| CITY OF BEND MURPHY CORRIDOR IMPROVEMENTS |
||||||
| Bids Due: 6/11/20 between 1pm & 2pm Bid Opening: 6/11/20 @ 2pm |
||||||
| K&E Excavating/Hamilton Construction Joint Venture is requesting Subcontractor Bids for the following Scope of Work:
Bid Package #4 Reinforcing Steel Install (Material to be supplied by general) – 272,400 LBS Place Reinforcement, Grade 60; 7,515 SF Deck SBU’s; 51,086 LBS Place End Panel Rebar; 2,365 SF End Panel Rebar Standees; 27,145 LBS Place Combination Bridge Rail Reinforcement; 36,046 LBS Place Moment Slab Reinforcement; 16,242 LBS Place Retaining Wall No. 3 Reinforcement; 2,310 LBS Place Retaining Wall No. 5 Reinforcement; and 7,578 LBS Place Retaining Wall No. 5A Reinforcement. For Bid Documents Contact: |
||||||
|
||||||