By: 91ÊÓÆµ Staff//March 23, 2010//
91ÊÓÆµ Staff//March 23, 2010//
Bid Date/Time: April 1, 4:30 p.m.
Southwestern Oregon Community College is seeking qualifications from general construction firms for the construction of the Brookings campus project.
Work will include construction of a paved entry road with a 10-foot-wide pedestrian path and associated utilities. Removal of approximately 50,000 to 75,000 yards of earth rock will be required to level the site.
The campus building will be two stories and approximately 27,000 square feet. It will be constructed on approximately 2½ acres of the 10-acre site. The building is slab on grade with thickened footing. The second floor will be a metal deck and concrete systems supported on steel columns and beam with steel-brace frames for lateral support. The first-floor walls will be a wood stud infill with some metal stud work at stairways. The second floor will be wood frame with plywood shear walls and a gang-nail roof truss system supporting metal roofing. Approximately 6,000 square feet of the building will be proposed as an alternate bid.
Site work includes parking for approximately 110 cars, filter strips, bio-swales and retention pond to control storm-water runoff. Site work also includes paving, concrete flat work, landscaping, irrigation and site lights.
The estimated cost of the project is $5 million to $10 million.