Prairie Electric – Daily Journal of Commerce /news/tag/prairie-electric/ Building and Construction News in Portland, Oregon and the Pacific Northwest Mon, 07 Jul 2025 15:20:38 +0000 en-US hourly 1 https://wordpress.org/?v=6.6.6 /files/2023/08/favicon.webp Prairie Electric – Daily Journal of Commerce /news/tag/prairie-electric/ 32 32 The Springs at The Waterfront /news/2025/07/03/springs-waterfront-senior-living-columbia-river/ Thu, 03 Jul 2025 18:14:15 +0000 /?p=510698 A 12-story LEED Gold senior living community blends luxury and care on the Columbia River, offering modern design, wellness and riverfront views.

The post The Springs at The Waterfront appeared first on Daily Journal of Commerce.

]]>
The Springs at The Waterfront rises 12 stories along the in Vancouver, Washington. Photo credit: Moris Moreno

Project name: The Springs at The WaterfrontLocation: Vancouver, Washington

Completion: July 2024

Size: 465,000 square feet

Owner/Developer:

Architect: GBD Architects

Interior Designer: GBD Architects

Engineers: KPFF, Ocean Park Mechanical,

General Contractor: Howard S. Wright, a Balfour Beatty company

Submitting Company: Howard S. Wright, a Balfour Beatty company

Other Key Participants: Pacific Medical Buildings (development partner), Harrison Street Real Estate Capital (equity partner), City of Vancouver, Interface Engineering, Lango Hansen

Subcontractors: Alliance Laundry Systems, Anderson Poolworks, Bargreen Ellingson of Oregon, Building Material Specialties, Building Specialties Northwest, Cash’s Drapery, Center Pointe Signs, Chown Portland, Dallas Glass, DeaMor Associates, DE-EL Enterprises, Dero, Don Frank Floors, Eagle Striping Services, ES&A Sign & Awning, F.D. Thomas, Fireside Contracting Services, Floor Solutions, Flynn BEC, Foster Bray, Fought & Co., Conco Concrete, Greenhaven Landscapes, Hospitality Services, Infinity Images, Interior Technology, J&S Masonry, J.S. Perrott & Co., Knife River Corp.-Northwest, Kraft Screens & Window Washington, Lanz Cabinet Shop, Legend Custom Woodworking, Mincey Marble Manufacturing, Ocean Park Mechanical, Otis Elevator, Overhead Door Co. of Portland, Pacific Stair, Performance Contracting, Prairie Electric, Precision Rail of Oregon, Pro-Bel Enterprises, Proclean, Safemark Systems, Schonert & Associates, Sign Wizards, Standard TV & Appliance, Starline Windows USA, Superior Fence, Tapani, Teufel Nursery, Viking Automatic Sprinkler, Washington Commercial Painters, Wessco Equipment, Williamsen & Bleid

The Springs at The Waterfront rises 12 stories along the Columbia River, representing a bold reimagining of in an urban setting.

The 250-residence community seamlessly integrates , and across approximately 465,000 square feet, with two levels of underground parking. The project achieved Gold and 3-star certifications.

The project has attracted the youngest demographic The Springs Living has seen.

The community faced unique challenges during development. Located less than a mile from Pearson Field airport, builders encountered strict FAA height limitations, ultimately setting the building just 6 inches below regulatory restrictions. During excavation, crews uncovered contaminated soils and unexpected buried structures from the site’s industrial past. Workers removed 2,029 tons of concrete foundations, 187 wooden piles and 267 tons of steel. An 1889 brick foundation from the DuBois Brothers Sawmill was cataloged by the State Department of Archaeology before removal.

The building’s innovative design places Memory Care residents on upper floors, providing equitable access to Columbia River views. A dedicated wellness suite on the second floor houses fitness classes, physical therapy services and an elevated pool with distinctive privacy screens that maintain river views while blocking visibility from neighboring buildings.

Departing from traditional senior dining models, The Springs features “Fancho’s Public House,” a bistro-heavy concept creating a casual atmosphere where residents can “come as they are.”

