By: Hilary Dorsey//February 9, 2026//
Hilary Dorsey//February 9, 2026//
A weekly list of the most notable commercial building and facility permits issued and received in Portland by Permitting & Development in the prior week.
$9,862,068 Â Â Â Â
Address: 11707 N.E. Airport Way
Applicant: Kyron Christman of Faster Permits
Owner: Fortuna PDX LLC of Vancouver, Washington
Contractor: Josh Eubank (Robertson & Olson Construction of Camas, Washington)
Plans call for a remodel of a hotel.
$593,685 Â Â Â Â Â
Address: 5105 S.E. Hawthorne Blvd.Â
Applicant: Sean Barnett of Polymath Studio Architecture
Owner: Tulp LLC
Contractor: Emmett Phair Construction of Lake Oswego
Plans call for a tenant improvement to suit a new office tenant. It will involve footprint expansion and a second-floor addition. Site work will include a new curb cut.
UNDER INSPECTION
$1,200,000 Â Â Â Â
Address: 1285 N. Liberty St.Â
Applicant: not listed
Owner: not listed
Contractor: Vick Homes Inc.
Plans call for new construction of a three-story nine-unit apartment building.
UNDER INSPECTION
$9,534,960 Â Â Â Â Â
Address: 8025 S.W. 19th Ave.Â
Applicant: not listed
Owner: not listed
Contractor: Larry Kennebeck (Todd Construction of Tualatin)
Plans call for construction of a four-story building (Barbur Apartments’ Building C) with 28 units and associated site work.
UNDER INSPECTION
$33,233,500 Â Â Â Â Â
Address: 8090 S.W. Capitol Hill Road
Applicant: not listed
Owner: not listed
Contractor: Larry Kennebeck (Todd Construction of Tualatin)
Plans call for construction of a four-story, 100,508-square-foot building (Barbur Apartments’ Building B) with 113 units and associated site work. A cell tower and related easement will remain.
UNDER INSPECTION
$3,517,752 Â Â Â Â Â Â
Address: 8066 S.W. Capitol Hill Road
Applicant: not listed
Owner: not listed
Contractor: Larry Kennebeck (Todd Construction of Tualatin)
Plans call for construction of a three-story building (Barbur Apartments’ Building A) with nine units and associated site work.
UNDER REVIEW
$1,000,000 Â Â Â
Address: 10405 E. Burnside St.Â
Applicant: RJ Nueske of Stantec
Owner: Balsiger Southwood LLCÂ
Contractor: Probuild Contractors of Henderson, Nevada
Plans call for repairing fire damage to six units in the three-story building. The work would include repairing exterior damage to the roof, walls, decks and stairs. A small addition is planned for a fire pump room.
UNDER REVIEW
$750,000Ìý
Address: 6308 N. Marine Drive
Applicant: Edward Schoch of Raymond West
Owner: 6204-6308 North Marine Drive LLC of Carlsbad, CaliforniaÂ
Contractor: Raymond Handling Concepts Corp. of Fremont, California
Plans call for installing racking in the facility.
UNDER REVIEW
$2,800,000 Â Â
Address: Gilbert Park Elementary School, at 13132 S.E. Ramona St.
Applicant: Nathan Arnold of Faster Permits
Owner: School District No. 40
Contractor: out to bid
Plans call for performing HVAC upgrades and roof repairs, upgrading electrical service for the school building and the gym, and installing a canopy to connect the two structures.
UNDER REVIEW
$1,750,000 Â Â
Address: 1101 S.W. Bray Lane
Applicant: Gary Datka of Portland Parks and Recreation
Owner: city of PortlandÂ
Contractor: out to bid
Plans call for reconstructing a portion of the trail to meet accessible standards. The work would include construction of a parking lot as well as renovation of connections to other unpaved trails, seasonal drainage crossings, site walls, benches and the picnic area.
UNDER REVIEW
$10,674,067 Â Â Â
Address: 2017 S.E. Sixth Ave.Â
Applicant: Glen Pak of GBD Architects
Owner: Goodwill Industries of the Columbia WillametteÂ
Contractor: Pence Contractors of Lake Oswego
Plans call for construction of a two-story building. The ground floor would hold structured parking for employees only and an entrance lobby, and the second floor would have offices and classrooms as well as administrative space and a reception area.
$1,051,813 Â Â Â Â Â
Address: Benson High School, at 546 N.E. 12th Ave.Â
Applicant: Nicholas Sukkau of Portland Public Schools
Owner: School District No. 1
Contractor: Steve Malany (P&C Construction)
Roof repairs will involve minor demolition of sections on three buildings. It will also involve installing insulation at parapets and reroofing affected areas and finishes.
$1,700,000 Â Â Â Â Â Â
Address: 808 S.E. Alder St.Â
Applicant: not listed
Owner: not listed
Contractor: Sandy Mills (Deform NW)
A tenant improvement on the second and third floors will suit first-time tenant Pacific Diabetes Technologies. The work will involve minor demolition and construction of walls. The second floor will gain an entry area, a metrology office, a huddle nook, a clean room vestibule, storage/​materials handling, a process development area, and a conference room. The third floor will gain a reception area, offices, a huddle room and nook, storage rooms, workstation areas, a break room, a wet lab, a quality engineering room, a doc vault, a gas/​pump room, a clean room, a clean room vestibule, and a conference room. The work will also involve ceiling, flooring, finishes, plumbing and electrical.
UNDER REVIEW
$2,110,762 Â Â Â
Address: Portland Community College, at 12000 S.W. 49th Ave.Â
Applicant: Christina Larson of Varitone Architecture of Albany
Owner: Portland Community CollegeÂ
Contractor: out to bid
Plans call for renovating the social sciences building. The exterior work would involve installing roof top units, an air handling unit, louvers, and a hot water coil pump. The interior work would involve installing terminal units, piping, ductwork, diffusers, grilles and electrical.
UNDER REVIEW
$6,820,581 Â Â Â
Address: Portland Community College, at 12000 S.W. 49th Ave.Â
Applicant: Christina Larson of Varitone Architecture of Albany
Owner: Portland Community CollegeÂ
Contractor: Shelton Davis (Lease Crutcher Lewis)
Plans call for renovating the social sciences building. The exterior work would involve infilling the skylight, demolishing and infilling storefronts on the northeast, southeast and northwest elevations, and refinishing remaining storefronts on the northeast and southwest elevations. The first-floor work would involve demolishing walls and adding new ones to create general purpose classrooms, a break/​work room, a central gathering area, meeting rooms, Zoom rooms, offices, a storage room, and an open office area. It would also involve remodeling a bunker. The second-floor work would involve remodeling the computer lab and flex space. The work would also involve ceiling, flooring, finishes, plumbing and electrical.
Source: Portland Permitting & DevelopmentÂ
See also: