/05/21/builders-digging-canyons/ Tue, 21 May 2019 21:57:37 +0000 /?p=189118 Construction is under way in North Portland on another mixed-use project featuring cross-laminated timber.

The post Builders digging into The Canyons appeared first on Daily Journal of Commerce.

]]>
This view from the neighboring Carbon 12 building shows the below-grade work being done on The Canyons project site next door. (Josh Kulla/91Ƶ)
This view from the neighboring building shows the below-grade work being done on project site next door. (Josh Kulla/91Ƶ)

Next to Carbon 12, an eight-story mass-timber mixed-use building in North Portland, the and are sticking with wood.

The Canyons, at the corner of North Williams Avenue and Ivy Street, will also feature cross-laminated timber (). It will be six stories and offer market-rate apartments as well as substantial commercial space. But The Canyons won’t be a carbon copy.

“It’s a different type of structure,” said project architect Emily Dawson of PATH Architecture. “This is much more like a conventional multifamily project where we don’t have a post-and-beam structure like a lot of the CLT projects going on right now.”

R&H is the general contractor for The Canyons. Crews broke ground in February on what will eventually be a 65-foot-tall building with 70 residential units. In total, there will be 110,000 square feet of floor space. It is designed for seniors, but there won’t be an age restriction. The team sought to offer physically accessible accommodations within a vibrant urban environment. Light-filled apartments will have open floor plans and modern designs. Plus, a resident paramedic will be available 24 hours a day, seven days a week.

Then there’s the unique open-air Alleywalk marketplace that will feature two separate buildings with several small businesses. These micro-retail spaces will range from 250 to 420 square feet.

Also, officials are working to establish partnerships with Legacy Health, and others to help residents save on dining and health care costs.

The project is designed in part around the concept of intergenerational living. To that end, the team hopes to attract a Montessori school or a similar tenant.

On the design and engineering front, Dawson noted, there have been plenty of lessons learned from PATH Architecture’s experience with Carbon 12 to apply to The Canyons. While both buildings use CLT floor panels (fabricated by British Columbia-based ), there are more differences than similarities between them. Carbon 12, for instance, features a structural steel core, while The Canyons is being built more or less as a conventional building with a post-tensioned concrete podium.

Jesse Hooper, an apprentice carpenter with Local 1503 and an employee of Marion Construction, drives a wedge into place as he works to remove blockouts on a building core wall at The Canyons in North Portland. (Josh Kulla/91Ƶ)
Jesse Holper, an apprentice carpenter with Local 1503 and an employee of Marion Construction, drives a wedge into place as he works to remove blockouts on a building core wall at The Canyons in North Portland. (Josh Kulla/91Ƶ)

One unique use of CLT panels in The Canyons will be in an interior atrium structure that links all five stories of apartments through the building’s open-air center. Zigzagging walkways on each floor will bounce from entryway to entryway along the length of the building. Those CLT walkways will be supported by other panels, but at skewed angles to form a never-before-seen load-bearing structure.

To obtain a final building permit, Dawson and her team had the walkway design tested by the at Oregon State University.

“Because they sit along each corridor wall, but sit at this kind of skewed angle, it creates what is called torsional shear through the panel,” Dawson said. “It’s shear moving through the panel in a way that we don’t have tested values that we can pull from charts.”

Under guidelines in Chapter 17 of the state building code, an exact copy of the atrium design was fabricated and sent to the Tallwood Design Institute lab for load-bearing tests. The results showed the design could bear at least three times its intended structural load – the lab ran out of weight to add after roughly 60,000 pounds.

“Our panels recovered to the level at which it passed the two-times test,” Dawson said. “Even when we took it to three times, we actually tried to break the panel but we couldn’t get it to failure.”

Coleman Barth, a journeyman carpenter with Local 1503 and an employee of Marion Construction, takes measurements with a 360 degree prism tool. (Josh Kulla/91Ƶ)
Coleman Barth, a journeyman carpenter with Local 1503 and an employee of Marion Construction, takes measurements with a 360 degree prism tool. (Josh Kulla/91Ƶ)

Crews from R2M2 Rebar & Stressing and Marion Construction are working below grade to construct the building’s underground parking structure, foundation and core.

“We are pouring structural concrete in the basement right now,” said Adam Peterson, senior project manager for . “Work on most of our foundations are complete. We are working on columns and walls, and right now we’re trending a little bit ahead of schedule. We will be in structural concrete through summer and starting wood framing in September and then the CLT will go up quite quickly.”

Cross-laminated timber offers multiple benefits, Dawson said.

“The first thing was the schedule advantages and ease of construction and lack of complications,” she said. “The second is the look; people just really love being in those spaces. It looks really beautiful and it feels so good to have that exposed wood. So, we see that as a differentiator on the market, and as a building owner it was really important to us.”

