SUB-BIDS REQUESTED
CITY OF BEND
MURPHY CORRIDOR IMPROVEMENTS
Bids Due: 6/11/20 between 1pm & 2pm
Bid Opening: 6/11/20 @ 2pm
K&E Excavating/Hamilton Construction Joint Venture is requesting Subcontractor Bids for the following Scope of Work:

Bid Package #2 Concrete – 25 EA Concrete Pads, 6 Inch Depth; 5,751 SF Concrete Driveways; 1,392 SF Concrete Driveways, Reinforced; 60,508 SF Concrete Walks; 20 EA Extra for ADA Curb Ramps; 334 SF Truncated Dome Detectible Warnings; 1,354 SF Concrete Medians, Patterned Colored Conc Surfacing; 69 LF Concrete Curbs, Low Profile Mountable; 41 LF Concrete Curbs, 12 Inch Standard Curb; 8,997 LF Concrete Curbs, 14 Inch Standard Curb; 44 SF Concrete Walks at Splitter Islands; 456 SF Concrete Walks with Thickened Edge; and 3 EA Concrete Median End for Murphy Road.

For Bid Documents Contact:
John Kuenzi – [email protected], 503-932-8103

ÌýÌýÌý
Hand Deliver to:
K&E Excavating Redmond Office
597 SW Veterans Way
Redmond, OR 97756
We are an Equal Opportunity Employer and request Sub Bids from Minority, Women, Disadvantaged and Emerging Small Business Enterprises
CCB# 128542