Sam Tenney//November 9, 2011//

A drilling shaft is lowered into a cofferdam that will form the foundation of the Portland-Milwaukie light rail bridge’s west tower. The shaft, which is around 10 feet in diameter, will be used to drill to a depth of more than 150 feet, after which drilling spoils will be removed and foundation forms will be lowered into the casing.