91ÊÓÆµ

F.D. Thomas: SR 432 MP 9.58 to MP 9.93 Cowlitz River Bridge Painting

By: scott.huish//March 9, 2018//

F.D. Thomas: SR 432 MP 9.58 to MP 9.93 Cowlitz River Bridge Painting

scott.huish//March 9, 2018//

Listen to this article
SUB-BIDS REQUESTED
SR 432 MP 9.58 to MP 9.93 Cowlitz River Bridge Painting
Kelso City
Located in Cowlitz County, WA

Owner: Washington State Department of Transportation

Bids Due: 3/14/18 at 11AM
We are requesting bids for the following trades and/or material suppliers: Removing paint line, removing plastic line, removing raised pavement marker, cleaning, sealing and caulking pack rust, testing and disposal of containment waste, replace vacant/damaged rivet with hs bolt, esc lead, inlet protection, erosion/water pollution control, high visibility fence, high visibility silt fence, temporary barrier, temporary impact attentuator, spcc plan, barrier delineator, plastic line, profiled plastic line, raised pavement marker type 2, temporary pavement parking-long duration, project temporary traffic control, pedestrian traffic control, roadside cleanup.

Bid documents can be viewed at or obtained from:

F.D. THOMAS, INC.
217 Bateman Dr
Central Point, OR 97502
Phone: (541) 864-1619 Fax: (541) 664-1105
Email: [email protected]
Mike Kostenko
F. D. Thomas Inc. is a union signatory contractor. Subcontractors must possess a current contractor’s license, insurance coverage and worker’s compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement, 100% payment and performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding, equipment, materials and/or supplies. F. D. Thomas Inc. intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages
CCB# 71234


News

See All News

Commentary

See All Commentary

COMMUNITY CALENDAR