By: Hilary Dorsey//August 5, 2024//
Hilary Dorsey//August 5, 2024//
A weekly list of highlights from commercial land use review activity in Portland by Permitting & Development in the prior week.
 Early assistance – application  Â
Address: 3131 S.E. 50th Ave.
Applicant: Brannon Lobdell of Brannon Lobdell, Architect
Owner: Albina Head Start
Plans call for renovating a 5,500-square-foot masonry building on a 10,504-square-foot site with a parking lot and a loading/​unloading zone. The work would involve demolishing interior partitions and exterior infill walls at the east elevation. The building would gain a new roof and structural (seismic) upgrades, as required. The proposed change of use would be to day care with three classrooms and support spaces (offices, restrooms, kitchen, break room, interior playground and storage). A storefront/​entry at the classrooms and a recessed main entry are proposed. A single fenestration at the south and east elevation is also proposed. Site work would include a playground, space for trash collection, landscaping and parking modifications. No sprinklers are proposed.
Type 2 procedure (adjustment) – pendingÂ
Address: 9144 S.E. Alder St.
Applicant: Kevin Partain of Urban Visions
Owner: James Kosta
The proposal calls for adjusting the maximum building setback standard for an existing dwelling.
Source: Portland Permitting & DevelopmentÂ
See also: