91ÊÓÆµ

Land use review intakes for July 18, 2016

By: Sam Tenney//July 19, 2016//

Land use review intakes for July 18, 2016

Sam Tenney//July 19, 2016//

Listen to this article
  • Early assistance is sought for a proposal to demolish an existing single-family residence and an existing commercial building and construct a four-story multifamily building at 4540 S.E. Milwaukie Ave. The applicant is Mike Coyle of Faster Permits, and the owners are Sandra Hinckley and Philip Steinfeld.
  • Early assistance is requested for a proposal to develop a mixed-use structure with 74 apartments, 22 parking spaces and 97 long-term bicycle parking spaces at 2810 N.E. Broadway. The applicants are Mike Coyle of Faster Permits, Michelle Pak of C2K Architecture and Mark Desbrow of Greenlight Development. The owner is Sami Barbar.
  • A pre-application conference is pending to discuss exterior alterations as part of the remodel of the One Main Place building at 101 S.W. Main St. The applicant is Suzannah Stanley of Mackenzie, and the owner is Madison_OFC One Main Place OR LLC.
  • A pre-application conference is sought to discuss a Type III design review for a new mixed-use building with 178 apartments, ground-floor retail space and underground parking at 2222 N.W. Raleigh St. – the site of the George Morlan Plumbing building. The applicant is Kurt Schultz of SERA Architects, and the owner is Bacchus Investors LLC.
  • A Type III conditional use review is pending to reduce the size of a conditional area to allow surplus property at 4227 N. Lombard St. to be developed under R5 zoning. The applicants are Peter Fry and George Hill of Woodhill Homes, and the owner is St. John Lutheran Church of Portland.
  • A Type III conditional use review is pending to allow for a marijuana grow room in a CG-zoned retail building at 5621 S.E. Center St. The applicant is Aaron Hall of F&H Enterprise LLC, and the owner is Center Street Real Estate Holdings LLC.
  • A Type II design review is pending for a project to remove an existing gate, construct a new gate with associated foundation work and patch brick sidewalk material at the entry to a building at 315 S.W. Fifth Ave. The applicant is Pearse O’Moore of TVA Architects, and the owner is CareOregon Inc.
  • A Type II design review is sought for the conversion of existing office space to a service bay of an auto service business at 132 N.E. Grand Ave. The project would include the remodel of an existing office area, replacement of windows, a new bay door and window trim. The applicant is Richard Stein, and the owner is DNDC Properties LLC.
  • A Type II historic resource review is pending for a request to add two ground-floor windows and a rooftop addition to create a penthouse suite at the historic Harlow Block building at 738 N.W. Glisan St. The applicant is Robert Mawson of Heritage Consulting Group, and the owners are Ganesh Sonpatki and Harlow Param Hotel Corp.
  • A Type II nonconforming situations review is sought for the renovation of an existing retail space at 1415 S.E. Stark St. to continue commercial use in an R1 zone. The applicants are Larry Nutt of Larry Nutt Design Service and Marcus Koch, and the owner is Baker’s Building LLC.

Source: Portland Bureau of Development Services



News

See All News

Commentary

See All Commentary

COMMUNITY CALENDAR