91ÊÓÆµ

The Springs at The Waterfront

By: 91ÊÓÆµ Staff//July 3, 2025//

The Springs at The Waterfront

91ÊÓÆµ Staff//July 3, 2025//

Listen to this article
The Springs at The Waterfront rises 12 stories along the in Vancouver, Washington. Photo credit: Moris Moreno

Project name: The Springs at The WaterfrontLocation: Vancouver, Washington

Completion: July 2024

Size: 465,000 square feet

Owner/Developer:

Architect: GBD Architects

Interior Designer: GBD Architects

Engineers: KPFF, Ocean Park Mechanical,

General Contractor: Howard S. Wright, a Balfour Beatty company

Submitting Company: Howard S. Wright, a Balfour Beatty company

Other Key Participants: Pacific Medical Buildings (development partner), Harrison Street Real Estate Capital (equity partner), City of Vancouver, Interface Engineering, Lango Hansen

Subcontractors: Alliance Laundry Systems, Anderson Poolworks, Bargreen Ellingson of Oregon, Building Material Specialties, Building Specialties Northwest, Cash’s Drapery, Center Pointe Signs, Chown Portland, Dallas Glass, DeaMor Associates, DE-EL Enterprises, Dero, Don Frank Floors, Eagle Striping Services, ES&A Sign & Awning, F.D. Thomas, Fireside Contracting Services, Floor Solutions, Flynn BEC, Foster Bray, Fought & Co., Conco Concrete, Greenhaven Landscapes, Hospitality Services, Infinity Images, Interior Technology, J&S Masonry, J.S. Perrott & Co., Knife River Corp.-Northwest, Kraft Screens & Window Washington, Lanz Cabinet Shop, Legend Custom Woodworking, Mincey Marble Manufacturing, Ocean Park Mechanical, Otis Elevator, Overhead Door Co. of Portland, Pacific Stair, Performance Contracting, Prairie Electric, Precision Rail of Oregon, Pro-Bel Enterprises, Proclean, Safemark Systems, Schonert & Associates, Sign Wizards, Standard TV & Appliance, Starline Windows USA, Superior Fence, Tapani, Teufel Nursery, Viking Automatic Sprinkler, Washington Commercial Painters, Wessco Equipment, Williamsen & Bleid

The Springs at The Waterfront rises 12 stories along the Columbia River, representing a bold reimagining of in an urban setting.

The 250-residence community seamlessly integrates , and across approximately 465,000 square feet, with two levels of underground parking. The project achieved and 3-star certifications.

The project has attracted the youngest demographic The Springs Living has seen.

The community faced unique challenges during development. Located less than a mile from Pearson Field airport, builders encountered strict FAA height limitations, ultimately setting the building just 6 inches below regulatory restrictions. During excavation, crews uncovered contaminated soils and unexpected buried structures from the site’s industrial past. Workers removed 2,029 tons of concrete foundations, 187 wooden piles and 267 tons of steel. An 1889 brick foundation from the DuBois Brothers Sawmill was cataloged by the State Department of Archaeology before removal.

The building’s innovative design places Memory Care residents on upper floors, providing equitable access to Columbia River views. A dedicated wellness suite on the second floor houses fitness classes, physical therapy services and an elevated pool with distinctive privacy screens that maintain river views while blocking visibility from neighboring buildings.

Departing from traditional senior dining models, The Springs features “Fancho’s Public House,” a bistro-heavy concept creating a casual atmosphere where residents can “come as they are.”

The exterior facade combines masonry, dark bronze, and wood tones in patterns inspired by sunset reflections on the Columbia River. Interior spaces feature subtle whites, grays and beiges complemented by natural Oregon oak and stone textures.

Thoughtfully selected materials like Knotwood, an aluminum cladding system that replicates wood while offering superior durability, allow the building to withstand challenging waterfront conditions.

Residents enjoy a ninth-floor wine bar, outdoor roof deck with garden plots, putting green and dog run. Ground-floor spaces connect to waterfront paths, playgrounds and outdoor dining areas.

Two natural gas-fueled rooftop generators augment emergency power systems, allowing residents to shelter in place during emergencies while maintaining essential services.

While the project did not include specific MWESB participation requirements, Howard S. Wright and the project team remained committed to providing opportunities for diverse firms. Team members participated in various outreach efforts at local tradeshows and association events including PBDG, OAME and MCIP. As a result of these efforts, more than $5.4 million in work was awarded to 18 MWESB subcontractors and vendors.



News

See All News

Commentary

See All Commentary

COMMUNITY CALENDAR