Completion is scheduled for fall 2020.

Ironworkers with R2M2 Rebar & Stressing lay rebar inside the form for a foundation footing at The Canyons project site. (Josh Kulla/91Ƶ)
Ironworkers with R2M2 Rebar & Stressing lay rebar inside the form for a foundation footing at The Canyons project site. (Josh Kulla/91Ƶ)
Ray Mendez, a journeyman ironworker with Local 29 and an employee of R2M2 Rebar and Stressing, wires rebar for a below-grade section of a building core. (Josh Kulla/91Ƶ)
Ray Mendez, a journeyman ironworker with Local 29 and an employee of R2M2 Rebar and Stressing, wires rebar for a below-grade section of a building core. (Josh Kulla/91Ƶ)
Carpenters with Marion Construction help lower a steel wall form into place for the building core. (Josh Kulla/91Ƶ)
Carpenters with Marion Construction help lower a steel wall form into place for the building core. (Josh Kulla/91Ƶ)
Ironworkers with Local 29 and R2M2 Rebar and Stressing install rebar on a building core. (Josh Kulla/91Ƶ)
Ironworkers with Local 29 and R2M2 Rebar and Stressing install rebar on a building core. (Josh Kulla/91Ƶ)
Journeyman carpenter Mike Keeney, a member of Seattle-based Local 30 and an employee of Marion Construction, constructs wall blockouts. (Josh Kulla/91Ƶ)
Journeyman carpenter Mike Keeney, a member of Seattle-based Local 30 and an employee of Marion Construction, constructs wall blockouts. (Josh Kulla/91Ƶ)
The Canyons is under construction on a parcel adjacent to the Carbon 12 building, also designed by Path Architecture and constructed using cross-laminated timber. (Josh Kulla/91Ƶ)
The Canyons is under construction on a parcel adjacent to the Carbon 12 building, also designed by Path Architecture and constructed using cross-laminated timber. (Josh Kulla/91Ƶ)
Crews from R2M2 Rebar and Marion Construction work on the sub-grade parking level at The Canyons. (Josh Kulla/91Ƶ)
Crews from R2M2 Rebar and Marion Construction work on the sub-grade parking level at The Canyons. (Josh Kulla/91Ƶ)
Jesse Hooper, an apprentice carpenter with Local 1503 and an employee of Marion Construction, works to remove blockouts on a building core wall. (Josh Kulla/91Ƶ)
Jesse Holper, an apprentice carpenter with Local 1503 and an employee of Marion Construction, works to remove blockouts on a building core wall. (Josh Kulla/91Ƶ)
Carpenters with Marion Construction watch as a steel wall form is lifted out of a building core . (Josh Kulla/91Ƶ)
Carpenters with Marion Construction watch as a steel wall form is lifted out of a building core . (Josh Kulla/91Ƶ)
Coleman Barth, a journeyman carpenter with Local 1503 and an employee of Marion Construction, takes measurements with a 360-degree prism tool to ensure that structural columns are perfectly centered on their footings. (Josh Kulla/91Ƶ)
Coleman Barth, a journeyman carpenter with Local 1503 and an employee of Marion Construction, takes measurements with a 360-degree prism tool to ensure that structural columns are perfectly centered on their footings. (Josh Kulla/91Ƶ)
The Canyons will be a five-over-one mixed-use building, with the top five floors being constructed with cross-laminated timber floor and ceiling panels. (Josh Kulla/91Ƶ)
The Canyons will be a five-over-one mixed-use building, with the top five floors being constructed with cross-laminated timber floor and ceiling panels. (Josh Kulla/91Ƶ)
Journeyman carpenter and foreman Shane Ridings, a member of Local 271 of Eugene and an employee of Marion Construction, removes a door blockout from a building core wall. (Josh Kulla/91Ƶ)
Journeyman carpenter and foreman Shane Ridings, a member of Local 271 of Eugene and an employee of Marion Construction, removes a door blockout from a building core wall. (Josh Kulla/91Ƶ)
Journeyman ironworker Brock Lisack, a member of Local 29 and an employee of R2M2 Rebar and Stressing, cuts sections of rebar. (Josh Kulla/91Ƶ)
Journeyman ironworker Brock Lisack, a member of Local 29 and an employee of R2M2 Rebar and Stressing, cuts sections of rebar. (Josh Kulla/91Ƶ)
Crews from R2M2 Rebar and Marion Construction work on the sub-grade parking level at The Canyons. (Josh Kulla/91Ƶ)
Crews from R2M2 Rebar and Marion Construction work on the sub-grade parking level at The Canyons. (Josh Kulla/91Ƶ)
(Josh Kulla/91Ƶ)
(Josh Kulla/91Ƶ)

The post Builders digging into The Canyons appeared first on Daily Journal of Commerce.

