91ÊÓÆµ

Commercial building and facility permits for Oct. 10, 2022

By: Alex Jensen//October 10, 2022//

Commercial building and facility permits for Oct. 10, 2022

Alex Jensen//October 10, 2022//

Listen to this article

BUILDING ISSUED
$921,270
Address: 819 S.W. Oak St.
Applicant: William Davidson of Salas O’Brien in Seattle
Owner: AT&T Communications of the Pacific Northwest
Contractor: Allen Sandven (Roebbelen Contracting of El Dorado Hills, California)

Plans call for installation of telecommunication equipment in the existing first-floor equipment room as well as concrete containment curbs and housekeeping pads.

UNDER INSPECTION

$1,070,030
Address: 1067 N.E. Columbia Blvd.
Applicant: Brian Hoeft of Scott Edwards Architecture
Owner: Oregon Humane Society
Contractor: Lease Crutcher Lewis

Work includes an interior remodel of the two-story building. Plans call for demolition of interior walls and casework, and addition of walls, doors and finishes.

$4,268,978
Address: Portland Art Museum, at 1219 S.W. Park Ave.
Applicant: Not listed.
Owner: Not listed.
Contractor: Nate Gundrum (Mortenson)

Plans call for an addition and renovation for the new Rothko Pavilion between the main museum building and The Mark Building.

BUILDING PERMIT INTAKES

None for any project with a value of $500,000 or greater.

FACILITY PERMITS ISSUED
$1,255,625
Address: Oregon Health & Science University, at 3250 S.W. Sam Jackson Park Road, unit HRC
Contractor: Hoffman Construction

Plans for a tenant improvement on the eighth floor. Work will include demolition of existing walls and construction of new ones to create flexible space between emergency and behavioral health patient areas. Alterations also include ceiling, flooring, finishes, plumbing and electrical.

$750,000
Address: Block 216, at 970 S.W. Washington St.
Contractor: Balfour Beatty Construction

Work includes metal panels for the first and eighth floors as well as metal soffits for the 33rd and 34th floors. Also, two separate new construction permits ($2,500 and $30,000) were issued for installation of metal panel cladding at the building’s west lobby entry and adjustment of the size of seismic anchor rod for compatibility with other elements during installation.

FACILITY PERMIT INTAKES
$826,845
Address: Field Office, at 2035 N.W. Front Ave.
Contractor: Don Snair (D&B Company)

Plans call for a tenant improvement in suite 500 for Propeller, a business management consultant. Work would include minor demolition and construction of new walls to create a lobby area, huddle rooms, offices, phone rooms, conference rooms, a copy room, a storage room, a wellness room, a break room, pantry closets, a vestibule and an open office area. Alterations would also include ceiling, flooring, finishes, plumbing and electrical.

UNDER REVIEW

UNDER REVIEW

$26,075,235
Address: Portland International Airport, at 7000 N.E. Airport Way
Contractor: Hoffman Skanska LLC

Plans call for construction of two curtain walls for the main terminal core project.

Source: Portland Bureau of Development Services. Please note that has changed how it publishes permit information, which includes the applicant and the project owner for commercial building permits – but not facility permits.


News

See All News

Commentary

See All Commentary

COMMUNITY CALENDAR