Second Place, Renovation $5.1 million to $15 million
By: Stephanie Basalyga//May 11, 2012//
Second Place, Renovation $5.1 million to $15 million
Stephanie Basalyga//May 11, 2012//
Furman Hall is a survivor.
The Oregon State University building, constructed on the Corvallis campus in 1902, was struck by two fires in the 1930s. Renovation work fixed the damage, but the resulting concrete rebuild was done a way that prevented the interior of the building from being connected to its exterior.
Location: Corvallis
Project cost: $11.9 million
Start date: August 2010
Completion date: December 2011
Owner/Developer: Oregon State University
Architect: Fletcher Farr Ayotte
Landscape architect: Walker Macy
Engineers: Interface Engineering, KPFF Consulting Engineers, Sparling, Tetra Tech
General contractor: Fortis Construction Inc.
Other associates: Systems West» See all the TopProjects 2012 winners
As seismic standards increased over the years, Furman Hall became a seismic nightmare, deemed structurally unsound and separated from the rest of the campus – and the university’s students – by a wrap of fencing.
With an eye toward bringing Furman Hall back to working order, the university pulled together a team to renovate the building.
In order to maintain the historic accuracy of the exterior, the sandstone surface was mapped with lasers. The entire facade was then stripped down to columns, beams and slabs. The project team, led by general contractor Fortis Construction, then rebuilt a limestone exterior that is an exact match to the original stonework.