Bremik Construction: Canby High School – Early Work Packages

By: scott.huish//January 17, 2022//

Bremik Construction: Canby High School – Early Work Packages

scott.huish//January 17, 2022//

Listen to this article
SUB-BIDS REQUESTED
Canby High School –
Early Work Packages
Proposals Due: January 27th, 2022, at 2:00 PM
The project scope consists of partial demolition of the existing high school building and outbuildings, construction of a new approx. 32,000 square foot
classroom addition with associated site development, renovation and/or replacement of existing systems and assemblies within existing building and selective seismic upgrades.

Scopes that are currently being bid:

Hazardous Material Abatement; Building Demolition; Supply of Metal Decking; Supply of Dowel Laminated Timber; Supply of Metal Web Wood Joists; Roofing; Pole Buildings (Design-Build)

Milestone Dates:
Job Walk: January 20, 2022 at 3:30 PM
Proposals Due: January 27th, 2022, at 2:00 PM
Bids to [email protected] and [email protected]

BOLI Commercial Prevailing Wage Rates are a requirement for this project.
For more information, visit

1026 SE Stark St., Portland, OR 97214
PH: 503.688.1000 | FAX: 503.688.1005
Bremik Construction, Inc. is an equal opportunity employer & requests sub-bids from all interested firms including Minority & Women Owned, Emerging Small Business & Disadvantaged enterprises.
CCB# 160383