]]>
On the Boards: The Canyons /news/2018/01/02/on-the-boards-the-canyons/ Wed, 03 Jan 2018 00:06:34 +0000 /?p=171001 PATH Architecture is expanding its use of cross-laminated timber to include a new senior living center in North Portland.

The post On the Boards: The Canyons appeared first on Daily Journal of Commerce.

]]>
The Canyons will offer residential units for seniors looking for independent living near amenities including groceries and transportation. (Courtesy of PATH Architecture)
will offer residential units for seniors looking for independent living near amenities including groceries and transportation. (Courtesy of )

PATH Architecture is expanding its use of cross-laminated timber to include a new senior living center at3450 N. Williams Ave. When completed in 2019, The Canyons will be a 110,000-square-foot mixed-use structure next to developer’s ‘s .

“We have been working in mass-timber products for five years and we have learned a hell of a lot,” saidBen Kaiser,owner of PATH Architecture and Kaiser Group. “We keep moving the needle. We are pretty comfortable with and how it works.”

One of the big advantages of using CLT in a senior living structure is that the panels help moderate moisture in the air.

In wintertime, the panels release moisture, which helps relieve dry air conditions that can hamper elderly residents’ breathing. Then in summertime, the panels absorb moisture.

The panels will include sensors able to detect exactly how much moisture they are absorbing or releasing.

“Studies have shown it’s a healthier environment,” Kaiser said. “The sensors will have a 13-year battery life. So for 13 years, we can read the moisture levels in the panels on an iPad. We will be able to see if there is a leak. That is fantastic to have in any building.”

The decision to use CLT as the primary material is one of the primary reasons for the $21 million price tag. Nevertheless, Kaiser sought to use an environmentally sustainable product.

“For me, at this point in my career, it’s about reversing the carbon footprint of construction,” he said. “I think the objective is to think beyond the immediate costs.”

Project developers have also added 10 units from the original plan formed two years ago.

“It has evolved,” saidJennifer Dillan, a spokeswoman with Kaiser Group. “One thing this project does is build on a series of unique partnerships.”

Those partnerships include one with . Residents at The Canyons will be able to order from the market ready-made meals that can be delivered.A top goal of the project is to allow seniors to stay as independent as possible for as long as possible.

“This is not assisted-living level of care,” Kaiser said. “We designed an alley on the back of The Canyons. The elder folks will be able to go to an active retail corridor.”

This is Kaiser’s first foray into senior living structures. As such, he brought in Hoosiers Corporation as a partner. The Tokyo-based company has built numerous elder living structures in Japan. In return for sharing its expertise building elder housing, Hoosiers Corp. is getting firsthand experience using CLT, which is becoming more popular in Asia.

“They want to know about CLT and we want to learn about elder housing,” Kaiser said. “It’s a good match.”

The Canyons’ residential units will have a mid-price point, Kaiser said. A driving force in the effort to ensure costs wouldn’t be too high was the experiences he had with his own father.

“My siblings and I toured places,” Kaiser said. “The options for people who are not wealthy were not very good. They were all extremely expensive or so bad we would never put our parent there. We are trying to find a middle ground. We want to build something that is affordable but still a good place to live.”

has been chosen as the general contractor. Ground is expected to be broken in September and a grand opening is scheduled for December 2019.

On the Boards is a 91Ƶ feature offering a look at the projects in Oregon being tackled by local architecture firms. To have your firm’s projects considered, contact 91Ƶ architecture and engineering reporter Kent Hohlfeld at 503-802-7224 or khohlfeld@djcOregon.com.

The post On the Boards: The Canyons appeared first on Daily Journal of Commerce.

]]>
Wood: the sky’s the limit /news/2017/03/08/wood-the-skys-the-limit/ Wed, 08 Mar 2017 19:05:30 +0000 /?p=161554 Cross-laminated timber projects are reaching new heights in Portland.

The post Wood: the sky’s the limit appeared first on Daily Journal of Commerce.

]]>
The Carbon12 mixed-use condominium project in North Portland, at 95 feet in height, is now now the tallest engineered timber structure in the United States. (Sam Tenney/91Ƶ)
The mixed-use condominium project in North Portland, at 95 feet in height, is now now the tallest engineered timber structure in the United States. (Sam Tenney/91Ƶ)

“You’re standing on the tallest wood building in the United States,” said Ben Kaiser on top of his Carbon12 at North Williams Avenue and Northeast Fremont Street.

For the moment, he’s right. It’s also the first residential use of timber framing at its height in the U.S.

At 95 feet and eight stories, Carbon12 is a shade taller than architect ; the Minneapolis structure held the distinction for only a few months.

