REQUESTING ABATEMENT
SUBCONTRACTOR PROPOSALS
JEWETT ELEMENTARY SCHOOL
REMODEL & MEP UPGRADES
BID DATE: 3/18/21 @ 2PM
June 2021 through August 2021
January 2021 BOLI Rates Apply
Public Works Bond Required
Background Checks MandatoryRequests supplier & subcontractor bids the following scopes:
Selective Demolition, Concrete, Metal Fabrications, Rough Carpentry, Beam  Strengthening, Ther mal Insulation, Weather Barriers, Roofing (asphalt shingle, metal panels, modified bituminous),  Metal Wall Panels, Sheet Metal Flashings  & Trims, Roof Accessories, Joint Sealants, Gypsum  Board Assemblies, Non-Structural Metal Framing, Acoustical Ceilings, Painting, Fall Protection   Systems (design build), Fire Sprinkler System Remodel (design build),  Plumbing Remodel  (including Natural Gas Piping), HVAC Remodel, Electrical Remodel (including  IT, Data, Low Volt age, Fire Alarm, Communication  Systems), Survey, Earthwork, AC Paving, Site Concrete, Fences  and Gates, Landscaping & Irrigation, Utilities (see Electrical Pages)

Project Location: Central Point, Oregon
BID DATE: 3/18/21 @ 2PM

Submit Bids to: [email protected] Non-Mandatory
Job Walks March 3rd and 10th @ 11 AM  
RFI’s due by 2 PM March 12th to [email protected]
All bids must be submitted by March 18th, 2021 @ 2P.M. Thank You.

8425 Agate Road, White City, OR
Phone: (541) 826-5668
FAX: (541) 826-5536
We are an equal opportunity Employer requesting bids from qualified M/W/DVBE/SBE subcontractors and suppliers.

Bid documents include plans, specifications, sample subcontract, insurance requirements, preliminary project  schedule, template pay application, template change order request form, sample payment and performance bond  forms (required for scopes greater than $100,000), and safety requirements. It is the responsibility of each proposer to review the full set of bid documents and include all associated costs in their proposal. Failure to include costs as sociated with items stated in the bid documents will not constitute grounds for a change order.

CA LIC: 993926