RFP: Engineering Services for Barton CSO Beach Project

By: Betty Oden//March 15, 2011//

RFP: Engineering Services for Barton CSO Beach Project

Betty Oden//March 15, 2011//

Listen to this article

Bid Date/Time: April 8, 5 p.m.
Proposals are being sought from qualified firms interested in providing final design engineering and related services for the Barton combined sewer overflow project in Seattle.

The consultant selected for this contract will provide predesign, final design and engineering services during construction of the Barton CSO project using green storm-water infrastructure.

The total project planning-level cost estimate for design and construction is $17 million and notice of the selected firm is scheduled to be issued May 25.