Location: HillsboroThe project team led by general contractor JE Dunn Construction was faced with a two-pronged challenge when they took on the seismic retrofit of Washington County’s Charles D. Cameron Public Services Building in Hillsboro.
First, they had to figure out a way to modernize and seismically strengthen a 30-year-old building built with reinforced concrete and suffering from water intrusion problems in the basement. That would normally be enough for one project. But the team, which also included Sera Architects and KPFF Consulting Engineers, also had to do all this while maintaining normal building operations in the 120,750-square-foot facility.
The phased project that resulted accomplished all that, however, and provided the county with an essentially new structure built to withstand a magnitude 9.0 earthquake and remain functional in the aftermath. It also features energy-efficient upgrades to mechanical, lighting and security systems.
Essentially laid out in the shape of a T with two distinct wings, the building was upgraded one wing at a time to allow operations to continue, including the county’s critical data center. This allowed crews to minimize any invasive work during structural upgrades, which include installation of massive steel buckling restraint brace beams and concrete shear walls at building corners. The team thoroughly investigated original building plans, mapped existing utilities and demolished certain parts of the building strategically to help design and carry out the project on time and on budget.