The exterior facade combines masonry, dark bronze, and wood tones in patterns inspired by sunset reflections on the Columbia River. Interior spaces feature subtle whites, grays and beiges complemented by natural Oregon oak and stone textures.

Thoughtfully selected materials like Knotwood, an aluminum cladding system that replicates wood while offering superior durability, allow the building to withstand challenging waterfront conditions.

Residents enjoy a ninth-floor wine bar, outdoor roof deck with garden plots, putting green and dog run. Ground-floor spaces connect to waterfront paths, playgrounds and outdoor dining areas.

Two natural gas-fueled rooftop generators augment emergency power systems, allowing residents to shelter in place during emergencies while maintaining essential services.

While the project did not include specific MWESB participation requirements, Howard S. Wright and the project team remained committed to providing opportunities for diverse firms. Team members participated in various outreach efforts at local tradeshows and association events including PBDG, OAME and MCIP. As a result of these efforts, more than $5.4 million in work was awarded to 18 MWESB subcontractors and vendors.

The post The Springs at The Waterfront appeared first on Daily Journal of Commerce.

]]>
Another opportunity for educational improvements /news/2020/01/03/another-opportunity-educational-improvements/ Fri, 03 Jan 2020 21:56:35 +0000 /?p=198240 Builders are keeping busy constructing a replacement for Walnut Grove Elementary School in Vancouver, Washington.

The post Another opportunity for educational improvements appeared first on Daily Journal of Commerce.

]]>
Daryl Liebe, an apprentice carpenter with Local 1503 and an employee of Zavala Corporation, installs a marker for formwork at Walnut Grove Elementary School in Vancouver, Washington. (Josh Kulla/91Ƶ)
Daryl Liebe, an apprentice carpenter with Local 1503 and an employee of Zavala Corporation, installs a marker for formwork at Walnut Grove Elementary School in Vancouver, Washington. (Josh Kulla/91Ƶ)

Successful contractors often have a sweet spot – a type of project in which they excel because of past experience. For Woodburn-based , one of those sweet spots is the elementary school.

Triplett Wellman has at least seven such projects ongoing right now in Oregon and Washington, including one north of the , in central Vancouver. The firm, with Darryl Giorgini serving as superintendent, is building a replacement for aged Walnut Grove Elementary School.

The project is being paid for with money from a $458 million bond approved by voters in February 2017. Construction is taking place on the same property, slightly east of the existing building that was constructed in 1952.

‘ design calls for a two-story building with three distinct wings.

As of Thursday, crews with were continuing to excavate foundation footings on the west end of the site, while operators of heavier machinery performed grading and other site work on the east side. In the middle of the site, a three-person crew from continued below-grade installation of wastewater lines, while another crew from installed conduit.

“Right now we’re working our way out with the footings,” Giorgini said. “We did the perimeter, then the electrical underground and plumbing underground went in because the starting depth on the plumbing is deeper than your footings.”

