Sam Tenney//May 14, 2014//
The Sellwood Bridge is closed through Friday, May 16 while crews with Slayden/Sundt install a total of 27 precast concrete girders on the bridge’s east side. The girders measure up to 109 feet long and weigh up to 75,000 pounds, and will extend from the eastern landfall of the structure to above the bank of the Willamette River.