Dan Carter//December 28, 2010//

Brandon Hubbard, left, and Andy McBride with Schommer & Sons demolish a ramp to the second floor of a building in downtown Portland. The second floor of the two-story building at 528 S.W. 12th Ave. is used for overflow parking for a nearby hotel. The general contractor is preparing to rebuild the ramp.