Women of Vision
By: Sara Martin//June 20, 2011//
R&G Excavating is looking for Sub Contractors for Columbia River Wastewater Treatment Plant. Bid Date June 20.
Sara Martin//June 20, 2011//
R&G Excavating is looking for Sub Contractors to bid on the Columbia River Wastewater Treatment Plant.  The bid date is June 20 at 2:00pm. Please see today’s 91ÊÓÆµ for more details.
Share this!
Bids due: July 15 2016 at 5:00pm
July 1, 2016
Bids due: July 8 2016 at 10:00am
June 29, 2016
Washington county, Oregon. Bid Package: Parking Garage C. Bids are due December 15, 2015 at 2:00 PM.
December 11, 2015
January 14, 2014
January 9, 2014
January 8, 2014
Sign up for your daily digest of 91ÊÓÆµ Oregon Daily News.
Deacon Construction has promoted Jon-Michael Freese to division manager, general construction, for i[...]
Loyda Timmins has joined Doug Bean & Associates as vice president of asset & corporate real estate s[...]
Bassetti Architects, a design studio of HMC Architects, has hired Teresa Kruse as project architect [...]
Bassetti Architects, a design studio of HMC Architects, has hired Justin Brooks as principal-in-char[...]
MWA Architects has named Alan Armstrong a principal. He has 25 years of architectural experience, in[...]
Miller Consulting Engineers has hired Michael Purkey as a structural designer. He recently graduated[...]
SMG Engineers has welcomed Ethan Moser to its ownership team as vice president. He joined SMG in 201[...]
Opsis Architecture has promoted Lauren Loosveldt to principal in recognition of her leadership in de[...]