| D/M/WBE Goal 14%; ESB Goal 6%; Total Goal: 20%
Improvements shall consist of those items of work listed in the Proposal and as shown on the accompanying Plans. The Contractor shall perform all labor, and furnish all materials, equipment and incidentals required to make each item complete. Work shall include, but not be limited to:
- Construct, maintain, and remove temporary work zone traffic control measures.
- Construct, maintain, and remove erosion control measures.
- Perform all removal of structures and obstruction, clearing and grubbing, and earthwork operations.
- Construct drainage system including water quality facilities, sewer pipes, manholes and inlets.
- Construct roadway improvements including cold planning, aggregate base, MWMAC wearing surfaces, concrete curb and sidewalks.
- Place pavement markings and striping
- Install signing
- Install illumination
- Install traffic signals
- Roadside development
Subcontracting and supplier opportunities are available but not limited to the following
scopes of work: quality control testing subcontractor; flagging/traffic control subcontractor;
surveying subcontractor; demolition subcontractor; site clean up subcontractor; contaminated
soil remediation subcontractor; concrete supplier; cast-in-place concrete subcontractor;
saw cutting subcontractor; signage subcontractor; electrical subcontractor; clearing &
grubbing subcontractor; fill & backfill subcontractor; excavation subcontractor; erosion
control subcontractor; asphalt paving subcontractor; aggregate supplier; curbs, gutters &
sidewalks subcontractor; pavement marking subcontractor; fencing subcontractor; landscaping
subcontractor; underground utilities subcontractor; trucking (dump trucks) subcontractor;
pollution control subcontractor.
Plans and Specifications are available online at
Bids can be submitted via email: [email protected] |