Design review is pending for a proposal to construct a 12-story, 98-unit affordable housing building at 2059 S.W. Park Ave. The building would rise upon a 6,016-square-foot parcel. Mass-plywood panels and light gauge steel would be used for the structure. Ralph Tahran of Tahran Architecture & Planning is the applicant and Park Avenue PSU LLC is the project owner.
Environmental review is pending for a proposal to construct a 17-unit building at 1297 S.W. Cardinell Drive. The proposal calls for access to come from Southwest Cardinell Drive. Modifications to the combined sewer overflow connection and eco-roof standard are requested. The site is located within the environmental conservation overlay zone. Li Alligood of Otak is the applicant and HD Cardinell LLC is the project owner.
An application for early assistance is pending for a proposal to create a Panda Express restaurant with a drive-thru, at 4102 S.E. Powell Blvd. The proposal calls for alterations to the Tecos Fresh Mexican Food restaurant adjacent to the property and modification of the drive-thru entrance to eliminate direct access from Southeast Powell Boulevard. Vu Le of Klover Architects is the applicant and AKG/4102-4132 LLC is the project owner.
A pre-application conference is sought for a proposal to construct an eight-story, 120,000-square-foot residential building at 240 S.E. Grand Ave. Plans call for 141 units within a cross-laminated timber structure. There would be 64 stalls of below-grade parking with access from Southeast Pine Street. Robert Thompson of TVA Architects is the applicant and Grand Opportunity LLC is the project owner.
An application for early assistance is pending for a proposal to construct a new Chick-fil-A restaurant at 9950 S.E. Stark St. The site’s existing 7,012-square-foot building would be demolished. The new 4,991-square-foot building would have 98 indoor seats, 12 patio seats, a drive-thru and outdoor canopies. Andrew Hunt of 4G Development and Consulting is the applicant and Northwest Restaurant Real Estate LLC is the project owner.
An application for early assistance is pending for a proposal to construct a pre-engineered metal building at 3830 S.E. 21st Ave. The warehouse would be 3,600 square feet, have no sprinklers, and be used for storage of equipment and supplies. The applicants are Dan Schwoerer of Bullseye Connection Gallery and Zac Arino of CIDA Inc. The project owner is Bullseye Glass.
Design advice is pending for a proposal to construct a seven-story, 94-unit affordable housing building along North Broadway (within the 97227 zip code). It is the first project within the Albina Vision Trust master plan. The project is subject to a Type 3 procedure, but the applicant is opting for Type 2. In addition to the apartments, the building would have residential services, a community room, and property management spaces. The applicants are Chandra Robinson and Ashley Koger of LEVER Architecture. The project owner is Paramount Parking LLC.