T3 and Carbon12 both employ in their structural systems – T3 with nail- and glue-laminated timber and Carbon12 with a hybrid of cross-laminated timber () and a steel core. Both were asked to compete in the USDA’s , though neither won. A different Portland wood skyscraper, the tower, ended up splitting the $3 million prize with a now-scrapped New York City project.

The design competition, backed by the Obama administration, evidently helped invigorate the race to erect so-called wood skyscrapers in the U.S., a contest Portland is well-positioned to dominate.

Building codes in the U.S. for more than a century have discouraged use of wood framing in structures taller than five stories because of life safety concerns. CLT, however, especially in concert with other forms of mass timber, have the potential to change this. They’ve already been in use elsewhere – notably Europe and Canada – since the 1990s.

PATH forward

Kaiser, head of development firm and design-build firm , to many people represents the human face of gentrification in rapidly changing Northeast Portland. Heavy on sustainable features, PATH projects are described as the epitome of green building methods, sleek design and low environmental impact.

Kaiser wants Carbon12 to be a continuation – visually and thematically – of his mixed-use office project kitty-corner across the street. (The other half of the Carbon12 lot is planned to contain a 65-unit aging-in-place concept called .)

The CLT panels were delivered to the site in 22 flatbed trucks with brackets and other attachments already installed, meaning the panels only had to be fitted into place with the tower crane. The crane itself was only on-site for two and a half months.

Carbon12 will have two units per floor. Recesses in the east and west sides of the building will have ivy running up them, as high as it will grow. Kaiser, a registered architect, was inspired by the concept of a “nurse log” – a fallen tree that then nurtures other life.

“Once a tree falls, it’s only lived about half its life,” he said. “It gives those nutrients to the next generations. It’s a fantastic way to think about architecture, especially at this moment with the advent of CLT.”

Though the building flaunts its wood, it actually employs all of the big three building materials. Steel is used in the core and braces that connect floor plates to the vertical columns. And concrete is used on the basement, ground floor and garage. (The automated garage represents another first for the U.S. The German-designed underground system will deliver drivers their vehicles without them ever needing to venture below-ground.)

Kaiser Group, Inc.’s Carbon12 project is one of several Portland-area projects in various stages of development to use cross-laminated timber as a structural element. (Sam Tenney/91Ƶ)
Kaiser Group, Inc.’s Carbon12 project is one of several Portland-area projects in various stages of development to use cross-laminated timber as a structural element. (Sam Tenney/91Ƶ)

Kaiser said it’s wrong to think of building materials in competitive terms, as some unions and industry groups have done.

“I really think everyone should just relax and let the products perform where they perform best,” he said. “There’s plenty of market for everybody, and I think that we all need to work together to make each other better, rather than trying to out-prove one another,” he said.

Kaiser received an undisclosed amount from the Softwood Lumber Board to help test aspects of his project. He said he and his firm will only build with mass timber from now on. He thinks one day the skyline of Portland will be dominated by wood.

“This is our way forward, and we’ll keep applying what we’ve learned,” he said.

Knocks on wood

The Framework team plans to celebrate the award of building permits from the state and the city later this month. But it has already notched many milestones. The project has won design review approval, and concept testingfire, acoustic, seismic – has been carried out at laboratories around the country.

The team now is looking ahead to a 14-month schedule, starting in late summer.

“The piece we’re looking at now is the financing,” said Anyeley Hallova, a principal with . “It’s a complex project of affordable housing in it, market-rate office. It will take a little while now to put that all together.”

But Framework’s East Coast counterpart hasn’t had the same good fortune.

The ownership group split several months ago when it became clear the New York Fire Department remains reluctant to adopt mass-timber performance, according to sources close to the project. And the New York Building Department is still following the 2012 International Building Code, not the 2015 one, which is said to be more favorable to CLT.

“They’ve been reluctant to engage with developers who are willing to do performance-based approval,” said Jeff Spiritos, principal of Spiritos Properties. He said his business has moved on to working on other timber-based projects in cities more inclined to support them.

The Northeast is historically fire-conservative. It’s also the cradle of the U.S. steel industry, which, along with concrete, masonry and union concerns are hitting back against CLT proponents angling for market share. The National Ready Mixed Concrete Association last year started the “Build with Strength” public relations campaign to promote steel and concrete and warn against wider use of mass timber products.

One recent email blast about a failed attempt to allow some wood-framing in Florida school construction was headed, “Florida Building Commission Stands Strong for Students.”

Ethan Martin is an engineer serving as technical director of WoodWorks, a campaign of the Wood Products Council to promote mass-timber products. He said the steel and concrete industries lobbied in the 1950s and 1960s to get those products more widely used.

