| SUB-BIDS REQUESTED | ||||||
| Oregon Metro Arlene Schnitzer Concert Hall Roof Replacement Arlene Schnitzer Concert Hall Roof Replacement 1037 SW Broadway Ave | Portland, OR 97205 |
||||||
|
Documents Available: March 18th, 2024 @ 10:00am |
||||||
| The roof assemblies at the Arlene Schnitzer Concert Hall have reached the end of their useful lives. The seven different roof areas that need replacement vary in elevation, access, and square footage. Structural roof members like precast concrete panels are showing signs of water infiltration and structural degradation and will need to be repaired or replaced. The existing parapet supports no longer meet current seismic code and will need to be replaced with structural steel. Sheet metal flashings and wall panels need to be replaced along the parapet walls and copings. Rooftop mechanical equipment will be temporarily removed so that new curbs can be built that match the new roofing assembly profiles. Roof drain bodies may need to be replaced or repaired. There is potential for a backup emergency generator, support equipment and switchgear installation as well. Site access and schedule will be constraints on this project. The Arlene Schnitzer Concert Hall is in the heart of the Arts District and requires complex logistics. COBID-certified firms strongly encouraged to participate.
Bid Package: #1 – All Scopes Bid Documents: Bids may be uploaded electronically to BuildingConnected or delivered by email to Mortenson Estimator Christine Klomstad at [email protected] Any Bid received after the specified date and time will not be considered. A non-mandatory pre-bid virtual meeting will be held on Friday March 22nd from 11:00am-12:00pm for the purpose of answering any questions from prospective Bidders. Attendance is strongly encouraged. No other Pre-Bid Conference will be held. To obtain a Teams Meeting link, please contact Mortenson Project Manager Ian Anderson at [email protected] Prevailing wages are a project requirement. Prequalification applications for subcontracts larger than $250,000 and/or purchase agreements over $500,000 must be submitted through TradeTapp within BuildingConnected by 10:00am on April 1st, 2024.
|
||||||
|
||||||
| It is the policy of Mortenson to provide equal employment opportunity to all team members and applicants for employment in accordance with all applicable federal, state, and local equal employment opportunity and affirmative action laws | ||||||
| OR CCB# 46955 |