By: scott.huish//January 13, 2020//
scott.huish//January 13, 2020//
| SUB-BIDS REQUESTED | ||||||
| CITY OF BEND MURPHY CORRIDOR IMPROVEMENTS |
||||||
| Bids Due: 2/6/20 at 2PM | ||||||
| K&E Excavating/Hamilton Construction Joint Venture is requesting Subcontractor Proposals that provide the best combination of qualifications and price for the following Scope of Work:
Bid Package #2 Concrete 鈥 2,705 SY Plain Concrete Pavement, Dowelled, 9 Inch Thick; 4 EA Plain Concrete Pavement, Transition to HMAC; 508 SF Concrete Driveways; 1,434 SF Concrete Driveways, Reinforced; 9,752 SF Concrete Walks; 10 EA Extra for ADA Curb Ramps; 352 SF Truncated Dome Detectible Warnings; 3,287 SF Concrete Aprons, Patterned Colored Conc Surfacing; 2,840 SF Concrete Medians, Patterned Colored Conc Surfacing; 923 LF Concrete Curbs, High Strength Low Profile Mountable; 1,152 LF Concrete Curbs, 14 Inch Standard Curb; 346 LF Concrete Curbs , High Strength 14鈥 Standard Curb; 1,048 LF Concrete Curbs, High Strength Curb and Gutter; 52 LF Concrete Curbs, High Strength Wide Modified Median Curb; 163 LF Concrete Curbs, High Strength Wide Modified Truck Apron Curb; 384 SF Concrete Walks at Splitter Islands; 4 EA Concrete Median End; and 1,755 SF Concrete Walks with Thickened Edge for Brosterhous Roundabout. For Bid Documents Contact: |
||||||
|
||||||
| We are an Equal Opportunity Employer and request Sub Bids from Minority, Women, Disadvantaged and Emerging Small Business Enterprises | ||||||
| CCB# 128542 CCB#13877 |
||||||