91ÊÓÆµ

Redmond Library

By: 91ÊÓÆµ Staff//July 2, 2025//

Redmond Library

91ÊÓÆµ Staff//July 2, 2025//

Listen to this article

Aerial front of building: The two-story, 40,000-square-foot structure features photovoltaic solar panels. Photo credit: Fisheye Aerial Media
Project name:

Location: Redmond

Completion: September 2024

Size: 40,000 square feet

Cost: $31.5 million

Owner:

Owner’s Representative: Redpoint Construction Management

Architect: The Partnership, Architects

Interior Designer: The Miller Hull Partnership

Engineers: KPFF, HWA, Interface Engineering

General Contractor: Kirby Nagelhout Construction Co.

Submitting Company: Kirby Nagelhout Construction Co.

Other Associates/Key Consultants: Blanca Lighting Design, Mayer Reed, Morrison Hershfield, Plus and Greater Than, Studio Pacifica, Tenor Engineering Group, Walker Macy

Subcontractors: Advance Cabinet Designs, Advanced Technology Group, Andres Landscape, Apollo Sheet Metal, Beacon Roofing Supply, BrandSafway Services, Building Material Specialties, Ceniga Masonry, Central Oregon Garage Door, Central Oregon Roofing, Deschutes Concrete Construction, Deschutes Painting, Energy Conservation Insulation, Fabulous Floors, Hickman Williams & Associates, Interior Technology, Joni’s Construction Cleaning, Max Manufacturing, Metro Tint, Mike’s Fence Center, Mt. Hood Corps., Northwest Framing Systems, Pacific Decorative Concrete, Phoenix Fire Protection, Rixir Systems, Simple Safety Solutions, Skyline Sheet Metal, SouthTown Glass, StructureCraft Builders, Summers Wood Floor, Sunlight , Terminix, TK Elevator, Tomco Electric, Western Partitions

The new Redmond Library offers residents a state-of-the-art facility that nearly doubles the size of its predecessor while incorporating cutting-edge elements.

The two-story, 40,000-square-foot structure stands on the same site as the original library following approval of a Deschutes Public Library bond measure by county voters. The project is part of a larger initiative to renovate existing libraries and construct two new facilities throughout the county.

Designed through a partnership between Seattle-based The Miller Hull Partnership and local firm Steele Associates Architects, the building features an innovative framework that provides both structural integrity and aesthetic appeal. The use of acoustic dowel-laminated timber sets the project apart. It reduces the need for additional acoustical elements while maintaining the open nature of the spaces.

Brick buildings are a theme throughout the city of Redmond, so the new library is brick-clad but in a darker tone and laid out in a stacked-bond style to set it apart as a modern building.

The library’s distinctive design includes a feature staircase fabricated by Bend’s Max Manufacturing and a large custom sculpture by renowned Pacific Northwest artist John Grade, inspired by Central Oregon sagebrush.

Beyond traditional library services, the facility offers multiple community-focused amenities including multi-purpose spaces, a children’s discovery area, and maker spaces for activities like sewing and 3D printing. Adults and teens can utilize collaborative areas designed for studying and co-working.

For user convenience, the building includes a drive-up window for materials pickup and drop-off during or after library hours.

Sustainability was prioritized throughout construction, with photovoltaic solar panels installed on the roof and over parking areas to help the building achieve net-zero energy consumption. The facility is on track for LEED Gold certification, with Platinum certification possible. Additional eco-friendly features include electric vehicle charging stations, ample natural lighting through skylights and clearstory windows, and the elimination of PVC materials outside of mechanical and electrical systems.

Located adjacent to community parks, schools and residential areas, the library is positioned to become a central hub for Redmond residents.

The construction was completed by Kirby Nagelhout Construction Co. in coordination with Redpoint Construction Management and the architectural firms, with all parties citing the high degree of communication and collaboration as key to the project’s success. There was significant local participation on the project, with 60 percent of trade partners from the area.



News

See All News

Commentary

See All Commentary

COMMUNITY CALENDAR