Q21 – Daily Journal of Commerce /news/tag/q21/ Building and Construction News in Portland, Oregon and the Pacific Northwest Mon, 16 Oct 2017 19:29:43 +0000 en-US hourly 1 https://wordpress.org/?v=6.6.6 /files/2023/08/favicon.webp Q21 – Daily Journal of Commerce /news/tag/q21/ 32 32 Photos: Mixed-use project contributes to grow /news/2016/11/11/photos-mixed-use-project-contributes-to-neighborhood-growth/ Fri, 11 Nov 2016 19:05:15 +0000 /?p=158095 A mixed-use building under construction in the Northwest District will add 162 apartments, ground-floor retail, and office space to the newly-developing area. Andersen Construction is building Q21 on a 1.18-acre […]

The post Photos: Mixed-use project contributes to grow appeared first on Daily Journal of Commerce.

]]>

A mixed-use building under construction in the Northwest District will add 162 apartments, ground-floor retail, and office space to the newly-developing area. is building Q21 on a 1.18-acre site on Northwest 21st Avenue between Quimby and Pettygrove Streets, just outside of the bustling site. is the designer of the project, which consists of three connected buildings. The seven-story eastern portion along Northwest 21st Avenue consists of five floors of steel stud-framed apartments over two floors of post-tensioned concrete. The ground floor will have retail space, and the second floor consists of office space.

The north and south buildings both reach five stories and are consists of three wood-framed floors over two floors of post-tensioned concrete. The south building will contain eight two-story townhomes facing Northwest Pettygrove Street, and the north building has ground-floor retail along Northwest Quimby Street.

The project’s 162 residential units range in size from studios to three-bedrooms, as well as 101 vehicular parking spaces and over 200 bicycle spaces. Work on the project began in the summer of 2015, and is slated for turnover Feb. 1. The project’s owner is Rosan Inc., which is owned in part by members of the Andersen family. Property management and leasing will be handled by the newly-formed Bridge Development and Management, also owned in part by Andersen family members.

Andersen Construction is building the YBA Architects-designed Q21 mixed-use project in Northwest Portland. (Sam Tenney/91ÊÓÆµ)
Andersen Construction is building the YBA Architects-designed mixed-use project in Northwest Portland. (Sam Tenney/91ÊÓÆµ)
Tannon Gallamore, an employee of Cutting Edge Floors, cuts material while installing a floating engineered wood floor in an apartment unit.
Tannon Gallamore, an employee of Cutting Edge Floors, cuts material while installing a floating engineered wood floor in an apartment unit.
Radiant Services NW employee Alex Groner cleans windows and exterior paneling.
Radiant Services NW employee Alex Groner cleans windows and exterior paneling.
Long Painting employees Jermie Ali, foreground, an apprentice with IUPAT Local 10, and Anthony Camerena, a foreman journeyman, paint interior doors.
Long Painting employees Jermie Ali, foreground, an apprentice with IUPAT Local 10, and Anthony Camerena, a foreman journeyman, paint interior doors.
Joe McBean, above, and Josh Sandall, both sheet metal workers with All Metal, install flashing on a ground-floor retail space.
Joe McBean, above, and Josh Sandall, both sheet metal workers with All Metal, install flashing on a ground-floor retail space.
Electrician Joe Wright, an employee of Bergelectric, installs reflectors on a recessed lighting fixture.
Electrician Joe Wright, an employee of Bergelectric, installs reflectors on a recessed lighting fixture.
A portion of the east building cantilevers two stories above ground level.
A portion of the east building cantilevers two stories above ground level.
The residential units feature high-end finishes and industrial-inspired touches including concrete floors and partially exposed M.E.P. systems.
The residential units feature high-end finishes and industrial-inspired touches including concrete floors and partially exposed M.E.P. systems.
Board-formed concrete walls feature prominently in hallways and some residential units.
Board-formed concrete walls feature prominently in hallways and some residential units.
A third-floor courtyard will include private patios.
A third-floor courtyard will include private patios.
Alex Groner, top, and Johnathan Penrod of Radiant Services NW clean windows and metal cladding on the east building.
Alex Groner, top, and Johnathan Penrod of Radiant Services NW clean windows and metal cladding on the east building.

1111_q21_sa_12_web 1111_q21_sa_13_web

The post Photos: Mixed-use project contributes to grow appeared first on Daily Journal of Commerce.

]]>
Photos: Tower crane rises at NW Portland mixed-use project /news/2015/07/24/photos-tower-crane-rises-at-nw-portland-mixed-use-project/ Fri, 24 Jul 2015 23:23:28 +0000 /?p=137408 A tower crane was erected Friday at Q21, a mixed-use project developed by general contractor Andersen Construction in partnership with Guardian Real Estate Services.

The post Photos: Tower crane rises at NW Portland mixed-use project appeared first on Daily Journal of Commerce.

]]>

A tower crane was erected Friday at , a mixed-use project developed by general contractor in partnership with . The seven-story building will contain 163 market-rate apartment units, approximately 16,000 square feet of ground-floor retail and 11,000 square feet of second-floor office space.

The project is being built on the site of a former warehouse at Northwest 21st Avenue and Quimby Streets that Andersen built for itself in 1978. The warehouse has been mostly demolished, while part of the concrete shell has been kept in place to be incorporated into the new building’s design as a nod to its industrial past.

The -designed project is slated for completion in November 2016.

0724_Q21_01_WEB

Crews with Cascade Tower & Rigging assemble a Morrow tower crane Friday. The crane's pick point is 111 feet, with a jib length of 168 feet.
Crews with Cascade Tower & Rigging assemble a Morrow tower crane Friday. The crane’s pick point is 111 feet, with a jib length of 168 feet.
Portions of the shell of the former warehouse building at the site are being reused in the building's designed.
Portions of the shell of the former warehouse building at the site are being reused in the building’s designed.

0724_Q21_04_WEB

The tower crane will be load tested Monday, and is expected to be operational by Tuesday.
The tower crane will be load tested Monday, and is expected to be operational by Tuesday.

0724_Q21_06_WEB

The post Photos: Tower crane rises at NW Portland mixed-use project appeared first on Daily Journal of Commerce.

]]>
Mixed-use morphology /news/2014/02/27/mixed-use-morphology/ Thu, 27 Feb 2014 21:53:22 +0000 /?p=111935 On the edge of the master-planned Con-way property in Northwest Portland, warehouse modernization is in the works.

The post Mixed-use morphology appeared first on Daily Journal of Commerce.

]]>
Q21, a development planned by Guardian Real Estate Services and Andersen Construction, would be created via transformation of an existing 43,000-square-foot warehouse in Northwest Portland. (YBA Architects)
, a development planned by and , would be created via transformation of an existing 43,000-square-foot warehouse in Northwest Portland. ()

No nails have been driven yet at the master-planned site in Northwest Portland, but it’s already casting a luminous glow over the neighborhood. That warmth is reaching the 17-acre property’s southern edge, where a concrete warehouse is about to bloom.

Guardian Real Estate Services and Andersen Construction are working together to convert the 36-year-old structure at 2140 N.W. Quimby St. into a modern mixed-use building. The approximately $32 million development – named Q21 – is expected to infuse 160 market-rate housing units, 15,000 square feet of ground-floor retail space, and 12,000 square feet of office space into a city corner destined for growth.

“Once we started getting into what the was really about, and what their intent was, we saw our building and site as a missing piece,” said Alex Yale, a principal at Portland-based YBA Architects and the lead project designer for Q21. “We understood that our building had a great responsibility and role to play in that transition, and really help the Con-way district be reinforced.”

The Q21 property is between Northwest 21st Avenue and Quimby and Pettygrove streets – a stone’s throw from where a store, a 185-unit apartment building, a public plaza and a streetcar line are in the works. Today, only asphalt surrounds the warehouse.

Andersen Construction built the 43,000-square-foot building for itself in 1978. The goal now is to preserve a piece of its industrial legacy, and expand upon it by adding three sections along the north, south and east elevations. Yale said he was unaware of anything like it in Portland, or even along the West Coast.

The project team recently applied for design advice from the Bureau of Development Services. As planned, the keystone, so to speak, would be a four-story glass and metal facade that cantilevers over the northeast corner of the site, with a roofline seven stories above ground. That’s where the group plans to locate luxury apartments with condo-level finishes.

A similar addition would step down along the northern elevation, as would the size of apartments there. An existing 35-foot setback would be set up like a boardwalk in front of the ground-floor retailers.

On the southern side (Northwest Pettygrove Street) Guardian and Andersen would plop a row of two-story townhomes to try and weave the building into the existing residential fabric. Those units would be the smallest.

“The idea is to be able to diversify your risk,” said Adrian Boly, vice president of acquisitions and development for Guardian. “You’re really renting to multiple ranges of profiles within the project itself.”

All three sections would wrap around the existing concrete warehouse, which would house two stories of garage parking with room for 111 vehicles. That exceeds the city’s minimum requirement, but Yale said that’s because parking is in short supply in the neighborhood.

“Bike parking requirements have increased, which is great, but the reality is people need to park their cars,” he said. “Whether there’s a minimum requirement or not, it’s an important feature, not only for livability but for sustainability and the longevity of our occupants.”

Additionally, a major design element would be punched holes in the warehouse’s concrete facade, and added layers of glass and metal to contribute to the modern aesthetic.

“As you can see from the design renderings, there is a serious attempt not to do the mainstay, or not to do another vanilla project there,” Boly said. “I think there’s an opportunity to add another unique element to the fabric of the neighborhood.”

Obviously, scrapping the warehouse and starting from scratch would be easier, Boly said, but preservation provides benefits in terms of land-use approvals and architecturally interesting design.

Yale noted that the existing roof would provide needed shelter in the winter months – the group hopes to begin construction in October or November.

“It’s very complicated to do what we’re doing,” he said, “… but concrete has a huge carbon footprint, so if you can keep it whenever possible, you’re effectively reducing the carbon footprint of the building.”

The post Mixed-use morphology appeared first on Daily Journal of Commerce.

]]>