Sue Vorenberg//December 30, 2010//

Earthmoving can be unpredictable.
Such is the case with the Oregon Department of Transportation‘s project to replace the Martin Luther King Jr. Boulevard viaduct. Workers trying to drive a concrete support piling into the ground discovered that the site was in some spots underlain with 66 feet of sawdust, said Brad Wurfel, an ODOT spokesman.
“The project was slated to be open in March 2010, but it was delayed by the ‘surprises’ that the contractor found,” Wurfel said. “You never know what you’ll find when you’re moving earth.”
The $71.5 million project to replace the MLK Jr. Boulevard and Grand Avenue viaducts – which are essentially bridges that extend over land instead of water – began in May 2006 and should wrap up this spring, he said.
The viaducts were built near a wetland that was filled in with sawdust, but ODOT didn’t realize until work began that pockets of sawdust existed beneath the areas for new support structures.
The surprise of finding sawdust and other materials beneath the site caused the construction delay because several parts of the project had to be re-engineered by contractor Max J. Kuney Co. of Spokane, Wash., said Mike Mason, ODOT’s community affairs coordinator for the project.
“Finding the sawdust complicated efforts to get pilings into firm earth,” Mason said. “They took core samples around the location, but you can’t know what it’s like under every support pile from those initial surveys.”
The company had to put in anchor rods and do other work to stabilize the terrain so the new viaducts can safely carry traffic loads.
The MLK viaduct, the larger part of the project, brings Oregon Route 99E over the Union Pacific Railroad tracks. It is the longest slab-and-girder-style structure in Oregon, at 1,639 feet.
ODOT decided to replace the structures because they were aging, and spans and columns had visibly settled. The original MLK viaduct was built in 1936 by Hoffman Construction Co. as part of a Works Progress Administration project.
When finished, the new viaducts will include several pedestrian ramp improvements; landscaped bridgeheads, walkways and bikeways; repaved streets; and under-bridge lighting, among other things.