Mike Coe, a crew foreman with Nutter Excavation, guides the excavation of a trench for underground utility piping. (Josh Kulla/91Ƶ)
Mike Coe, a crew foreman with Nutter Excavation, guides the excavation of a trench for underground utility piping. (Josh Kulla/91Ƶ)
Apprentice plumber Jed Redinger of Piper Mechanical assembles a wastewater branch line. (Josh Kulla/91Ƶ)
Apprentice plumber Jed Redinger of Piper Mechanical assembles a wastewater branch line. (Josh Kulla/91Ƶ)
Carpenters with Zavala Corporation are currently constructing formwork for foundation footings. (Josh Kulla/91Ƶ)
Carpenters with Zavala Corporation are currently constructing formwork for foundation footings. (Josh Kulla/91Ƶ)
Journeyman carpenter Carlos Martinez, a member of Local 1503 and an employee of Zavala Corporation, constructs formwork for foundation footings. (Josh Kulla/91Ƶ)
Journeyman carpenter Carlos Martinez, a member of Local 1503 and an employee of Zavala Corporation, constructs formwork for foundation footings. (Josh Kulla/91Ƶ)
Kyle Ek, right, a journeyman plumber and crew foreman with Piper Mechanical, backfills a wastewater line trench. (Josh Kulla/91Ƶ)
Kyle Ek, right, a journeyman plumber and crew foreman with Piper Mechanical, backfills a wastewater line trench. (Josh Kulla/91Ƶ)
Jed Redinger assembles a wastewater branch line. (Josh Kulla/91Ƶ)
Jed Redinger assembles a wastewater branch line. (Josh Kulla/91Ƶ)
Carpenters Carlos Martinez, left, and Diego Gonzalez construct footing formwork. (Josh Kulla/91Ƶ)
Carpenters Carlos Martinez, left, and Diego Gonzalez construct footing formwork. (Josh Kulla/91Ƶ)
Journeyman carpenter and crew foreman Brian Witman, a member of Local 1503 and an employee of Zavala Corporation, uses a GPS-based surveying system to place markers for footing formwork. (Josh Kulla/91Ƶ)
Journeyman carpenter and crew foreman Brian Witman, a member of Local 1503 and an employee of Zavala Corporation, uses a GPS-based surveying system to place markers for footing formwork. (Josh Kulla/91Ƶ)
(Josh Kulla/91Ƶ)
(Josh Kulla/91Ƶ)
Journeyman carpenters Carlos Martinez, left, and Diego Gonzalez, both members of Local 1503 and employees of Zavala Corporation, construct formwork for a footing. (Josh Kulla/91Ƶ)
Journeyman carpenters Carlos Martinez, left, and Diego Gonzalez, both members of Local 1503 and employees of Zavala Corporation, construct formwork for a footing. (Josh Kulla/91Ƶ)
(Josh Kulla/91Ƶ)
(Josh Kulla/91Ƶ)
Jordan May, an apprentice carpenter with Local 1503 and an employee of Zavala Corporation, drives a stake while constructing formwork. (Josh Kulla/91Ƶ)
Jordan May, an apprentice carpenter with Local 1503 and an employee of Zavala Corporation, drives a stake while constructing formwork. (Josh Kulla/91Ƶ)
Mike Coe guieds an operator while digging a trench. (Josh Kulla/91Ƶ)
Mike Coe guieds an operator while digging a trench. (Josh Kulla/91Ƶ)
Journeyman carpenter Eric Miller, a member of Local 1503 and an employee of Zavala Corporation, constructs formwork. (Josh Kulla/91Ƶ)
Journeyman carpenter Eric Miller, a member of Local 1503 and an employee of Zavala Corporation, constructs formwork. (Josh Kulla/91Ƶ)

The post Another opportunity for educational improvements appeared first on Daily Journal of Commerce.

]]>
Big renovation following ‘a Frankenstein job’ /news/2020/01/02/big-renovation-following-frankenstein-job/ Thu, 02 Jan 2020 22:11:55 +0000 /?p=198132 Structural steel erection for a new gymnasium at Tigard High School is wrapping up as crews approach the end of a two-year, $66 million expansion and renovation project.

The post Big renovation following ‘a Frankenstein job’ appeared first on Daily Journal of Commerce.

]]>
Jose Magaña, an apprentice carpenter with Local 146 and an employee of Fred Shearer & Sons, frames an interior wall at Tigard High School. (Josh Kulla/91Ƶ)
Jose Magaña, an apprentice carpenter with Local 146 and an employee of , frames an interior wall at Tigard High School. (Josh Kulla/91Ƶ)

Structural steel erection for a new gymnasium at Tigard High School is wrapping up as crews approach the end of a two-year, $66 million expansion and renovation project.

The school, constructed during the postwar building boom, has received some 18 remodels over the years. General contractor is carrying out the latest improvements, thanks to money from a $291.3 million bond approved by voters in 2016.

“This high school was built in the 1950s; that was its first iteration,” said Eric Nesse, ‘s bond support administrator. “It’s really been a Frankenstein job with many additions. Our architect has a little historic card with all the different colors from all the different remodels.”

The project, designed by , is taking place in two phases; renovations and new construction are covering a total of approximately 153,000 square feet. In the first phase, workers expanded an existing classroom wing for business and career and technical education, built a new wing with administrative space and a large common area highlighted by a learning stair, installed new turf for athletic fields, and constructed new tennis courts.

