SECOND PLACE RENOVATION $15.1M - $50M
By: Lindsey O'Brien//May 26, 2011//
SECOND PLACE RENOVATION $15.1M - $50M
Lindsey O'Brien//May 26, 2011//
Do no harm to the programs” was the motto picked for a project to a nearly 100-year-old former high school into a state-of-the-art, LEED-platinum performance center and arts classroom building for Portland State University.
Location: Portland, Oregon
Cost: $24.53 million
Start Date: April 2008
Completion Date: October 2010
Owner/Developer:
Portland State University
Architect: Boora Architects
Engineers: Interface
Engineering, KPFF Consulting Engineers, Sparling
General Contractor: Howard S. Wright
Howard S. Wright worked closely with Boora Architects, KPFF Consulting Engineers and PSU to plan a complete renovation and seismic upgrade of Lincoln Hall.
The innovative designs aimed to minimize demolition costs and reduce the building’s carbon footprint while adding functional spaces.
Existing light wells had been abandoned and filled-in during earlier renovations, but PSU wanted to open them back up to bring in natural light. The team removed the in-fills to allow access for brace frame installation. The brace frames were modified and the steel frame relocated, resulting in a cost savings that allowed for the installation of skylights over the old light wells.
“Based on where we started, it was very rewarding to see the progress toward the final project,” said Doug Greenwalt, HSW project manager.