“At this point, they literally have 100-percent market share of anything over five stories. So even if there are only 10 buildings a year built using CLT, that’s going to cut into their market share,” Martin said.

Andrew Waugh, a prominent British CLT proponent, estimates that in Europe, where CLT has been in use since the 1990s, the product represents about 0.5 percent of building materials used in buildings taller than five stories.

Getting the code changed to allow CLT is important, but Greg Kingsley, head of KL&A Structural Engineers and Builders in Denver says that more critical to CLT’s success right now are the local building officials.

Portland officials have made allowances for the use of alternative materials in high-rises. KL&A’s Platte 15 CLT concept was originally planned to be 15 stories, but Kingsley said it was bumped down to five to satisfy the Denver Building Department, which wasn’t willing to make an exception.

“Maybe in the Pacific Northwest, the forest industry is closer to your hearts; in Denver – maybe not so much,” he said. “Look, don’t blame the building officials. They’re just doing their job. They’re waiting for the proof … You should be proud your local building officials in Portland are innovative enough to want to be on the bleeding edge of this.”

CLT isn’t cheap, but can be made due to the speed of construction. Developer Farid Bolouri is hoping to achieve feasibility this way in St. Johns, where residents often are hostile toward intrusive developments. Alan Jones is designing a dense four-story apartment building on a small, centrally located lot. Cutting down on construction impacts is key to project success, Jones said.

“I’ve been watching (Carbon12) go up. I said, I think we can go faster,” he said.

The post Wood: the sky’s the limit appeared first on Daily Journal of Commerce.

]]>
Revisions requested to two Portland projects /news/2015/05/10/revisions-requested-to-two-portland-projects/ Sun, 10 May 2015 19:53:03 +0000 /?p=134755 The architects of the Modera Belmont and Hampton Inn & Suites Pearl projects will be to some extent going back to the drawing board following critiques from the Portland Design Commission.

The post Revisions requested to two Portland projects appeared first on Daily Journal of Commerce.

]]>
\local.serapdx.comlibraryProjectsArchitecture1402034C-Desi
Portland-based is designing ‘s mixed-use development in Southeast Portland. (Courtesy of SERA Architects)

The architects of two planned Portland developments will be to some extent going back to the drawing board following critiques from the .

Design commissioners on Thursday requested revisions to plans for the Modera Belmont, a mixed-use development that would replace the Oregon Ballet Theatre building in Southeast Portland. They also expressed reservations with a proposal to build a Hampton Inn & Suites in the Pearl District and sought more information on how the development would impact neighboring condominiums.

Teams representing both projects sought the commission’s design review approval on Thursday, but commissioners instead asked the architects and developers to return for at least one more hearing with revised designs.

A design team from Portland-based SERA Architects presented plans for the Modera Belmont, developed by Mill Creek Residential Trust. The proposed six-story, 230,000-square-foot building, at 818 S.E. Sixth Ave., would include 204 residential units above ground-floor commercial space and a basement garage with 105 parking spots. The U-shaped structure would frame a ground-floor courtyard with stormwater planters.

Based on commission feedback offered during a design advice request hearing in February, the SERA project team significantly modified the plans, SERA principal Kurt Schultz told commissioners on Thursday. Among the commissioners’ suggestions the design team took to heart were reducing the number of materials used on the facade, he said. The revised design features a simplified, mostly brick façade that’s punched out at various intervals to reveal white metal panels.

“Our idea was to create an asymmetrical brick enclosure,” Schultz said. “We really do appreciate the advice from the design advice request. We think having a more contemporary brick expression fits the Central Eastside.”

Despite changes to the design, commissioners said it wasn’t quite approvable and lamented that the project team didn’t act on more of their feedback. During the design advice request, commissioners suggested widening the courtyard, but on Thursday several said they felt as proposed it was still too narrow with the stormwater planters dominating much of the space.

Commissioner Jeff Simpson said façade would have a cleaner look if the design stuck with just brick and glass and eliminated the metal panels. It would also be more in line with the brick buildings the design team showed the commission they were inspired by, he said.

“I think what’s elegant about those images that show your precedence is they’re all brick and glass,” Simpson said. “There’s no metal to steal the show.”

Another commission concern with the proposed design was the planned live-work units on the ground-floor facing Southeast Belmont Street. Commission Vice Chairman Ben Kaiser pointed out that at the urging of the design commission the Portland City Council is considering a moratorium on ground-floor residential units.

“I’m a proponent of having the whole ground floor (be) retail,” he said. “I think you could make this a really successful ground floor commercial level … We’re having a hard time finding a successful ground floor residential (level).”

Given how the area surrounding the project site is evolving, Commissioner Guenevere Millius agreed that replacing the ground-floor apartments with commercial space would be better.