In the second phase, now under way, crews are building a new auxiliary gym that will connect with the new common area and an expanded cafeteria.

“There will also be the courtyard,” Nesse said. “And there’s a little breezeway that will be locked with a fence across it to the old building that will create a secure area. Looking into the auxiliary gym area, this is actually sort of a pit. There’s a walkway all the way around the gym that’s kind of sunken like a pit, with the basketball court down below at a lower level.”

All of that is now evident as completion of construction is now in sight.

“We’re in phase two, but there are still some odds and ends to take care of from phase one,” Pence Construction project superintendent Kurt Schwabauer said. “They’ve been using (the new wing) all year and everyone seems to be pretty happy.”

While of Salem is finishing structural steel work for the gym, Fred Shearer & Sons of Beaverton is building walls as well as connecting new structures with existing ones.

“The ironworkers are out there, and now the framers are here from Fred Shearer and they do the interior and exterior framing,” Schwabauer said. “They’ve got a pretty big package; they’re doing the interior and exterior framing (and) they’re doing the drywall and the insulation and the weather barrier.”

Fred Shearer & Sons also is performing finish carpentry and installing custom wooden ceilings throughout much of the new space. Other major subcontractors on the job include and .

“Oregon Cascade has our plumbing and heating package,” Schwabauer said. “Their labor force does the wet side of things, and then they’ve hired Salem Heating to do the dry side.”

For now, crews are scrambling to get roofing into place and the new gym dried in as spring approaches. This summer will mark two years of work on the project.

“With final phase 2 delivery, building turnover (will be) in early August and the parking lot will be done at the end of the summer,” Schwabauer said.

Tyler Klement, an apprentice electrician with Prairie Electric, runs wire through conduit in the new auxiliary gym at Tigard High School. The campus is undergoing a two-phase, $66 million renovation and expansion project. (Josh Kulla/91Ƶ)
Tyler Klement, an apprentice electrician with Prairie Electric, runs wire through conduit in the new auxiliary gym at Tigard High School. The campus is undergoing a two-phase, $66 million renovation and expansion project. (Josh Kulla/91Ƶ)
Structural steel erection is nearly complete on the new gymnasium at Tigard High School. (Josh Kulla/91Ƶ)
Structural steel erection is nearly complete on the new gymnasium at Tigard High School. (Josh Kulla/91Ƶ)
Journeyman ironworker Jim Wright of DSL Builders welds a structural steel beam on the new auxiliary gymnasium at Tigard High School. (Josh Kulla/91Ƶ)
Journeyman ironworker Jim Wright of DSL Builders welds a structural steel beam on the new auxiliary gymnasium at Tigard High School. (Josh Kulla/91Ƶ)
Apprentice carpenter John Holley, a member of Local 1503 and an employee of Pence Kelly Construction, caulks a seam in the weather barrier around a water line. (Josh Kulla/91Ƶ)
Apprentice carpenter John Holley, a member of Local 1503 and an employee of Pence Kelly Construction, caulks a seam in the weather barrier around a water line. (Josh Kulla/91Ƶ)
Journeyman carpenter Judah Webb, an employee of DSL Builders, cuts lumber while framing interior walls at Tigard High School. (Josh Kulla/91Ƶ)
Journeyman carpenter Judah Webb, an employee of DSL Builders, cuts lumber while framing interior walls at Tigard High School. (Josh Kulla/91Ƶ)
The new auxiliary gymnasium will include an elevated walkway around the perimeter. (Josh Kulla/91Ƶ)
The new auxiliary gymnasium will include an elevated walkway around the perimeter. (Josh Kulla/91Ƶ)
Journeyman carpenter Judah Webb, an employee of DSL Builders, carries lumber as his crew frames interior walls at Tigard High School. (Josh Kulla/91Ƶ)
Journeyman carpenter Judah Webb, an employee of DSL Builders, carries lumber as his crew frames interior walls at Tigard High School. (Josh Kulla/91Ƶ)
Journeyman ironworker Zach Sweeten of DSL Builders welds a structural steel beam on the new auxiliary gymnasium. (Josh Kulla/91Ƶ)
Journeyman ironworker Zach Sweeten of DSL Builders welds a structural steel beam on the new auxiliary gymnasium. (Josh Kulla/91Ƶ)
The new cafeteria space is separated from existing food service areas by a temporary wall. (Josh Kulla/91Ƶ)
The new cafeteria space is separated from existing food service areas by a temporary wall. (Josh Kulla/91Ƶ)
A secure interior courtyard for staff and student use is being built as part of the Tigard High School expansion. (Josh Kulla/91Ƶ)
A secure interior courtyard for staff and student use is being built as part of the Tigard High School expansion. (Josh Kulla/91Ƶ)
Journeyman ironworker Jim Wright of DSL Builders grinds a fresh weld. (Josh Kulla/91Ƶ)
Journeyman ironworker Jim Wright of DSL Builders grinds a fresh weld. (Josh Kulla/91Ƶ)
Journeyman carpenter Jeremy Laperl,, an employee of DSL Builders, takes a measurement while framing interior walls at Tigard High School. (Josh Kulla/91Ƶ)
Journeyman carpenter Jeremy Laperl,, an employee of DSL Builders, takes a measurement while framing interior walls at Tigard High School. (Josh Kulla/91Ƶ)
The second phase of construction includes a new kitchen. (Josh Kulla/91Ƶ)
The second phase of construction includes a new kitchen. (Josh Kulla/91Ƶ)
Structural steel erection is nearly complete on the new gymnasium. (Josh Kulla/91Ƶ)
Structural steel erection is nearly complete on the new gymnasium. (Josh Kulla/91Ƶ)

 

The post Big renovation following ‘a Frankenstein job’ appeared first on Daily Journal of Commerce.

]]>
Educational investments taking shape /news/2018/11/15/educational-investments-taking-shape/ Thu, 15 Nov 2018 21:18:00 +0000 /?p=182162 Vancouver Public Schools is putting bond money to work on several sizable construction projects.

The post Educational investments taking shape appeared first on Daily Journal of Commerce.

]]>
Carpenters with DSL Builders frame classroom walls at the Ogden Elementary School project in Vancouver. (Josh Kulla/91Ƶ)
Carpenters with frame classroom walls at the Ogden Elementary School project in Vancouver.

Southwest Washington is abuzz with school construction.

, for instance, has under way multiple projects being for with money from a $458 million bond measure passed by voters in 2017.

On the Washington State University-Vancouver campus, crews are building new space for iTech Preparatory – a STEM (science, technology, engineering and math)-focused magnet school that serves students throughout the district. The school, which opened in 2012, has students in grades 6 through 12; middle school pupils currently attend classes in district administration offices while high school students occupy a leased building on the WSU campus.

“We’ve never had a facility where we could house all the grades at one location,” said Todd Horenstein, an assistant superintendent and director of facility support services for Vancouver Public Schools.

The new building will have approximately 80,000 square feet of space over three stories and be able to serve up to 700 students. of Vancouver designed the facility, which is being built by Hillsboro general contractor .

Tapani Underground crews perform site work at Vancouver Public Schools' iTech Preparatory Academy project. (Josh Kulla/91Ƶ)
crews perform site work at Vancouver Public Schools’ iTech Preparatory Academy project.

The project’s budget is around $30 million, Horenstein said. The building is being constructed to Washington Sustainable Schools Protocol, an energy efficiency process with standards roughly akin to Leadership in Energy and Environmental Design silver, he added.

Currently, site work is under way at one end of the iTech Preparatory site. Meanwhile, ironworkers and carpenters are building formwork and installing rebar in preparation for concrete slab foundation and footer pours.

On Northeast 28th Street in Vancouver, ground was broken this past summer on a replacement for Peter S. Ogden Elementary School. LSW Architects and Robinson Construction are handling this project as well.

The two-story building will be wood-framed over slab-on-grade foundations. It will be able to accommodate as many as about 500 students.

Foundation work already is complete. Currently, first-floor walls, both on the interior and exterior, are being built and placed by crews from DSL Framing.

