By: Alex Jensen//July 31, 2023//
Alex Jensen//July 31, 2023//

A weekly list of highlights from commercial land use review activity in Portland by the Bureau of Development Services in the prior week.

Early assistance – pending
Address: 526 S.E. Division Place
Applicants: Kyle Campion of U-Haul Company of Portland and Zulema Longoria of Americo Real Estate Co. of Phoenix, Arizona
°¿·É²Ô±ð°ù:ÌýCR Terminal LLC
The proposal calls for construction of an approximately 24,000-square-foot warehouse on the 0.77-acre property.

Pre-application conference – application
Address: 108 W. Burnside St.
Applicant: Brendan Sanchez of Access Architecture of Vancouver, Washington
Owner: Skidmore Fountain Plaza LLC
The proposal calls for a 30-story, net-zero high-rise with affordable housing units and ground-floor commercial space. Photovoltaics would be integrated in the building’s skin.
Historic resource review (type 3 procedure – pending)
Address: 1715 N.W. Couch St.
Applicant: Michael Roberts of LRS Architects
°¿·É²Ô±ð°ù:ÌýSt. Mary Catholic Cathedral of Immaculate Conception of Portland Oregon
Interior demolition and renovations are proposed for the existing cathedral administration building. Work would involve structural seismic strengthening, installation of new interior elevator systems, construction of a new lobby and stairway, mechanical and electrical and plumbing upgrades, and more.

Design advice Ìý– canceled
Address: 1362 N.W. Naito Parkway
Applicant: Kurt Schultz of SERA Architects
°¿·É²Ô±ð°ù:ÌýPDC dba Prosper Portland
The proposal called for construction of three separate, five-story buildings with a total of 277 apartments over shared underground parking.
Source: Portland Bureau of Development Services
See also:
Ìý