Andersen Construction: Oregon State University Research Way Lab Building

By: scott.huish//May 8, 2019//

Andersen Construction: Oregon State University Research Way Lab Building

scott.huish//May 8, 2019//

Listen to this article
SUB BIDS REQUESTED
Mechanical, Plumbing, Electrical
EARLY TRADE PARTNER SOLICITATION
Oregon State University
Research Way Lab Building
Bids due: 5/24/19 at 2PM
Project Description: Oregon State University intends to renovate and upgrade between 50,000 – 75,000 square foot within the Research Way Laboratory Building (RWLB). This facility will be a key component to accommodate university surge space for research, educational and administrative personnel during future renovations for other research facilities on OSU’s campus. The RWLB will serve as many as 200 principle investigators, research faculty and graduate students.

Key components of the Project include the following:
1. Construction & renovation of flexible wet and dry labs to accommodate multiple types of research.

2. Construction & renovation of new and refurbished research support spaces that are flexible to accommodate a range of needs.

3. Light remodel and renovation of existing wet and dry labs to meet current code and OSU campus standards.

4. Light renovation to collaborative conference and meeting rooms.

5. Light facility office upgrades that can serve as many as 200 FTE (Full time Equivalent) as well as visiting faculty and scholars.

6. Construction and renovation for storage for research collections.

7. Infrastructure upgrades and deferred maintenance to existing plumbing & HVAC equipment.

8. Retro-commissioning and include work with Energy Trust of Oregon to increase energy efficiency of all new and refurbished equipment.

*A non-mandatory project walk-thru will be hosted at the Research Way site on 05/07 at 2:00 PM. Meet at the Front Lobby Entrance (West Elevation)

Documents: SD PHASE DOCUMENTS BY ROWELL BROKAW ARCHITECTS AND PAE ENGINEERS

Bid documents will be available end of day on Monday, April 29th, 2019 to review and download from Andersen’s Egnyte site at:

*All Wage Rates to be BOLI PER OSU REQUIREMENTS

1. RFP is for award of pre-construction contract only. Andersen intends to award construction contract to selected trade partner contingent on satisfactory performance and adherence to cost targets.

Trade partner proposals are due to Andersen Construction by May 24th, 2019 @ 2:00 pm.

SUBMIT PROPOSALS VIA BUILDING CONNECTED.
For information regarding BUILDING CONNECTED, please contact Chris Reetz at the information provided below.

Contacts: All requests for clarification are to be submitted via email to Hayley Sherman [email protected] and Kris Anderson [email protected]. Questions regarding Building Connected to be submitted to Chris Reetz at [email protected]

The cut-off date for all requests for information (RFI’s) shall be Friday, 5/10 at 5:00 PM.

6712 N. Cutter Circle
Portland, OR 97217
Phone 503-283-6712
We are an equal opportunity employer and strongly encourage the participation of emerging small business, women-owned, disadvantaged, disabled veterans and minority enterprises.
CCB# 63053


News

See All News

Commentary

See All Commentary

COMMUNITY CALENDAR