Bid Date/Time: March 3, 10 a.m.
This project consists of providing the Port of Olympia with a new groundwater treatment plant, which includes pumps, tanks, an oil/water separator and an activated carbon system.
The project also includes a pre-engineered building to house the groundwater treatment plant and facilities for operating staff and a new outfall pipe. The existing groundwater pumps and associated electrical, instrumentation, controls and piping system will continue to be used and incorporated into the new plant.
The estimated cost for the project is from $2 million to $2.6 million.