“I think living on the ground floor on Belmont is a tough proposition,” she said. “These are going to be your least favorite units unless there is a retail component … I know it’s a 40 mile-per-hour neighborhood right now, but it will become more walkable in just a few years.”

The project team scheduled a second design review hearing in front of the commission on June 4.

HAMPTON INN & SUITES PEARL

Commissioners also critiqued on Thursday plans by Madison, Wisconsin-based Raymond Management Co. to build a Hampton Inn & Suites hotel in place of two older warehouse structures in the Pearl District, at 821 N.W. Everett St., 338 N.W. Ninth Ave. and 303 N.W. Park.

The project is being designed by Madison-based Gary Brink & Associates Architects and Portland-based . Plans call for an eight-story, 201,000-square-foot hotel with 243 rooms, 9,000-square-feet of ground floor retail and 104 parking spots on the second and third floors and an eco-roof on the fourth floor.

One of the commission’s biggest concerns was how development would interact with the Park Northwest Condominiums building it would wrap around. Millius pointed out that information was conspicuously absent from the materials the design team provided to the commission.

“I feel like that’s what’s missing from your packet … a better sense of the conversation between your building and theirs,” she said.

Park Northwest residents and other neighbors who testified at the hearing said they had a series of concerns with proposed development, including noise from the hotel’s rooftop mechanical equipment right outside their windows. They urged the developer to enhance the proposed eco-roof to make up for their lost views.

Millius said it fell on the design commission to push the hotel developer and architects to address these concerns.

“Our job is to try and mitigate that disaster,” she told the project team. “The most contextual building you have around is (Park Northwest) … I want to see some of those things you’re going to do to help.”

Commissioners on Thursday also offered feedback on the mixed-use project. The proposed residential development at 12 N.E. Fremont St. would include eight stories of cross-laminated timber() over a concrete basement, according to plans submitted to the city by Portland-based and .

 

 

 

 

 

 

The post Revisions requested to two Portland projects appeared first on Daily Journal of Commerce.

]]>
CLT mixed-use project proposed for Portland /news/2015/05/05/clt-mixed-use-project-proposed-for-portland/ Tue, 05 May 2015 13:29:35 +0000 /?p=134595 A proposed eight-story, mixed-use building in Northeast Portland could be constructed using a wood product that’s suitable for taller structures. Carbon12, a proposed residential development at 12 N.E. Fremont St., […]

The post CLT mixed-use project proposed for Portland appeared first on Daily Journal of Commerce.

]]>
The proposed Carbon12 residential development near the intersection of North Williams Avenue and Fremont Street could include eight stories of cross-laminated timber construction. (Courtesy of PATH Architecture)
The proposed residential development near the intersection of North Williams Avenue and Fremont Street could include eight stories of cross-laminated timber . (Courtesy of )

A proposed eight-story, mixed-use building in Northeast Portland could be constructed using a wood product that’s suitable for taller structures.

Carbon12, a proposed residential development at 12 N.E. Fremont St., would include eight stories of cross-laminated timber () construction over a concrete basement, according to plans submitted to the city by Portland-based and PATH Architecture. The on Thursday is scheduled to offer feedback on the project at a design advice request hearing.

The proposed 85-foot-tall Carbon12 development would be significantly larger than the only CLT project approved in Portland – a small, single-story Oregon Zoo structure, designed by . The roof of the 2,000-square-foot building was constructed using CLT panels, which are manufactured with lumber glued in opposite directions to form a solid slab for walls, floors or ceilings.

Plans for Carbon12 include 2,705-square-feet of retail space on the ground floor, 14 condos on the upper floors and a basement with resident storage spaces and 22 stalls of mechanized parking.

The project’s prominent use of CLT will highlight the product as an environmentally friendly construction method, according to a statement from PATH Architecture in the design advice request filed with the city’s Bureau of Development Services.

“The timber industry is experiencing its own rebirth due to a push for sustainable building and advances in wood product manufacturing,” the statement said. “Carbon12 showcases cross-laminated timber, the new growth of wood construction.”

CLT has gained popularity in Europe and Canada over the past 20 years as a sustainable building material. The product has been touted as a safe alternative to steel and concrete for building high-rise structures out of timber because it is more fire-resistant than traditional wood-frame construction.

But it’s still relatively unused in U.S. despite federal promotion of its benefits and growing interest from the design and construction industries. In Oregon, the product has been endorsed by former governor John Kitzhaber as a means to support the state’s timber industry.

One challenge for Carbon12 to gain city approval is Portland’s building code. The code doesn’t contain language regarding CLT and the project architect and engineer would have to prove it can meet fire safety and seismic requirements.