Meanwhile, on MacArthur Boulevard, two schools are being built anew. Marshall Elementary School and McLoughlin Middle School will be constructed as a single two-story structure on open land between existing facilities.

Carpenters with Skanska USA Building construct formwork for the new Marshall Elementary School in Vancouver.
Carpenters with construct formwork for the new Marshall Elementary School in Vancouver.

The two schools will be physically connected by a shared kitchen and mechanical space, as well as a media center able to be partitioned. However, each school will function separately, Horenstein said.

LSW Architects designed this project too, but Skanska USA Building is the general contractor for this project. Currently, crews from Tapani Underground, Skanska and are carrying out site work, underground utility installation and form work for upcoming foundation concrete pours.

Instead of standard steel or wood framing, however, cross-laminated timber structural elements will be used atop a concrete foundation. This will be one of the first educational buildings in the Portland-metro area to feature such construction.

, another school district in Vancouver, also has projects on tap. Voters in February approved a $695 million bond measure. Numerous construction projects totaling more than $800 million will be completed by 2024, according to the district’s website.

CJ Barton, a journeymen ironworker with Local 29 and an employee of SI Contracting, lays out rebar for foundation formwork at the iTech Preparatory Academy site.
CJ Barton, a journeymen ironworker with Local 29 and an employee of SI Contracting, lays out rebar for foundation formwork at the iTech Preparatory Academy site.
Carpenters Collin O'Connell, left, and David Ramirez, both employees of DSL Builders, frame walls for the new Ogden Elementary School.
Carpenters Collin O’Connell, left, and David Ramirez, both employees of DSL Builders, frame walls for the new Ogden Elementary School.
The new Ogden Elementary School will feature slab-on-grade foundations with two stories of wood-framed office and educational space.
The new Ogden Elementary School will feature slab-on-grade foundations with two stories of wood-framed office and educational space.
Excavation crews with Tapani Underground perform site work at the new iTech Preparatory Academy in Vancouver.
Excavation crews with Tapani Underground perform site work at the new iTech Preparatory Academy in Vancouver.
SI Contracting employees and Ironworkers Local 29 members Ryan Boyer, foreground, and CJ Barton install rebar at the iTech Preparatory Academy site. (Josh Kulla/91Ƶ)
SI Contracting employees and Ironworkers Local 29 members Ryan Boyer, foreground, and CJ Barton install rebar at the iTech Preparatory Academy site.
Tapani Underground employees work at the Ogden Elementary School project in Vancouver.
Tapani Underground employees work at the Ogden Elementary School project in Vancouver.
Carpenters with DSL Builders, from left, Daniel Barnes, Ken Jennings and Chris Johnson build classroom walls at the Ogden Elementary School project in Vancouver.
Carpenters with DSL Builders, from left, Daniel Barnes, Ken Jennings and Chris Johnson build classroom walls at the Ogden Elementary School project in Vancouver.
Mike Smith, a heavy equipment operator with Tapani Underground, works at the iTech Prepatory School site in Vancouver.
Mike Smith, a heavy equipment operator with Tapani Underground, works at the iTech Prepatory School site in Vancouver.
Collin O'Connell, a carpenter with DSL Builders, frames a wall at Ogden Elementary School.
Collin O’Connell, a carpenter with DSL Builders, frames a wall at Ogden Elementary School.
The new iTech Preparatory Academy is one of four new schools currently under construction in the Vancouver Public Schools district.
The new iTech Preparatory Academy is one of four new schools currently under construction in the Vancouver Public Schools district.
Ogden Elementary School is one of four bond-funded campuses being constructed by Vancouver Public Schools.
Ogden Elementary School is one of four bond-funded campuses being constructed by Vancouver Public Schools.

The post Educational investments taking shape appeared first on Daily Journal of Commerce.

]]>
Photos: Major expansion under way in Lake Oswego /news/2018/07/05/photos-major-expansion-under-way-at-lake-oswego-retirement-community/ Thu, 05 Jul 2018 19:31:01 +0000 /?p=177049 A major expansion under way at the Mary’s Woods retirement community will add nine buildings to the Lake Oswego campus.

