By: scott.huish//October 14, 2024//
scott.huish//October 14, 2024//
| SUB-BIDS REQUESTED | ||||||
| OR86: Guardrail Upgrades Final Phase ODOT |
||||||
| Bid Date: October 24th, 2024 at 9:00 AM | ||||||
| The following are the items of work DBE subcontractors and suppliers are wanted for. They include, but are not limited to: Temporary Protection and Direction of Traffic, Temporary Signs, Portable Changeable Message Signs, Flaggers, Automated Flagger Assistance Device, Temporary Barricades – Type III, Temporary Plastic Drums, Temporary Striping, Temporary Pavement Bars, Temporary Transverse Rumble Strips, Stripe Removal, Bar Removal, Portable Traffic Signal, Erosion Control, Pollution Control Plan, Work Containment Plan, Lead Compliance Plan, Construction Survey Work, 3 Tube Curb Mount Rail – Modified, Bridge Removal Work – Parapet Rail, Concrete Repair, Resin Buildup over Shallow Rebar and Longitudinal Pavement Markings – Paint. | ||||||
|
||||||
| Our company is an equal opportunity employer and request sub-bids from Minority, Women, Disadvantaged, Disabled Veterans or Emerging Small Business Enterprises. | ||||||
| CCB #26599 | ||||||