The 2015 International Building Code will be to recognize CLT, however. This could streamline the acceptance of CLT buildings, according to timber industry groups.

The Carbon12 project could be constructed using CLT produced by a Southern Oregon mill instead of importing the product from Canada or Europe. Last fall, Riddle-based DR Johnson Lumber Co. announced a partnership with Oregon State University researchers to pilot the manufacture of structural-grade CLT. PATH Architecture plans to partner with DR Johnson on the Carbon12 project, according to a statement issued by the firm.

“With Carbon12 as a beacon of wood at the gateway to North Portland, fortified by the timber framed office towers across the street, we will provide energy for wood construction buildings and encourage growth in the industry,” the statement said. “This is will be the epicenter of the wood construction conversation.”

Thursday’s design commission meeting that has Carbon12 on the agenda is scheduled to start at 1:30 p.m. in Room 2500A at 1900 S.W. Fourth Ave.

Commission Co-Chairman Ben Kaiser is the owner and principal of Kaiser Group and PATH Architecture.

The post CLT mixed-use project proposed for Portland appeared first on Daily Journal of Commerce.

]]>
Photos: Work continues on One North’s East Building /news/2015/01/14/photos-work-continues-on-one-norths-east-building/ Wed, 14 Jan 2015 21:47:03 +0000 /?p=129743 A four-story office building in North Portland is under construction.

The post Photos: Work continues on One North’s East Building appeared first on Daily Journal of Commerce.

]]>

A four-story office building in North Portland is one of three in various stages of as part of the development. The East Building totals over 43,000 square feet and will feature three stories of office space over ground-floor retail. is serving as general contractor on the project, which was designed by for developer Karuna Properties II. The project slated for completion this July.

Don Knowles, a carpenter with Fred Shearer & Sons and member of Local 146, installs a steel support for an exterior building aperture on the East Building at the One North development in North Portland.
Don Knowles, a carpenter with Fred Shearer & Sons and member of Local 146, installs a steel support for an exterior building aperture on the East Building at the development in North Portland.
Kevin Muller, a journeyman roofer with Snyder Roofing and member of Local 49, makes marks for cuts on a modified base sheet.
Kevin Muller, a journeyman roofer with Snyder Roofing and member of Local 49, makes marks for cuts on a modified base sheet.
The building features three stories of timber-framed creative office space over a ground-floor concrete retail space. The entire three floors of office space have been leased by digital creative firm Instrument.
The building features three stories of timber-framed creative office space over a ground-floor concrete retail space. The entire three floors of office space have been leased by digital creative firm Instrument.
Chris Koester, a carpenter with Wood Mechanix, installs a wall panel.
Chris Koester, a carpenter with Wood Mechanix, installs a wall panel.
Dennis Woodward, left, watches as fellow Fred Shearer & Sons carpenter Don Knowles trims a piece of steel framing.
Dennis Woodward, left, watches as fellow Fred Shearer & Sons carpenter Don Knowles trims a piece of steel framing.

0115_OneNorth_SA_06_WEB

 

The post Photos: Work continues on One North’s East Building appeared first on Daily Journal of Commerce.

]]>
UPDATED: Building permit issued for One North structure /news/2014/10/27/building-permit-issued-for-one-north-structure/ Mon, 27 Oct 2014 23:44:19 +0000 /?p=126187 The Portland Bureau of Development Services on Friday issued a commercial building permit for the third and final building of the One North development.

The post UPDATED: Building permit issued for One North structure appeared first on Daily Journal of Commerce.

]]>

The on Friday issued a commercial building permit for the third and final building of the development. The $6 million, five-story West Building will have office space and an adjacent, 14,000-square-foot courtyard.

One North is north of Fremont Street between North Williams and Vancouver avenues in the Boise neighborhood. It’s being developed as a collaborative effort by and Karuna Properties II.

Kaiser Group is constructing the Radiator Building, which is nearing completion. The five-story structure has 36,000 square feet.

Karuna Properties broke ground on the East Building in August. When completed, it will have four floors and 43,000 square feet of creative office space. It’s due to gain its roof within three weeks. Tenants will move in during summer 2015.

The West Building, in addition to office space, will offer a community room for use by tenants and neighbors.

The East and West buildings were designed by , and the contractor for the project is R&H .

The property manager, Tim McCarron of Pingree Northwest LLC, said crews next week will break ground on the West Building. McKinstry has been hired to oversee construction of the West Building’s mechanical, electrical, plumbing and fire alarm systems. The engineering firm previously was awarded a contract for similar services for the East Building.

Construction is expected to finish by the fourth quarter of 2015, McCarron said.

The post UPDATED: Building permit issued for One North structure appeared first on Daily Journal of Commerce.

