This project consists of a request for proposals from qualified mechanical and electrical subcontractors for the design-build services of the MACC TV studio and production facility in Beaverton.

The subcontractor must be able to design and construct a television studio, signal transmission facilities, all HVAC and electrical equipment and related materials. These include all items related to signal acquisition, signal transmission and broadcasting, lighting, sound, soundproofing, and environmental controls for the entire studio and facility.

The project is scheduled to be completed Oct. 31, 2012.