91视频

LMC Construction: Block 290 Apartments

By: scott.huish//November 15, 2021//

LMC Construction: Block 290 Apartments

scott.huish//November 15, 2021//

Listen to this article
SUB-BIDS REQUESTED
BLOCK 290 APARTMENTS
PORTLAND, OR
Bids Due: 12/8/2021 at 5 PM
Pre-Bid RFI鈥檚 Due: 11/30/2021at 12:00 PM PST
Block 290 is a new mixed-use construction project that consists of a single
seven-story building comprised of 200 residential units, resident amenity spaces, ground floor retail, and a sub-grade parking garage located in the 鈥淪labtown鈥 area of NW Portland. The upper five (5) floors will be wood-framed construction, while the lower two floors and the parking garage will be post-tension concrete structures with light-gauge metal framing. The scope of work includes demolition of the existing structure onsite, full site development, construction of the building including retail 鈥渨arm shell鈥 and Right-Of-Way improvements.The following scopes of work have been awarded and are not open for bidding: Abatement, Shoring, Fire Suppression, Plumbing, HVAC, and Electrical.
All other trades/scopes of work are open for bid.
Private wage rates apply to this project (no BOLI or Davis Bacon).

Bid Documents:

Bid Contacts:
Scott Dekker ([email protected]) &
Mike Kolodziejczak ([email protected])

19200 SW Teton Ave.
Tualatin, OR 97062
P: 503.646.0521 F: 503.646.6823
We are an equal opportunity employer and strongly encourage the participation of emerging small business, women-owned, disadvantaged, disabled veterans and minority enterprises.
CCB# 161282


News

See All News

Commentary

See All Commentary

COMMUNITY CALENDAR