]]>
One North: a collaborative effort /news/2014/08/13/one-north-a-collaborative-effort/ Wed, 13 Aug 2014 20:44:59 +0000 /?p=120653 Three buildings rising in North Portland will share multiple systems and a public courtyard.

The post One North: a collaborative effort appeared first on Daily Journal of Commerce.

]]>
Oswaldo Alvarez, left, and Gustavo Fernandez, both ironworkers with Farwest Steel, install concrete post-tensioning cables on the East building at the One North development in North Portland. (Sam Tenney/91Ƶ)
Oswaldo Alvarez, left, and Gustavo Fernandez, both ironworkers with Farwest Steel, install concrete post-tensioning cables on the East building at the development in North Portland. (Sam Tenney/91Ƶ)

Nels Gabbert and Ben Kaiser knew early on that they wanted to develop a district, and not just a collection of buildings. The partners in Karuna Properties II LLC and Inc., respectively, wanted their separate projects at to connect both to each other and surrounding North Portland neighborhoods.

Their central idea was to search for a way to share resources between three highly energy-efficient structures: Kaiser Group’s Radiator Building, and Karuna Properties’ East and West buildings.

“The challenge had been: How do we think of this as a neighborhood instead of a single building?” Gabbert said. “How can we utilize various assets that don’t usually get utilized?”

The three buildings, rising between North Williams and Vancouver avenues just north of Fremont Street, each will have a mix of office and retail space and be connected by shared electrical, stormwater and telecommunications systems, as well as a shared public courtyard.

For the latter feature, each developer donated land and resources proportionally into a fund and worked with the city to add an existing public alley to the courtyard. The result will be a better flowing, community gathering space linking One North with the Boise neighborhood, said Scott Noble, project manager for the Kaiser Group.

“It’s kind of a showcase that multiple developers can work with the city to create nice spaces,” he said. “Imagine if they were doing everything on their own. It would be more chopped-up common space.”

Meanwhile, the process to install utilities required significant coordination, Noble said.

Kaiser installed the underground electrical conduits and built a transformer that will feed power into all three buildings. R&H , meanwhile, will do the same for the telecommunications networks. Stormwater systems will be shared between the West and Radiator buildings.

“It will take digging up access into the Karuna site so when that’s going on, it restricts how materials are being delivered,” Noble said. “It means excavating and backfilling as quickly as you can.”

Not all district development plans came together as envisioned. Underground pipes linking One North with the nearby were installed while the store was being constructed; however, plans to create a district-wide heat redistribution system were scaled back.

Originally, piped water from refrigeration units at the market would have been used to heat One North buildings. But plans were crafted early in the design phase, before it was known exactly how much waste heat New Seasons would generate and how it would be utilized, said Owen Gabbert, Nels Gabbert’s son and a partner in Karuna Properties. Installation costs were higher than expected and a use could not be determined, he said, in part because the One North buildings were more energy efficient than expected.

“We realized it wasn’t going to work in the way that we thought it was going to work,” he said. “Waste heat only has value if you have a use for it. Otherwise, you’re paying money to move water around.”

Other options are still being explored, such as bringing other buildings into the fold. The system could end up being used as an educational tool for other developers interested in installing a similar system, he said. Regardless, the system is available if energy costs spike later, Owen Gabbert said.

As the project teams continue to build their district, R&H and Kaiser Group – the contractor for the Radiator Building – are encountering logistic challenges.

“We’re scheduling major deliveries with R&H along with the neighbors,” Noble said. “It takes constant communication.”

“It often feels like several projects are going on simultaneously,” R&H superintendent Andy Hernandez said.

Plus, site access is constricted and the three One North buildings have different construction timelines. The Radiator Building is slated to be completed by the end of the year and will need its power sooner than the other two buildings. The East Building will be completed by June 2015, and the West Building‘s completion date is still undetermined.

Work will take place on an expedited schedule because R&H by April 1, 2015 will hand over construction of the East Building for tenant improvements to suit digital creative agency Instrument. It will occupy three floors.

 

East Building at One North
Location: North Portland
Anticipated completion date: June 2015

Owner: Karuna Properties II LLC
Developer: Karuna Properties II LLC, Nels Gabbert, Owen Gabbert

General contractor:
Architect:
Landscape architect: Lango Hansen Landscape Architects
Engineers: KPFF Consulting Engineers (civil), Froelich Engineers (structural), McKinstry (MEP)

 

Radiator Building at One North
Location: North Portland
Owner/developer: Deco Diner LLC
Architect:

General contractor: Kaiser Group Inc.
Landscape architect: Lango Hansen Landscape Architects
Engineers: Munzing Structural Engineering, PAE, KPFF Consulting Engineers

The post One North: a collaborative effort appeared first on Daily Journal of Commerce.

]]>