A Type 2 procedure (adjustment) is pending for 11041 S.E. Bush St. Plans call for conversion of a basement-level storage space into an apartment unit. An adjustment is sought to allow a patio to be used as the unit’s designated outdoor space. Michael Atmadja of West Coast Forensics Engineering & Design is the applicant and Carlo Tamburrino is the project owner.
Early assistance is being sought for a proposal to construct a four-story, 40-unit multifamily building at 134 S.E. 124th Ave. The proposal calls for studio and one-bedroom units. The project would comply with inclusionary housing rules. An existing single-family home on the site would be removed. Plans call for preserving a large Douglas fir in the back yard; all other trees would most likely be removed. Tony Ngo is the project owner. The applicant was not listed.
A pre-application conference is being sought for a proposal at 425 N.W. 23rd Ave. Plans call for construction of a five-story building with ground-floor retail space, basement parking (35 stalls) and approximately 20 condominium or apartment units. Kurt Schultz of SERA Architects is the applicant and Kenneth Davis is the project owner.
A Type 2 procedure (adjustment) is pending for 10200 S.W. Capitol Highway. Plans call for installation of a 46.5-foot-by-13.6-foot shed next to the existing building. The detached structure would have a roof and columns only (no walls). Muhammad Khellah of Islamic School of Portland and Ali Abd of AKL Construction are the applicants, and North American Islamic Trust is the project owner.
Early assistance is pending for 5210 N. Kerby Ave. The proposal calls for modernization of Jefferson High School to accommodate a capacity of 1,700 students. Plans call for additional space to support dance and theater programs as well as community partner programs. The new facility would have approximately 330,000 gross square feet. Becca Cavell of Bora Architecture & Interiors is the applicant and School District No. 1 is the project owner.
Early assistance is pending for a proposal to add 11 townhomes at 2321 S.E. 89th Ave. Elson Nguyen of HM Group is the applicant and Anatoliy Ponomarenko is the project owner.
Early assistance is pending for a proposal to construct a three-story multifamily building along North Interstate Avenue (within the 97217 zip code). The approximately 6,831-square-foot structure would include 12 apartments as well as bike parking and space for trash collection. No on-site parking is proposed. Jim Toporek of Studio 3 Architecture is the applicant and Alpina Properties LLC is the project owner.
Early assistance is pending for 917 S.E. 25th Ave. The proposal calls for a zoning adjustment to the southern half of the property from R2.5 to match the northern half now zoned Cm2. Bob Schatz of Allusa Architecture is the applicant and Connor McWilliams is the project owner.
Early assistance is pending for 7778 S.W. Capitol Highway. The proposal calls for demolition of two existing buildings to allow development of a building with 40-45 affordable housing units. The building would also hold nonprofit offices, community spaces, and space for a day care. Chris Chiacchierini (Neighborhood House) is the applicant, and Neighborhood House is the project owner.