Design review is pending for 544 S.E. Oak St. The proposal calls for replacement and reconfiguration of the existing sidewalk-grade door on the Oak Street façade with one that meets ADA requirements. The existing Sixth Avenue roll-up door would be replaced with an accordion glass door. The existing mezzanine windows would be replaced with new ones at the pedestrian/sidewalk level.
Early assistance is pending for 1010 S.W. Gibbs St. The proposal calls for a mixed-use development above a one-level parking garage. The building would hold 32 multifamily units and approximately 10,000 square feet of retail space.
Early assistance is pending for environmental cleanup of property along North Time Oil Road (within the 97203 zip code). Plans call for cleanup work, building demolition and site grading.
Early assistance is pending for a new four-story, 25-unit affordable housing development at 8026 S.W. 31st Ave. The building would include a community area, a covered garden and a gas fire pit (or exterior fireplace). The structure would include a daylit basement and a structured parking garage. Flow-through planters would serve as storm retention and landscaping features.
Early assistance is pending for development of two adjacent properties, at 5816 N. Harvard St. The existing houses would be demolished, and a new triplex would be constructed at 5828 N. Harvard St. and a new fourplex would be built at 5816 N. Harvard St. The developments would be designed as townhomes per residential building code.
Early assistance is pending for Meridian Gardens, at 11250 S.E. Division St. The proposal calls for construction of a supportive recovery building with 85 units that would consist of single-room-occupancy and studio units.
A Type 3 procedure (historic resource review with modifications) is pending for a renovation at 1839 N.E. 14th Ave. The existing six-story, 95-unit apartment building would gain a property management office and a community room on the ground floor. Work would include installation of new exterior cladding, HVAC upgrades, site upgrades, and a nonconforming upgrade.