By: scott.huish//June 24, 2020//
scott.huish//June 24, 2020//
| SUB BIDS REQUESTED | ||||||
| Marshall High School Pre-Engineered Metal Building 3905 SE 91st Portland, OR 97216 |
||||||
| Bids Due: 7/17/20 by 2 PM | ||||||
| Andersen Construction is soliciting bids for a pre-engineered metal building that will be built at Marshall High School.
The current scope bidding is the engineering and supply of the metal building. The upcoming scopes that will bid in late summer will include the remaining trade packages including but not limited to excavation, structural concrete, erection of the pre-engineered metal building, interior framing and drywall, electrical, plumbing, mechanical, insulation, flooring, painting, landscape, and site concrete. Documents will be made available through Building Connected. Please submit questions via email by 7/9/20 to: Submit Bids through Building Connected using the appropriate bid form by 7/17/20 (see specific instructions in the formal Invitation to Bid Instructions document) |
||||||
|
||||||
| We are an equal opportunity employer and strongly encourage the participation of emerging small business, women-owned, disadvantaged, disabled veterans and minority enterprises. | ||||||
| CCB# 63053 | ||||||