91ÊÓÆµ

Kuney Construction: I84 Graham Road Bridges

By: scott.huish//November 12, 2018//

Kuney Construction: I84 Graham Road Bridges

scott.huish//November 12, 2018//

Listen to this article
SUB-BIDS REQUESTED
I84 Graham Road Bridges
Owner: ODOT
Bids Due: 11/15/18 at 9AM
Subquotes Due: 11/14/18 at 2PM
DBE Goal: 9%

Email: [email protected]

Scope of work identified but not limited to:
Asphalt Milling, Concrete Supply, Concrete Pumping, CIP Barrier, Concrete Flatwork, Demolition, Drainage, Electrical/Illumination, Erosion Control, Fencing, Grading, Ground Improvements, Guardrail, HAZMAT, HMA Paving, Landscaping, Irrigation, Post-Tensioning, Painting, Railing, Retaining Walls, Reinforcing Steel, Sawcutting, Signage, Storm Sewer, Striping, Steel Piling, Structural Steel, Survey, Temporary Concrete Barrier, Traffic Control, TV Inspection, Waterlines, Welding

P.O. Box 4008 Spokane, WA 99220
(509) 535-0651, FAX: (509) 534-6828
EMAIL: [email protected]
Max J. Kuney Company is an Equal Opportunity Employer. Seeking Subcontractor/Suppliers quotes from TERO/Disadvantage/Minority/Woman/Small Business Enterprises. We are a member of the AGC of Washington.