The post Photos: Major expansion under way in Lake Oswego appeared first on Daily Journal of Commerce.

]]>

A major expansion under way at the Mary’s Woods retirement community will add nine buildings to the campus. General contractor is building The Village at Mary’s Woods, a $100-million-plus project that includes 198 units of independent living space, 48 assisted-living residences, three retail buildings, a community center, and significant site improvements.

is the designer of the project, which spans six acres of former open field space. Site work began in early 2017 with grading, installation of utilities and geopiers, which run eight feet on center under every structure. Construction of buildings commenced last May.

The initial scope of the project was for six new buildings consisting of a mix of independent and , a retail structure, and the community center. After construction had begun, two more retail buildings and a fourth independent living building were added to the project, extending the duration of the project by approximately six months.

The four independent living buildings are all three-story wood-framed buildings over single-level below-grade parking structures. Buyers of the one- and two-bedroom units are being given the option to pick custom finishes, which R&H is keeping track of using a software program it has used on previous projects to track building multiple units with a wide variety of finishes.

Approximately 300 trades workers are currently working on the site, and the contractor has a team of about 15. The project team also includes landscape architects , civil engineers Humber Design Group, and structural engineers Froelich Engineers. The mechanical/electrical/plumbing/fire protection systems are design/build by Prairie Electric, , , and .

The first of the residential buildings is slated for turnover late this year, with two more slated to follow in the coming months. The project is slated for total completion by fall of 2019.

0704_marys_woods_sa_01_web

Tom Keefe, a journeyman sprinkler fitter with Local 669 and employee of Patriot Fire Protection, installs a dry sprinkler system in the attic of an independent living building at The Village at Mary's Woods.
Tom Keefe, a journeyman sprinkler fitter with Local 669 and employee of Patriot Fire Protection, installs a dry sprinkler system in the attic of an independent living building at The Village at .

0704_marys_woods_sa_03_web

Apprentice sprinkler fitter Matt Barry, an employee of Patriot Fire Protection and member of Local 669, threads pipe for an attic fire protection system.
Apprentice sprinkler fitter Matt Barry, an employee of Patriot Fire Protection and member of Local 669, threads pipe for an attic fire protection system.
Terry Brooks, a carpenter with Wood Mechanix, removes a tie-down ring.
Terry Brooks, a carpenter with , removes a tie-down ring.
Carpenter Mike Marsh, an employee of Wood Mechanix, marks an exterior wall for nailing patterns and hold-downs in walls.
Carpenter Mike Marsh, an employee of Wood Mechanix, marks an exterior wall for nailing patterns and hold-downs in walls.

0704_marys_woods_sa_07_web

A carpenter with Wood Mechanix builds the roof of the three-story assisted-living building.
A carpenter with Wood Mechanix builds the roof of the three-story assisted-living building.
Zach Jackson, left, and Joe Vera, both carpenters with Local 1503 and emplyees of Marion Construction, strip forms from a pair of footings.
Zach Jackson, left, and Joe Vera, both carpenters with Local 1503 and emplyees of Marion Construction, strip forms from a pair of footings.
The wood-framed independent living buildings will consist of one- and two-bedroom units, and will be built with custom finishes picked by individual buyers.
The wood-framed independent living buildings will consist of one- and two-bedroom units, and will be built with custom finishes picked by individual buyers.
The three-story wood-framed will have 48 assisted living units.
The three-story wood-framed will have 48 assisted living units.
Mike Masloff, a carpenter with Wood Mechanix, cuts material while performing quality control work on the framing of an independent living building.
Mike Masloff, a carpenter with Wood Mechanix, cuts material while performing quality control work on the framing of an independent living building.

0704_marys_woods_sa_13_web

A three-story steel-framed community building will contain a theater, community dining space, a commercial kitchen, and offices.
A three-story steel-framed community building will contain a theater, community dining space, a commercial kitchen, and offices.
Mike Marsh marks sheeting on an independent living building.
Mike Marsh marks sheeting on an independent living building.

The post Photos: Major expansion under way in Lake Oswego appeared first on Daily Journal of Commerce.

]]>